Minnesota Department of Transportation

511 Travel Info

Minnesota state highway projects

Construction projects, plans, and studies

Updated April 19, 2021

Search for a project


2021 construction projects and interactive map

Browse by region

District Offices MnDOT District 7 - Mankato/Windom Metro District - St Paul/Minneapolis MnDOT District 8 - Marshall/Wilmar/Hutchinson MnDOT District 1 - Duluth/Virginia MnDOT District 4 - Detroit Lakes/Morris MnDOT District 2 - Bemidji/Crookston MnDOT District 3 - Baxter/St Cloud MnDOT District 6 - Rochester/Owatonna








Browse by stage








Browse by highway number



Hwys 1–9

Hwys 1 and 59 — Thief River Falls

Construct 3 roundabouts on Hwy 1 at Brooks Avenue, Barzen Avenue and the intersection with Hwy 59

  • Construction dates: Summer 2020 - 2021

Hwy 1 — Thief River Falls resurfacing

Resurface Hwy 1 between Hwy 219 and Pennington County Road 18

  • Scheduled for construction in 2021

Hwys 1, 53 and 73 — Itasca and St. Louis counties

Resurface Hwy 1 from Hwy 65 to Hwy 53 and on Hwy 73 from Hwy 1 to Hwy 53 and intersection improvement at County Road 115/Ashawa Road north junction Hwy 1 in Itasca and St. Louis counties.

  • Construction dates: July to October 2020, and May to October 2021
  • Traffic impacts: Lane closures

Hwy 2 — Bemidji

Reduced Conflict Intersections (RCI's) will be constructed on Hwy 2 between Beltrami County Road 14, in Wilton, and Beltrami County Road 9. 48 new LED lighting units will also be installed along the corridor to improve lighting and safety.

  • Construction scheduled for May-July 2021

Hwy 2 — Crookston

Resurface Hwy 2 from Hwy 9 to Hwy 32 east of Crookston

  • Construction scheduled for 2021

Hwy 2 — Cass Lake

Resurface Hwy 2 between Hubbard CR 46 and Hwy 371

  • Construction scheduled for 2021

Hwy 2 — Cass County trail

Construct pedestrian/bike trail along north side of Hwy 2

  • Construction scheduled for summer 2021

Hwy 2 — Itasca

Repave 19 miles of Hwy 2 from Prairie River to two miles east of Hwy 65

  • Construction scheduled for 2021

Hwy 2 — Saginaw

Construct a roundabout at the intersection of Hwy 2 and Hwy 194 in Saginaw

  • Construction scheduled for 2023

Hwy 2 — Cass Lake multi-use trail

Construct multi-use trail along Hwy 2 in Bena.

  • Scheduled for construction in summer 2021

Hwy 2 — Cass Lake

Grade and resurface Hwy 2 East of Cass Lake to Cass County road 10.

  • Scheduled for construction in 2021

Hwy 2 — LaPrairie

Pavement rehabilitation, pedestrian, intersection, and ADA upgrades in the City of LaPrairie

  • Scheduled for construction in 2024

Hwy 2 and Hwy 65 — Swan River roundabout

Construct roundabout

  • Scheduled for construction in 2023

Hwy 2 — East Grand Forks

  • Scheduled for construction in 2021

Hwy 2 — Marcoux Corner

A Reduced Conflict Intersection (RCI) is scheduled to be constructed on Hwy 2 at the intersection with Hwy 32 near Marcoux Corner.

  • Scheduled for construction in 2021

Hwy 2 Corridor Study — Fosston

The City of Fosston is conducting a corridor study to evaluate the transportation and pedestrian needs of Highway 2 in Fosston. 

  • 2020-2021

Hwy 3/Robert Street — Saint Paul

Repair Robert Street Bridge over the Mississippi River.

  • Construction dates: 2020-2026. Preventative maintenance began summer 2020.

Hwy 3 — Rosemount to Farmington

Evaluate the Hwy 3 corridor from 160 St. in Rosemount to 2nd St. in Farmington in order to identify possible improvements to improve safety, on Hwy 3 for motorists, pedestrians and bicyclists.

  • Study dates: February through December 2021

Hwy 4 — Meire Grove

Reconstruct and improve pedestrian access from Second Avenue South to Second Avenue North in Meire Grove, Stearns County.

  • Construction: July-October 2021
  • Impacts: Detour

Hwy 5/Minnehaha Avenue and Stillwater Road — St. Paul to Maplewood

Safety, maintenance and accessibility improvements are needed on Hwy 5/Minnehaha Ave. and Stillwater Rd. from North Mendota St. to Century Ave. in St. Paul and Maplewood. The project will include repaving, maintenance, sidewalk repairs, and accessibility for all.

  • Construction: July 2023 through November 2025

Hwy 5/East 7th Street and Hwy 61/Arcade Street — St. Paul

Safety and accessibility improvements are needed on Hwy 5 and Hwy 61 from I-94 to Roselawn Ave. in St. Paul. The project will include repaving, sidewalk repairs, and accessibility for all.

  • Construction: April 2024 through October 2025

Hwy 5 — Gaylord Corridor Study

MnDOT, Sibley County, and the City of Gaylord are conducting a study of Hwy 5 to plan for future transportation improvements that align with community growth.

Hwy 5 — Saint Paul

Replace joints and sidewalk on the bridge south of Hwy 61 over the BNSF and CP railroads.

  • Construction: May through August 2021
  • Traffic impacts: Possible lane and shoulder closures

Hwy 6 — Itasca County

Resurface 10 miles of Hwy 6 from the Cass/Itasca county line to Hwy 2 west of Cohasset, replace pipes and reconstruct the access at Itasca Co. Rd. 11.

  • Construction: May to July 2021
  • Impacts: Detour

Hwy 7 — Safety Study

Complete a safety study of Hwy 7 from just east of Hutchinson to County Road 9 in Lester Prairie.

  • Construction dates: Summer 2020 through spring 2021

Hwy 7 — Minnetonka

Add a second left turn from Hwy 7 to Hopkins Crossroad and replace traffic signal.

  • Construction: June through August 2021

Hwy 7 — Minnetonka to Shorewood

Repaving Hwy 7 and several other improvements.

  • Construction: July through fall 2021
  • Traffic impacts: Road and lane closures

Hwy 8 — Chisago City

Hwy 8 in Chisago City will undergo a safety improvement. The project work will improve safety by constructing a dedicated left turn lane on Hwy 8 at Deer Garden Lane.

  • Construction: Early April through August 2021

Hwy 8 — Chisago City

Construct dedicated left turn lane for eastbound traffic and add rural lighting at Hwy 11

  • Construction: April through July 2021
  • Traffic impacts: Possible lane, ramp and shoulder closures

Hwy 8 — Forest Lake to Lindstrom

Install fiber optic cable and cameras from I-35 in Forest Lake to Akerson Street in Lindstrom

  • Construction: September 2020 through July 2021
  • Traffic impacts: Possible lane and shoulder closures

Hwy 8 — Chisago County

Safety and Mobility Improvement study to identified potential needs on Hwy 8 between I-35 and County Road 80 in Chisago County.

  • Studying preliminary design

Hwy 8 — Wyoming and Chisago City

Study identified possible future improvements to the Hwy 8 Corridor between Greenway Avenue North and Karmel Avenue.

  • Study completed; no projects have been funded or are currently planned

Hwy 9 — Barnesville to I- 94

Resurfacing, turn lanes, utility replacement, sidewalk improvements, trail, bicycle & ADA accessibility upgrades.

  • Scheduled for construction in 2023

Hwy 9 — New London

Addition of safety improvements for people who walk and bike

  • Scheduled for construction in 2022

Hwys 10–19

Hwy 10 at Thurston Ave., Fairoak Ave. and Main St. — Anoka

Construct new interchange at Thurston Avenue, build underpass at Fairoak Avenue and extend West Main Street; Remove all Hwy 10 access in project area.

  • Scheduled for construction in 2022-2023

Hwy 10 — Anoka and Ramsey

Corridor study identified needs

  • Study complete; no projects have been funded or planned

Hwy 10 — Anoka Rum River Bridge replacement

Replace Hwy 10 bridge over the Rum River; Additional funding being sought to reconstruct Ferry Street (Hwy 47/Hwy 169) interchange and build auxiliary lanes from Ferry Street to Seventh Avenue.

  • Scheduled for construction in 2022

Hwy 10 — Anoka

Install temporary ramps to and from eastbound Hwy 10 and Hwy 47, and provide left turn lanes on northbound and southbound McKinley Street.

  • Construction: June through August 2021
  • Traffic impacts: Possible lane, ramp and sidewalk closures

Hwy 10 at Round Lake Boulevard — Coon Rapids

Replace signal system, realign loop from northbound Round Lake Boulevard to westbound Hwy 10, repair bridges and resurface approach roads. Add ADA-compliant sidewalks.

  • Construction: June 2021 through mid-July 2022

Hwy 10 — Elk River

Reconstruct both directions of Hwy 10 from Xenia Ave. to Lowell Ave. in Elk River, includes sidewalks, multi-use trail and signal systems.

  • Construction: April-October 2021
  • Impacts: Delays at peak travel times. Eastbound will be reduced to one lane of traffic.

Hwy 10 — Elk River project study

Upgrade to a freeway system

  • Study completed 2012; no projects have been funded or planned

Hwy 10 and Hwy 75 — Moorhead

Reconstruct Hwy10 and Hwy 75 in downtown Moorhead

  • Scheduled for construction in 2025

Hwy 10 and I-94 — Mississippi River crossings feasibility analysis between Brooklyn Park and Elk River

Update previously conducted studies, re-engage the cities and counties, and understand the need increased river crossing capacity.

  • Study dates: May 2020 through summer 2021

Hwy 10 and Hwy 75 — Moorhead 11th Street underpass

Two grade separations of Hwy 10/75 under the BNSF rail lines, paving, pedestrian accessibility improvements, utility replacements and signals.

  • Planning

Hwy 10 — Randall 

Improve access and safety on Hwy 10 in Randall, which includes two proposed Reduced Conflict Intersections (RCI) at Morrison Co. Rd. 14 and Hwy 115.

  • Scheduled for construction in 2024

Hwy 11 — Roseau County 

Improvement project.

  • Scheduled for construction in 2023

Hwys 11 and 313 — Warroad 

Improvement project.

  • Scheduled for construction in 2023

Hwy 11 and Hwy 72 — Baudette/Rainy River International Bridge replacement

Replace bridge over the Rainy River

  • Scheduled for construction in 2021

Hwy 12 — Chippewa River, Cottonwood Creek and County Ditch 3 bridge replacements

Replace the bridges at Chippewa River, Cottonwood Creek and County Ditch 3.

  • Scheduled for construction in 2023

Hwy 12 — Delano to Independence

Explore options to improve safety on Hwy 12 between Hennepin Co. Rd. 90 in Independence and Co. Line Rd. in Delano.

  • Study: February 2021 to February 2022

Hwy 12 — Orono to Independence

Improve safety and reduce crashes along Hwy 12, install a center concrete barrier, and construct a roundabout

  • Construction: Spring 2021 through 2022

Hwy 12 — Ortonville to Hwy 59

Resurface, widen shoulders, improve blowing/drifting snow traps, and replace box culverts.

  • Scheduled for construction in 2021

Hwy 12 and Hwy 40 — Willmar Wye Rail Connector & Industrial Access Project

Realign Hwy 12 and reconstruct Hwy 40 to construct a new rail line on the west side of Willmar.

  • Construction dates: May 2019 through fall 2022

Hwy 12 — Willmar

Resurfacing of Hwy 12 from Sixth Street East to 24th Street in Willmar

  • Scheduled for construction in 2021

Hwy 12 — West of Willmar

Resurfacing of Hwy 12 from Pennock to the bridge 1 mile east of Country Road 5 in Willmar.

  • Scheduled for construction in 2021

Hwy 13 — Savage to Burnsville

Study of Hwy 13 between Hwy 169 in Savage and Nicollet Avenue in Burnsville.

  • Study in progress; scheduled for construction in 2022

Hwy 13 — Spring Lake and Cedar Lake

Resurface and reconstruct road between Hwy 19 in Cedar Lake Township to Hwy 282 in Spring Lake Township and add left turn lanes.

  • Construction: Spring through fall 2022

Hwy 14 — New Ulm Highland Avenue

A roundabout is being planned for the intersection of Hwy 14 and Highland Avenue in New Ulm.

  • Not yet scheduled for construction

Hwy 14 — Riverfront Drive in Mankato

Construct two tear drop roundabouts at all exit and entrance ramps along Hwy 14 at Riverfront Drive, along with improvements at the adjacent city and county connections. This is a Blue Earth County led project.

  • Scheduled for construction in 2021

Hwy 14 — Sanborn to Springfield

Resurfacing over 8 miles of Hwy 14 from the west side of the Sanborn Four Corners intersection to the eastern city limits of Springfield.

  • Scheduled for construction in 2022

Hwy 14 — New Ulm to Nicollet four-lane expansion

Construct a four-lane divided highway from New Ulm to Nicollet (12.5-mile segment) and bypass the city of Courtland

  • Scheduled for construction in 2022-2023

Hwy 14/County Road 56 — Eagle Lake

Improve safety at the Hwy 14/County Road 56 intersection.

  • Scheduled for construction in 2022

Hwy 14 — Rochester to Byron

Evaluate 3 intersections in the Hwy 14 corridor for modifications to improve safety between Rochester and Byron.

  • Scheduled for construction in 2022

Hwy 14 — Owatonna to Dodge Center

Four-lane expansion

  • Construction resumes in spring 2021

Hwy 15 — Kimball

Reconstruct Hwy 15 from Willow Creek Park, south of the railroad tracks, to Hwy 55 in Kimball, Stearns County, includes pedestrian sidewalks and city utilities

  • Scheduled for construction in 2022

Hwy 15 — Madelia

Resurface about five miles of Hwy 15 from the north Hwy 15/Hwy 60 interchange to the Watonwan/Brown County line near Madelia.

  • Scheduled for construction in 2022

Hwy 15 and Hwy 60 — Madelia

Replace the pavement for about seven miles of Hwy 15/Hwy 60 from the south Hwy15/Hwy60 interchange to the north Hwy15/Hwy60 interchange near Madelia. Both the northbound and southbound lanes will be updated.   

  • Scheduled for construction in 2022

Hwy 19 — Cannon Falls repaving

Repaving, possible replacement of the traffic signal at the intersection of Hwy 19 and Hwy 20 along with ADA sidewalk improvements.

  • Scheduled for construction in 2022

Hwy 19 — Morton

Slope and drainage repair

  • Scheduled for construction in 2021

Hwy 19 — Morton

Drainage repair

  • Scheduled for construction in 2021

Old Hwy 19 — Sulphur Lake bridge removal

Bridge removal

  • Scheduled for construction in 2021

Hwy 19 — New Prague

Reconstruct Hwy 19 in downtown New Prague (city-led project)

  • Scheduled for construction in 2021

Hwy 19 — Winthrop

Replace the box culvert under Hwy 19, just east of Winthrop, and reconstruct a short section of pavement.

  • Scheduled for construction in 2022

Hwy 19 and College Drive — Marshall

Reconstruction of Hwy 19/College Drive from Fourth Street to Bruce Street

  • Scheduled for construction in 2025

Hwys 20–29

Hwy 21 and Hwy 282 — Jordan

Replacing two bridges, repaving, adding trail, erosion and drainage repair.

  • Construction dates: March 2020 through October 2021
  • Traffic impacts: Full closure of Hwy 21 with detours

Hwy 21 — Jordan

Construct a roundabout at Hwy 21 and Sawmill Road/Old Hwy 169 and build trails to connect to existing trails.

  • Construction: Spring through fall 2023

Hwy 21 — Shieldsville

Hwy 21 resurfacing

  • Scheduled for construction in 2021

Hwy 22 — Mapleton to Wells

Resurface Hwy 22 from approximately a quarter of a mile south of Mapleton to the north city limits of Wells, including the Hwy 22/Hwy 109/Faribault County Road 29 intersection

  • Scheduled for construction in 2023

Hwy 22 – Glencoe

  • Scheduled for construction in 2022

Hwy 22 and Hwy 109 – Wells

  • Scheduled for construction in 2026

Hwy 23 & Hwy 7 — Clara City

Complete a safety study of the intersection of Hwy 23 and Hwy 7 in Clara City.

Hwy 23 — Deer Creek Bridge

Replace Deer Creek Bridge on Hwy 23 just south of Pleasant Valley in Carlton County

  • Construction dates: May 2020 to spring 2021
  • Traffic impacts: Bypass

Hwy 23 — Foley to Milaca

Resurface and improve 12.5 miles of road from Foley to Milaca, includes: underground pipes/culverts, intersection turn lanes/access. Reconstruct one mile of road in Foley, includes: storm sewer, pedestrian sidewalk/multi-use trail and new roundabout.

  • Scheduled for construction in 2022

Hwy 23 — Fond du Lac

New road connection from Hwy 23 to Fourth Street in Fond du Lac

  • Construction dates: September 2020 to spring 2021
  • Traffic impacts: Lane closures

Hwy 23 — Gaps

Expand Hwy 23 from two-lanes to four-lanes from New London to Paynesville (South Gap) and Paynesville to Richmond (North Gap).

  • North Gap: Scheduled for construction in 2022-2023
  • South Gap: Scheduled for construction in 2023-2024

Hwy 23 — Milaca

Improve and update Hwy 23 through Milaca in Mille Lacs County, includes the road surface, drainage, multi-use access and sidewalks.

  • Project corridor study in 2021
  • Scheduled for construction in 2025

Hwy 23 — Mission Creek

Burial recovery and cemetery restoration

  • Traffic Impacts: Lane closures

Hwy 23 — Mission Creek highway realignment and bridge replacement

Replace old bridge and realign highway

  • Scheduled for construction in 2023

Hwy 23 — Gary New Duluth resurfacing

Resurface two miles of Hwy 23 from 5th Street to Hwy 39

  • Construction scheduled for 2023

Hwy 23 — New London

Construct J-turn

  • Scheduled for construction in 2022

Hwy 23 and Hwy 10 — St. Cloud interchange

Reconstruct and improve the Hwy 10 and Hwy 23 interchange area in east St. Cloud, Benton County. Includes the road surface, bridges, drainage structures; pedestrian and motorist access.

  • Scheduled for construction in 2023-2024

Hwy 25 — Buffalo to Monticello

Resurface Hwy 25, from near Catlin Street in Buffalo to near CR 106/85th Street south of Monticello.

  • Scheduled for construction in 2026

Hwy 25 — Buffalo

Reconstruct Hwy 25 from south of First Street South to north of Settlers Parkway Buffalo, Wright County, includes city utilities and pedestrian sidewalks and approaches.

  • Scheduled for construction in 2023

Hwy 25 — Watertown and Mayer

Resurface Hwy 25 south of County Road 30 in Mayer to State St in Watertown, update drainage and sidewalks to meet current American with Disability Standards (ADA).

  • Construction dates: August 2020 through June 2021

Hwy 25 — Mayer and Norwood Young America

Repave Hwy 25 between First Street in Mayer and Hwy 5 in Norwood Young America, repair drainage, improve sidewalks south of First Street in Mayer and make accessibility updates.

  • Construction: Spring through fall 2021

Hwy 27 — Aitkin and Carlton counties

Pavement resurfacing between Moose Lake and Kettle River

  • Construction dates: July - September 2021

Hwy 27 — Osakis area

Reconstruct and improve Hwy 27 between I-94 in Douglas County and Hwy 71 in Todd County. The project will replace four bridges, reconstruct and widen the road and improve access.

  • Scheduled for construction in 2022

Hwy 29 — Alexandria

Planning study to identify future highway improvements that will enhance traffic performance, mobility and driver satisfaction.

Hwy 29 — Glenwood overpass

Construct bridge over the railroad tracks just north of Glenwood, realign the intersection of Hwy 29 and Hwy 55

  • Scheduled for construction in 2021

Hwys 30-39

Hwy 30 — Ellendale

Repave Hwy 30 from 0.28 miles west of Ellendale to 1 mile east of County Road 45

  • Scheduled for construction in 2021

Hwy 30 — Chatfield

Two Hwy 30 bridges will be replaced

  • Scheduled for construction in 2023

Hwy 33 – Cloquet RCUT

Construct a Restricted Crossing U-turn (RCUT) at the intersection of Hwy 33 and Gillette Road.

  • Scheduled for construction in 2022

Hwy 34 — East of County Road 29 to west of Osage

Selective tree logging in right of way, resurface (reclaim), culvert replacements, and bridge replacement at Shell River

  • Scheduled for construction in 2023

I-35E — Columbus

Install cable median barrier from the I-35/35E/35W split to Hwy 97

  • Construction: June through July 2021
  • Traffic impacts: Possible lane and shoulder closures

I-35E — Eagan

Replace lighting between Diffley Road and Lone Oak Road

  • Construction: September 2021 through March 2022
  • Traffic impacts: Possible lane, ramp and shoulder closures

I-35E — Eagan

Update signals and accessibility at Cliff Road to meet current standards.

  • Construction: September 2021 through March 2022
  • Traffic impacts: Possible lane, ramp and shoulder closures

I-35E — Eagan standalone noise barrier

Construct new 3,500 foot long, 20 foot tall concrete noise barrier near northbound I-35E between the Hwy 77 ramps and just south of Cliff Road in Eagan

  • Construction dates: November 2020 through July 2021
  • Traffic impacts: Shoulder closures

I-35E — Little Canada to White Bear Lake

Study to develop and evaluate conceptual alternatives for extending MnPASS from Little Canada Road to County Road 96

  • Study in progress; the environmental phase for a MnPASS extension project has begun

I-35E and I-94 — Saint Paul

Concrete pavement repair/resurfacing between Western Avenue and Mounds Boulevard; and on I-35E between I-94 and University Avenue in St. Paul. Resurface ramps and frontage roads, bridge repair, fix drainage and repair various sidewalks and ADA improvements

  • Construction: Summer 2021 through fall 2022

I-35E — Saint Paul

Install landscaping between University Avenue and Wheelock Parkway

  • Construction: June through July 2021
  • Traffic impacts: Possible lane and shoulder closures

I-35W — Burnsville and Bloomington

Reconstruct I-35W bridge over the Minnesota River, replace pavement, add northbound lane

  • Construction dates: August 2018 through November 2021
  • Traffic impacts: Lane closures and detours

I-35W — Minneapolis

Crews will build six stormwater storage tanks east of northbound I-35W between 40th St. and 42nd St.

  • Construction dates: February 2020 through June 2023
  • Traffic impacts: Overnight lane closures of northbound I-35W; short-term closures of Second Avenue

I-35W — Minneapolis St. Anthony Falls Bridge

Crews will make improvements to seal cracks in concrete driving surface, concrete barrier and curbs; replace expansion joints.

  • Construction dates: July 12 through Aug. 28, 2021
  • Traffic impacts: Off-peak lane closures

I-35W — North Gateway Study

Study the freeway between Park Avenue in Minneapolis and County Road C in Roseville to identify needs for future construction projects.

  • Study in progress

I-35W — Roseville to Lino Lakes

Construct MnPASS Express Lanes (one lane in each direction) in the middle of existing I-35W between Hwy 36 in Roseville and Sunset Avenue (County Road 53) in Lino Lakes

  • Construction dates: Summer 2018 through fall 2021

I-35W and Hwy 52 — Metro-wide noise wall repairs

Repair select noise walls along I-35W and Hwy 52 in Dakota and Hennepin Counties

  • Construction dates: October 2018 through June 2021
  • Traffic impacts: Lane, ramp and shoulder closures

I-35W and I-94 — Downtown to Crosstown (Minneapolis)

Improve transit and regional access, reconstruct bridges and pavement

  • Construction dates: August 2017 through fall 2021
  • Traffic impacts: Road, lane and ramp closures and delays

I-35 — Hinckley Bridge Replacements

Replace bridges along I-35 in Pine County.

  • Construction dates: 2023 - 2025

I-35 — High-Tension Cable Median Barrier Project

Installation of High-Tension Cable Median Barrier in sections without closing the gaps between existing HTCMB.

  • Construction dates: 2021

Hwy 36 — Little Canada to Stillwater

Update culverts in various locations between I-35E in Little Canada and Stillwater Boulevard in Stillwater.

  • Construction: May through June 2021
  • Traffic impacts: Possible lane, ramp and shoulder closures

Hwy 36 — Little Canada to Stillwater

A 12-mile stretch of Hwy 36 between Edgerton Street in Ramsey County and Greeley Street in Washington County will undergo a road resurfacing and improvement project.

  • Construction: Spring through fall 2022

Hwy 36 — North Saint Paul to Oakdale study

Develop preliminary concept designs for intersection improvements at Century Avenue and Hadley Avenue

Hwy 36 — Stillwater to Minneapolis

The Hwy 36 Transit Feasibility Study will analyze existing and emerging needs for east-west transit service on Hwy 36. The study is led by Washington County.

  • Study dates: Spring 2020 through spring 2021

Hwy 36 and County Hwy 15 — Manning Avenue Interchange

Locally led project to construct interchange at Manning Avenue (Washington County Hwy 15) and Hwy 36.

  • Construction: 2021

Hwy 36 and Fairview Avenue — Roseville

Rebuild and realign the ramps at westbound Hwy 36 and Fairview Avenue in Roseville. Add ADA-compliant sidewalks.

  • Construction: Spring through summer 2023

Hwy 37/County Highway 5 — Intersection Safety Improvements

Alignment changes to side highways at both intersections. New left turn lanes along Highway 37 at both intersections.

  • Scheduled for construction in 2024

Hwy 37 — Iron Junction

Construct a roundabout at the intersection of Hwy 37 and Hwy 7 south of Iron Junction

  • Scheduled for construction in 2022

Hwy 37 — Gilbert

Resurfacing, safety and accessibility improvements on Hwy 37 from Hwy 53 to Hwy 135

  • Construction dates: July to October 2020, and May to August 2021
  • Traffic impacts: Lane closures

Hwy 38 — Bigfork

Resurface Hwy 38 through Bigfork, from Rajala Mill Road to County Road 14; curb, gutter and sidewalk work

  • Scheduled for construction in 2023

Hwys 40-59

Hwy 40 — Culvert replacements

Replacement of three culverts with box culverts near Gracelock

  • Scheduled for construction in 2021

Hwy 40 — Milan Bridge

Replace bridge (known as Milan Bridge) over Lac qui Parle Lake west of Milan.

  • Construction dates: May 2019 to 2021

Hwy 41 — Chaska to Chanhassen

Resurface Hwy 41 and make additional improvements along the highway between Pioneer Trail and Hwy 5.

  • Construction: Spring through fall 2023

Hwy 41 — River crossing

Connect Hwy 169 and new Hwy 212 near Hwy 41

  • Study complete; no projects have been funded or planned

Hwy 43 — Repaving

Repave Hwy 43 from Hwy 44 near Mabel to Hwy 16 near Rushford in Fillmore County

  • Scheduled for construction in 2023

Hwy 47 — Hwy 65 (Central Avenue) to 27th Avenue

Resurface Hwy 47 from Hwy 65 to 27th Avenue NE in Minneapolis, ADA improvements, sidewalk improvements, replace guardrail and repair drainage

  • Scheduled for construction in 2024

Hwy 47 — St. Francis

MnDOT is beginning a planning study of the Hwy 47 St. Francis corridor to examine a range of alternatives to address pedestrian, bicycle and motorist safety, as well as road capacity, and access and mobility issues.

Hwy 47/Ferry Street and BNSF Railroad Crossing — Anoka

Construct a new crossing of the BNSF Railroad north of Hwy 10

  • Study complete; preliminary design underway; no projects have been funded or planned

Hwy 47 and Hwy 65 — Columbia Heights to Coon Rapids

Conducted a roadway safety audit to analyze crash information with a focus on pedestrian crashes on Hwy 47 and Hwy 65 between the Hennepin-Anoka County line in Columbia Heights and Hwy 10 in Coon Rapids. Several improvements are being made to the project area.

  • Construction dates: Spring 2020 through 2021

Hwy 47 and Hwy 65 — Northeast Minneapolis to Blaine and Spring Lake Park

This is Phase 1 of a Planning and Environmental Linkages (PEL) Study that will produce a statement of Purpose and Need, as well as evaluation criteria. The second phase, anticipated in 2021, will produce and screen alternatives.

  • Study dates: March 2020 through December 2021

Hwy 47 and Hwy 169 — Anoka

Repair and resurface approximately 2.5 miles of Hwy 169 between the north end of the Mississippi River bridge to Clay Street in Anoka. Hwy 47 will be resurfaced from Pleasant Street to Bunker Lake Road in Anoka.

  • Construction: July through October 2021

Hwy 51 (Snelling Avenue) — Roseville to Arden Hills

Install cable median barrier between County Road C and 1-694 and extend left turn lanes at Lydia Avenue W County Road C2 and County Road C.

  • Construction: 2022 (preliminary work begins Spring 2021)

Hwy 51 (Snelling Avenue) — Roseville

Update signals and accessibility at County Road C2 and Roselawn Avenue to meet current standards.

  • Construction: April 19 through June 30, 2021
  • Traffic impacts: Side streets closed and detoured one side at a time. Traffic should follow the signed detours.

Hwy 51 (Snelling Avenue) — Hewitt Avenue to Midway Parkway

Safety and mobility needs study

  • Developing a preliminary design. Study completed in 2013.

Hwy 52 — Zumbrota to Cannon Falls

The project follows along Hwy 52, from roughly 2 miles south of Cannon Falls and ends at Zumbrota.

  • Scheduled for construction in 2021

Hwy 52 — Hampton to Cannon Falls

Crews will make improvements to Hwy 52 between Hampton Twp. and Cannon Falls in Dakota County. Work will include construction crossovers, concrete overlay, upgrade guardrail, install cable median barrier, update signals and repair joints on two bridges.

  • Construction: September 2020 through November 2021
  • Traffic impacts: Lane closures, access changes or closures and truck detour

Hwy 52 — Inver Grove Heights

Replace lighting at Upper 55th Street, 70th Street and 80th Street

  • Construction: February through August 2021
  • Traffic impacts: Possible lane, ramp and shoulder closures

Hwy 52 — Saint Paul to Rochester corridor projects

Four different road construction projects are planned for Hwy 52 between Rochester and St. Paul

  • Scheduled for construction in 2021

Hwy 52 — Saint Paul, West Saint Paul, Inver Grove Heights

Resurface Hwy 52 between I-494 in Inver Grove Heights and Hwy 156/Concord Street in West St. Paul and repair concrete on Hwy 52 between Concord Street in West St. Paul and Plato Boulevard in St. Paul.

  • Construction: Spring through fall 2021

Hwy 52 and I-35W — Metro-wide noise wall repairs

Repair select noise walls along I-35W and Hwy 52 inn Dakota and Hennepin Counties

  • Construction dates: October 2018 through June 2021
  • Traffic impacts: Lane, ramp and shoulder closures

Hwy 53 — International Falls

Reconstruct Hwy 53 from Crescent Drive to Fourth Street and on Hwy 11 from the east junction of Hwy 71 to the east junction of Hwy 53 in International Falls in St. Louis County; complete streets improvements

  • Construction dates: July to October 2020, and May to October 2021
  • Traffic impacts: Lane closures, local detours

Hwy 53 — Intersection revisions

New turn lane and median removal at Hwy 53 intersections at Miller Trunk Road and at Bodas Road / East Long Lake Road.

  • Scheduled for construction in 2021

Hwy 53 — Intersection improvements

Adding a southbound median left turn lane on Hwy 53 at P&H Road, widening the median crossover, and paving a portion of P&H Road.

  • Scheduled for construction in 2022

Hwy 53 — Pike Lake

Resurface Hwy 53 southbound from County Road 13 to County Road 8

  • Scheduled for construction in 2021

Hwy 55 — Brooten, Belgrade

Reconstruct Hwy 55 through the cities of Brooten and Belgrade, Stearns County, includes road surface, storm sewer and pedestrian sidewalks.

  • Construction: April-July 2021
  • Impacts: Detour in Brooten

Hwy 55 — Golden Valley

Resurface Hwy 55 between General Mills Boulevard and Hwy 100 in Golden Valley; improve safety and accessibility; build the start of a trail between Winnetka Avenue and Glenwood Avenue

  • Construction: July through September 2021

Hwy 55 — Hastings to Inver Grove Heights

The Hwy 55 Safety Audit is part of a multi-agency effort to improve safety along Hwy 55 between Hastings and Inver Grove Heights in Dakota County

  • Road Safety Audit: October 2020 through summer 2021

Hwy 55 — Wendell to MN/ND Border

Resurface, replace box culverts

  • Scheduled for construction in 2022

Hwy 55 — Minneapolis to Inver Grove Heights

Update and repair pavement, add trail and redeck or repair bridges in the project area.

  • Construction: Spring through fall 2022

Hwy 55 — Minneapolis

Crews will resurface Hwy 55/Hiawatha Ave. between I-35W and Hwy 62, repair bridges from Hwy 55 to 7th St., 8th St. to Hwy 55 and SB Hwy 55 over Franklin Ave.

  • Construction: April through November 2022

Hwy 55 (Hiawatha) — Minneapolis storm sewer project

Repaired storm sewer pipe that takes water from Hwy 55 in Minneapolis to the Mississippi River.

  • Status: Complete

Hwy 55 — Plymouth to Rockford

Lane expansion study

  • Status: Complete

Hwy 55 — Rosemount

Construct dedicated turn lanes at the intersection of Hwy 55 and Doyle Path in Rosemount

  • Construction: Spring through fall 2022

Hwy 55 and Hwy 59 — Elbow Lake to Barrett

Resurface, widen shoulders, replace culverts, turn lanes and access improvements, accessibility improvements in Barrett.

  • Scheduled for construction in 2022

Hwy 56 — LeRoy

Reconstruction of roadway, base, pedestrian facilities, drainage and city utilities.

  • Scheduled for construction in 2023

Hwy 57 — Mantorville

Full trunk highway reconstruction.

  • Scheduled for construction in 2023

Hwy 57 — Kasson

Reconstruction of Hwy 57 in Kasson

  • Scheduled for construction in 2022

Hwy 58 resurfacing — Red Wing

Resurface Hwy 58 in Red Wing

  • Scheduled for construction in 2021

Hwy 59 and Hwy 108 — Pelican Rapids

Downtown Complete Streets reconstruction, resurface, utility replacement, bicycle and pedestrian accessibility improvements.

  • Scheduled for construction in 2024

Hwy 59 – South of Marshall

Concrete repair

  • Scheduled for construction on July 19, 2021

Hwy 59 — Winger

Resurface Hwy 59 from Winger to Erskine and improve pedestrian crossings in Winger

  • Scheduled for construction in 2021

Hwys 60-79

Hwy 60 — Lake Crystal

MnDOT is conducting a transportation study that reflects the current and future transportation needs on Hwy 60 through Lake Crystal. With input from the city of Lake Crystal, local residents and businesses, and other project stakeholders, MnDOT will evaluate the corridor, develop design alternatives, and arrive at a preliminary layout for a future Hwy 60 roadway project.

  • Scheduled for construction in 2024

Hwy 60 — Madison Lake, Elysian, Waterville lake connection

Resurface approximately 16 miles of Hwy 60, including a reconstruction through Madison Lake

  • Scheduled for construction in 2021

Hwy 60 — Madelia to Lake Crystal

Resurfacing the eastbound lanes of Hwy 60 from the northern junction of Hwy 15 near Madelia to 0.4 miles west of the western junction of Blue Earth County Road 20 near Lake Crystal

  • Scheduled for construction in 2021

Hwy 60 — Windom Corridor Study

Hwy 60 through the City of Windom is being studied to create a long-term vision for the corridor that incorporates community values, economic development, safety, and bicyclists and pedestrians.

Hwy 60 — Worthington roundabouts

Reconstruct the inside curb of three roundabouts in Worthington on Hwy 60 at the intersections of Oxford St., I-90, and Nobles County Road 35.

  • Scheduled for construction 2021

Hwy 60 — Bridge improvements

The bridge will be painted and expansion joints will be replaced.

  • Construction dates: May - September 2021

Hwy 60 — Zumbro Falls

Hwy 60 improvements

  • Scheduled for construction in 2022

Hwy 61 — Grand Marais

Reconstruct, resurface Hwy 61 in Grand Marais, accessibility, drainage improvements from just north of Cutface Creek to just north of Hwy 14 in Grand Marais in Cook County

  • Construction dates: December 2019 to 2021
  • Traffic impacts: Lane closures, detours

Hwy 61 — Grand Portage

Resurfacing and bridge project from Reservation Bay Road to the Canadian Border in Cook County

  • Construction dates: July 2020 to fall 2021
  • Traffic impacts: Lane closures, local detour

Hwy 61 — Intersection improvements

Safety improvements at five intersections along Hwy 61 up the North Shore

  • Scheduled for construction in 2024
  • Expect traffic impacts

Hwy 61 — Maplewood

Replace or repair culverts from County Road B and Arcade Street

  • Construction: April through June 2021
  • Traffic impacts: Possible lane and shoulder closures

Hwy 61/Arcade Street and Hwy 5/East 7th Street — St. Paul

Safety and accessibility improvements are needed on Hwy 5 and Hwy 61 from I-94 to Roselawn Ave. in St. Paul. The project will include repaving, sidewalk repairs, and accessibility for all.

  • Construction: April 2024 through October 2025

Hwy 61 Wabasha to Minnesota City

Resurfacing southbound lanes, constructing a reduced conflict intersection at Hwy 42 and replacing approach panels on six bridges

  • Scheduled for construction in 2022

Hwy 61 Resurfacing - Lake City to Red Wing

Resurfacing road, adding passing zone and changing access

  • Scheduled for construction in 2023

Hwy 61 — Withers Harbor Bridge

  • Scheduled for construction in 2023

Hwy 61/Hwy 316 roundabout

Constructing a roundabout at intersection, improving bicycle facilities, connections near Prairie Island Indian Community

  • Scheduled for construction in 2022

Hwy 61/County Road 18 intersection safety

Constructing a reduced conflict intersection north of Red Wing

  • Scheduled for construction in 2022

Hwy 61 — Lake County

Install new efficient tunnel lighting systems

  •  Scheduled for construction in 2024

Hwy 61 — Silver Creek and Stewart River bridges

Replace Silver Creek Bridge, rehabilitate existing Stewart River Bridge and add new bridge inland.

  • Scheduled for construction in 2021-2023

Hwy 61 — London Road project

Repave London Road from 26th Avenue East to 60th Avenue East; intersection improvements

  • Construction: 2025

Hwy 61 — Two Harbors

Resurface almost seven miles of pavement south of Two Harbors, new intersection

  • Scheduled for construction in 2021

Hwy 61 — Forest Lake to Wyoming

Resurface Hwy 61 between Hwy 8 in Forest Lake and I-35 in Wyoming. The work will include pavement work, drainage updates, right turn lanes, safety and pedestrian improvements.

  • Construction: Spring through fall 2021

Hwy 63 and I-90 — Stewartville

Interchange improvements including replacement of the Hwy 63 bridges, and safety and vehicle traffic capacity improvements to the ramp geometrics and traffic operations within the corridor.

  • Construction resumes in spring 2021

Hwy 64 — Akeley

Install larger box culvert at Eleveinth Crow Wing Lake on Hwy 64 north of Akeley.

  • Construction: August-October 2021

Hwy 65 — Ham Lake, Blaine and Spring Lake Park

Corridor access planning study between Bunker Lake Boulevard and County Road 10

  • Study: 2018 through summer 2021

Hwy 65 — Littlefork

Resurface Hwy 65 from County Road 8 to Hwy 71

  • Scheduled for construction in 2021

Hwy 65 and Hwy 2 — Swan River roundabout

Construct roundabout

  • Scheduled for construction in 2023

Hwy 65 and Klondike Drive Northeast — Cedar and East Bethel

Build a non-signalized reduced conflict intersection

  • Construction dates: April through August 2021

Hwy 65 — Ham Lake to East Bethel

Several crashes occurred at this RCI intersection in spring and summer 2020, and some are still under review by the State Patrol. In the meantime, MnDOT engineers are reviewing all available historical crash data to identify patterns, and will be taking short term steps to enhance safety of the intersection. MnDOT continues to work closely with the City of East Bethel and Anoka County to understand the community’s needs and concerns.

  • Status: Project completed in August 2019. Re-evaluation opened in August 2020.

Hwy 65/Third Avenue Bridge — Minneapolis

The Hwy 65/Third Avenue bridge will get major renovation improvements including a new bridge deck.

  • Construction dates: May 2020 through August 2022
  • Traffic impacts: Lane and bridge closures

Hwy 65 — Albert Lea Main Street

Repaving road, flood mitigation and ADA work

  • Scheduled for construction in 2022

Hwy 67 — Clarkfield

Reconstruction of Hwy 67 from Hwy 59 to Sixth Street

  • Scheduled for construction in 2023

Hwy 67 — Granite Falls to Echo

The road will remain closed through 2020 due to slide area

  • Not yet scheduled for construction

Hwy 68 — Minneota to Marshall

Shoulder widening and culvert replacement

  • Scheduled for construction in 2022

Hwy 71 — Browerville

Replace Hwy 71 bridges over the Drayer Creek and Harris Creek in Browerville, Todd County.

  • Construction: September-October 2021
  • Impacts: Detour

Hwy 71 — Olivia

Resurfacing of Hwy 71 from Viking Drive to the intersection of Hwy 212 in Olivia

  • Scheduled for construction in 2022

Hwy 71 — Bemidji

Corridor safety evaluation

  • Community Review Panel study

Hwy 71 — County Road 90 J-turn

Construction of J-turn

  • Scheduled for construction in 2021

Hwy 71 — Sanborn

Bridge replacement

  • Scheduled for construction in 2021

Hwy 71 — Sauk Centre

Reconstruct and improve safety on Hwy 71 in Sauk Centre, Stearns County.

  • Scheduled for construction in 2025

Hwy 73 — Railroad bridge

Rehabilitate the Hwy 73 bridge over the BNSF Railroad on Hwy 73, 2.5 miles south of Hwy 169 in Saint Louis County

  • Construction dates: Work resumes in spring 2021
  • Traffic impacts: Detour

Hwy 74 — Whitewater State Park

Rehabilitation of four historic bridges on Hwy 74.

  • Construction dates: February to October 2021

Hwy 75 — Madison to Bellingham

Resurface Hwy 75 from Hwy 212 to Hwy 7.

  • Construction dates: July 2020 to spring 2021

Hwy 75 — Hallock

Resurface Hwy 75 and make pedestrian accommodations.

  • Scheduled for construction in 2022-2023

Hwy 75 — Rabbit River bridge replacement

Replace the bridge at Rabbit River, south of Doran

  • Scheduled for construction in 2023

Hwy 75 and Hwy 40 — Madison

Resurfacing and ADA improvements on Hwy 75 and Hwy 40 in Madison

  • Construction scheduled for 2023

Hwy 77/Cedar Avenue — Apple Valley to Richfield

Evaluate the Hwy 77/Cedar Avenue corridor from 138th St. in Apple Valley to I-494 in Richfield.

  • Study dates: December 2020 through December 2021

Hwy 77 — Apple Valley

Replace lighting at McAndrews Road and 127th Street

  • Construction: February through August 2022
  • Traffic impacts: Possible lane, ramp and shoulder closures

Hwy 77 — Bloomington

Make repairs and paint bridge over the Minnesota River.

  • Construction dates: April 26 through Oct. 9, 2021
  • Traffic impacts: Lane shifts and off-peak lane closures

Hwy 77 — Bloomington to Minneapolis

Hwy 77 will be resurfaced, improve drainage, improve accessibility and center media barrier added.

  • Construction: April through November 2022
  • Traffic impacts: Road, lane and ramp closures

Hwy 77 — Richfield

Build underpass beneath Hwy 77 connecting 77th Street in Richfield to 66th Street; build ramps, build trail, sidewalk.

  • Construction: Spring 2021 through fall 2022

Hwys 80-99

Hwy 84 — Pine River

Replace the Hwy 84 bridge over the Norway Brook in Pine River, Cass County. The new structure will have pedestrian sidewalks on both sides and shoulders for bicyclists.

  • Construction: May-September 2021
  • Impacts: Detour

Hwy 86 — Lakefield

Upgrade wastewater and water systems throughout the city, including those located under Hwy 86.

  • Scheduled for construction in 2022

Hwy 87 — Frazee to county line

Reconstruct and widen shoulders on Hwy 87; replace two bridges near Frazee

  • Scheduled for construction in 2021

Hwy 87 — Frazee Complete Streets

Downtown Complete Streets reconstruction, resurface, utility replacement, ADA improvements and multi-use trail.

  • Scheduled for construction in 2022

I-90 — Austin bridge replacements

Replacing two bridges over Interstate 90

  • Scheduled for construction in 2021

I-90 — Sherburn to Fairmont

Resurface fifteen miles of eastbound I-90 between Sherburn and Fairmont.

  • Scheduled for construction in 2022

I-90 and Hwy 63 — Stewartville

Interchange improvements including replacement of the Hwy 63 bridges, and safety and vehicle traffic capacity improvements to the ramp geometrics and traffic operations within the corridor.

  • Status: Completed for 2020; construction resumes in spring 2021

Hwy 91 — Adrian bridge replacement

Replace the Hwy 91 bridge over I-90 at Adrian.

  • Scheduled for construction 2021

Hwy 93 — Henderson

Raise Hwy 93 from the intersection of Hwy 169 to the southern limits of Henderson, putting it above the 100-year flood elevation.

  • Scheduled for construction in 2022 and 2023.

I-94 — Dale Street Bridge in Saint Paul

Reconstruct Dale Street (Ramsey County Road 53) between Iglehart Avenue and University Avenue, and the Dale Street bridge over I-94.

  • Construction dates: March 2020 through July 2021
  • Traffic impacts: Lane and ramp closures with detours

I-94 — East Metro Interchange study (I-694/I-494/I-94)

This study focuses on finding the long-term vision for the I-94/I-494/I-694 interchange while ensuring that other projects in the interchange area are compatible with that vision.

  • Study dates: 2019 through summer 2021

I-94 — Maple Grove to Clearwater

Resurface road, replace/construct bridges, add lanes and improve access

  • Construction dates: August 2019 through fall 2021
  • Traffic impacts: All lanes will remain open during construction with lane restrictions on nights or weekends. Special consideration is being made to keep Friday evening weekend rush hour lanes open.

I-94 and I-394 — Minneapolis

Repair bridge joints and resurface ramps connecting I-94 and I-394 to downtown Minneapolis.

  • Construction: April through July 2021
  • Traffic impacts: Ramp closures

I-94 and Hwy 10 — Mississippi River crossings feasibility analysis between Brooklyn Park and Elk River

Update previously conducted studies, re-engage the cities and counties, and understand the need increased river crossing capacity.

  • Study dates: May 2020 through summer 2021

I-94 — Minneapolis to Saint Paul

Study to gather public input about this corridor

  • Study in progress; some project funding identified for 2021 and 2022

I-94 — Saint Paul

ADA pedestrian ramps and sidewalk improvements along St. Anthony Avenue and Concordia Avenue Periodic enhancements will occur along the project area.

  • Construction dates: Spring through fall 2021
  • Pedestrian impacts: Sidewalk closures

I-94 — Saint Paul

Construct or repair a noise wall and install landscaping between Prior Avenue and Fairview Avenue

  • Construction: August through October 2021
  • Traffic impacts: Possible lane, ramp and shoulder closures

I-94 — Saint Paul

Update pedestrian ramps at various locations to meet current accessibility standards from Cretin Avenue/Vandalia Street to Western Avenue and Fairview Avenue

  • Construction: April through October 2021
  • Traffic impacts: Possible lane, ramp and shoulder closures

I-94 — Saint Paul

Install landscaping from Pascal Street to Mackubin Street

  • Construction: August 2021 through June 2022
  • Traffic impacts: Possible lane, ramp and shoulder closures

I-94 — Saint Paul

Improve accessibility, and signals along the frontage road from Cretin Avenue to Griggs Street

  • Construction: June through August 2021
  • Traffic impacts: Possible lane and shoulder closures

I-94 — St. Paul standalone noise barrier

Construct a new wood plank and concrete post noise barrier on eastbound I-94 between Fairview Avenue and Prior Avenue in St. Paul.

  • Construction: May through August 2021

I-94 and I-35E — Saint Paul

Concrete pavement repair/resurfacing between Western Avenue and Mounds Boulevard; and on I-35E between I-94 and University Avenue in St. Paul. Resurface ramps and frontage roads, bridge repair, fix drainage and repair various sidewalks and ADA improvements

  • Construction dates: Summer 2021 through fall 2022

I-94 and I-35W — Downtown to Crosstown (Minneapolis)

Improve transit and regional access, reconstruct bridges and pavement

  • Construction dates: August 2017 through fall 2021
  • Traffic impacts: Lane and ramp closures

I-94 and I-694 — Brooklyn Center

Resurface, concrete pavement repairs, drainage and ADA improvements on I-94/I-694 between Brooklyn Boulevard and just east of Dupont Avenue in Brooklyn Center.

  • Construction dates: April 12 through early June 2021
  • Traffic impacts: Ramp closures at Brooklyn Boulevard with posted detours

I-94 — Central Minnesota

Future road construction plans for I-94 in Wright and Stearns counties, in central Minnesota. Includes the communities of St. Michael, Albertville, Monticello, Clearwater, St. Cloud, Collegeville and Sauk Centre.

  • Current, future plans and studies

I-94 — Maple Grove to Clearwater

Resurface road, replace/construct bridges, add lanes and improve access

  • Construction: August 2019 to fall 2021
  • Impacts: All lanes will remain open during construction with lane restrictions on nights or weekends. Special consideration is being made to keep Friday evening weekend rush hour lanes open.

I-94 to Hwy 10 — New freeway connection project study

Proposed freeway connection and river crossing between Hwy 10 and I-94 using Hwy 24 in Wright and Sherburne counties

  • Study completed 2007; project is unprogrammed; no funds are available

I-94 and Hwy 27 — Eastbound ramps

Hwy 27/Eastbound Interstate 94 intersection improvements.

  • Scheduled for construction in 2023

Hwy 95 — Woodbury

Resurface the road, improve drainage, and update accessibility to meet current standards from Hudson Boulevard to Valley Creek Road and from Valley Creek Road to the junction of 40th Street/Bailey Road

  • Construction: July through September 2021
  • Traffic impacts: Possible lane and shoulder closures

Hwy 95 — Scandia

Repair drainage south of Cedar Cliff Road

  • Construction: July through September 2021
  • Traffic impacts: Possible lane and shoulder closures

Hwy 95 — West of Cambridge

Reconstruct 12 miles of Hwy 95 road surface and replace 17 pipes from Isanti Co. Rd. 15 near Wyanett to west limits of Cambridge, includes new roundabout at Hwy 65. Project requires a detour.

  • Construction: July to October 2021
  • Impacts: Detour, delays

Hwy 95 and Manning Avenue — Washington County safety improvements

Widening shoulders, resurface road, add turn lanes and update drainage.

  • Construction dates: July 2017 through late fall 2021
  • Traffic impacts: Closures, detours

Hwy 97 — Forest Lake

Safety improvements, construct dedicated turn lanes on Hwy 97, and construct a multi-use trail.

  • Construction: 2024 through 2025
  • Traffic impacts: Lane closures or possible full closures

Hwy 99 — Nicollet to St. Peter

Resurfacing 11 miles of Hwy 99 from Birch Street in Nicollet to the south intersection with Hwy 169 in St. Peter.

  • Scheduled for construction in 2021

Hwys 100-199

Hwy 100 — Brooklyn Center

Update concrete and pavement on Hwy 100, and repair bridges and drainage on ramps between I-694 and Hwy 252.

  • Construction: May 17 through August 2021
  • Traffic impacts: Possible lane, ramp and shoulder closures

Hwy 100 — Edina to Robbinsdale

Repair or relocate fences.

  • Construction: February through August 2021
  • Traffic impacts: Possible lane and shoulder closures

Hwy 100 — St. Louis Park

Remove diseased, damaged, volunteer and invasive trees and shrubs in area bounded by Hwy 100, 28th Street, Toledo Avenue and 29th Street

  • Schedule: Late March (Approximately one-week)

Hwy 104 — Glenwood to Hwy 9

Resurface Hwy 104 from Glenwood to junction of Hwy 9 near Sunburg.

  • Scheduled for construction in 2025

Hwy 108 — Henning

Reconstruct Hwy 108 in Henning, utility replacements, bicycle and pedestrian accessibility upgrades.

  • Scheduled for construction in 2024

Hwy 120 — Maplewood to Oakdale

This study will identify issues, priorities and environmental concerns on Hwy 120 between I-94 in Maplewood and I-694 in Oakdale.

  • Study dates: Summer 2020 through summer 2022

Hwy 123 — Sandstone

Resurfacing Hwy 123 from Hwy 23 to County Hwy 30, and realign Hwy 123 and Hwy 23 intersection

  • Scheduled for construction in 2021-2022

Hwy 135 — Biwabik

Reconstruct Hwy 135 in Biwabik; complete streets improvements

  • Construction dates: July 2020 through October 2021
  • Traffic impacts: Lane closures, possible detour

Hwy 149 High Bridge (Smith Avenue and Dodd Road) — St. Paul to Mendota Heights

Landscaping

  • Construction dates: Spring 2020 through June 2021
  • Traffic impacts: Possible shoulder closures

Hwy 156/Concord Street — Saint Paul

Repair and resurface nearly one mile of Hwy 156 between Hwy 52 and Annapolis Street in St. Paul. Work includes new traffic signals at Concord St., ADA improvements and retaining wall repair.

  • Construction: August 2021 through July 2022

Hwy 169 — Belle Plaine

Belle Plaine Area Plan

  • Study completed 2003; no projects have been funded or planned

Hwy 169 — Jordan

Repair or replace drainage structures, or earth retention systems at 173rd Street.

  • Construction: May through June 2021
  • Traffic impacts: Possible lane and shoulder closures

Hwy 169 — Mobility study

Hwy 169 mobility and transit improvements between Hwy 55 in Golden Valley and Hwy 41 in Shakopee, and between Mankato and the Twin Cities Metro area.

  • Study completed

Hwy 169 — Shakopee to Blakely

Identify options for access changes, improvements to safety and mobility

  • Study underway

Hwy 169 and Hwy 41 — River Crossing

Connect Hwy 169 and new Hwy 212 near Hwy 41

  • Study completed in 2015; no projects have been funded or planned

Hwy 169 and Hwy 47 — Anoka

Repair and resurface approximately 2.5 miles of Hwy 169 between the north end of the Mississippi River bridge to Clay Street in Anoka. Hwy 47 will be resurfaced from Pleasant Street to Bunker Lake Road in Anoka.

  • Construction: July through October 2021

Hwy 169 — Blue Earth to Elmore

Resurface nine miles of Hwy 169 from Faribault County Road 52 (southern limits of Blue Earth) to the northern limits of Elmore

  • Scheduled for construction in 2022

Hwy 169 — Elk River freeway

Convert three miles of Hwy 169 to a new freeway system through Elk River from Hwy 101/Hwy 10 to 197th Ave, Sherburne County. Corridors of Commerce project.

  • Preliminary design in progress; scheduled for construction in 2022-2024

Hwy 169 — Elk River to Zimmerman project study

Assessed range of reasonable alternatives to corridor improvements.

  • Study completed 2013; no projects have been funded or planned

Hwy 169 — Mankato/North Mankato Corridor Study

A nine-mile corridor of Highway 169 through Mankato/North Mankato is being studied for safety, intersection modifications, traffic flow, pedestrian and bicyclist connections, and alternative roadway designs to develop a long-term vision for future improvements.

Hwy 169 — Marble to Pengilly

Safety improvements

  • Scheduled for construction in 2021

Hwy 169 — South of Zimmerman

Sherburne County will improve access and install two reduced conflict intersections on Hwy 169 at Sherburne Co. Rd. 19 and Co. Rd. 25.

  • Construction: July-October 2021
  • Impacts: Lane closures, access detours

Hwy 169 — Saint Louis County

Resurfacing Hwy 169 from Hwy 53 to County Road 26 in Saint Louis County, incudes northbound Hwy 169 ramp

  • Status: Complete

Hwy 169 — Saint Peter Broadway to Union

The pavement on Hwy 169 from Broadway Avenue to Union Street (approximately half of a mile) is deteriorating more quickly than the subsequent sections of Hwy 169. MnDOT completed a maintenance project in 2019 that extended the life of the pavement in this segment, gaining about 5-7 years before a future project will address a more significant pavement fix and other accommodations.

Hwy 169 and Hwy 210 — Aitkin to north of Hassman

Reconstruct 11 miles of road surface, widen shoulders and upgrade drainage infrastructure.

  • Plans in progress; scheduled for construction in 2022

Hwy 169, Hwy 22, Hwy 99 — St. Peter intersections

A project is planned in 2023 to improve the pavement condition, intersection safety, and mobility along the Hwy 169 corridor on the south side of St. Peter, including the intersections with Hwy 22 and Hwy 99

  • Scheduled for construction in 2023

Hwy 172 — Baudette

Replace 2 culverts and resurface highway

  • Construction dates: 2020-2021

Hwy 194 — RCUT and roundabout

  • Scheduled for construction in 2022

Hwy 197 — Bemidji

Corridor safety and access management

  • Community Review Panel study (looking for preferred alternative in spring 2021)

Hwys 200-299

Hwy 200 — Mahnomen to Roy Lake

Resurface, widen shoulders, improve pedestrian accessibility, and drainage repairs.

  • Scheduled for construction in 2022

Hwy 200 — Roy Lake to Zerkel

Resurface Hwy 200 from Mahnomen/Clearwater County line to Hwy 92.

  • Scheduled for construction in 2021

Hwy 200 — Walker

  • Scheduled for construction in 2021

Hwy 210 — Box Culvert Replacements

Replace four box culverts along Hwy 210  in Carlton County.

  •  Scheduled for construction in 2022

Hwy 210 — Culvert Replacement

Replace deficient box culvert over unnamed stream in Aitkin County.

  •  Scheduled for construction in 2021

Hwy 210 — Brainerd project study

Study of the Hwy 210/Washington Street corridor between Baxter Dr. and Pine Shores Rd in Brainerd, Crow Wing County. Results of the study will  inform plans for the future reconstruction project.

  •  Study 2019-2021; plan 2022-2024; scheduled for construction in 2025 or beyond

Hwy 210 — Crosby to Ironton

Reconstruct or resurface road and improve pedestrian access from the Cuyuna Regional Medical Center to west of Sixth Ave. in Ironton.

  • Construction: April-September 2021
  • Impacts: Detour, lane closures, truck route

Hwy 210 — Baxter

Improve five miles of Hwy 210 through Baxter between Baxter Dr. and Timberwood Dr., Crow Wing County.

  • Plans in progress; projects scheduled for construction 2022 and 2024

Hwy 210 — Deerwood to Aitkin

Improve 12 miles of concrete road surface and repair/replace pipes on Hwy 210  from Hwy 6 in Deerwood to Ninth Avenue West in Aitkin.

  • Construction: July-October 2021
  • Impacts: Weekday detour, lane closures on westbound

Hwy 210 and Hwy 73 — Cromwell

Drainage and safety improvements

  •  Scheduled for construction in 2021-2022

Hwy 212 — Carver to Norwood Young America

Transportation Planning Study

  • Study underway

Hwy 212 — Glencoe

Construct two J-turns on Hwy 212 in the Glencoe area. 

  • Scheduled for construction in 2022

Hwy 212 — Granite Falls

Historic overlook rehabilitation

  • Scheduled for construction in 2021

Hwy 212 — Norwood Young America

Landscaping

  • Landscaping dates: Spring 2021

Hwy 218 — Blooming Prairie

The Hwy 218 corridor through Blooming Prairie (Fourth Street to Hwy 30) is due for reconstruction in 2024.

  • Scheduled for construction in 2024

Hwy 247 — Plainview

Replacement and repair of four culverts

  • Scheduled for construction in 2021

Hwy 250 — South Branch

Resurfacing and culvert replacement

  • Scheduled for construction in 2021

Hwy 252 and I-94 — Environmental Review

MnDOT, along with FHWA, Hennepin County and the cities of Brooklyn Center, Brooklyn Park and Minneapolis, are preparing an Environmental Impact Statement (EIS) for the Hwy 252/I-94 project. The project partners will address the purpose and need for the project in the EIS document and develop transportation alternatives.

  • Environmental review underway

Hwy 263 — I-90 to Ceylon

Resurface Hwy 263 in preparation for a turnback of the highway to Martin County

  • Scheduled for construction in 2022

Hwy 271 — Hendricks

Resurfacing of Hwy 271 from the junction of Hwy 19 to the MN/SD border

  • Scheduled for construction in summer 2021

Hwy 280 and Broadway Street — Lauderdale

Close the median crossing, remove the northbound left turn lane and traffic signal system and extend the median barrier. This will eliminate traffic movements from northbound Hwy 280 to westbound Broadway Street.

  • Construction: Spring through summer 2024

Hwy 282 and Hwy 21 — Jordan

Replacing two bridges, repaving, adding trail, erosion and drainage repair.

  • Construction dates: March 2020 through October 2021
  • Traffic impacts: Possible lane and road closures

Hwys 300-694

Hwy 316 — Hastings

Reconstruct Hwy 316 between the north junction of Hwy 61 and Michael Avenue

  • Construction: Spring through fall 2021

Business Hwy 371 — Barrows to Brainerd

Reconstruct the road, upgrade the signal and improve pedestrian access  from Greenwood Street to Joseph Street in Brainerd; Resurface road from 70th Avenue in Barrows to Greenwood Street Work requires detours.

  • Scheduled for construction in 2022

Hwy 371 — Brainerd Lakes area

Improve access and safety at three intersections along a busy stretch of Hwy 371 with use of reduced conflict intersections between Gull Lake Dam Road (Crow Wing County Road 125) and Green Gables Road (Crow Wing County Road 126), includes access to Birchdale Rd (Brainerd International Raceway).

  • Plans in progress; scheduled for construction in 2022

Hwy 371 — Hackensack

Reconstruct Hwy 371 from County Road 40 to County Road 5 in Hackensack.

  • Community outreach, information gathering and project development

Hwy 371 — Nisswa to Pine River project study

Project study to expand to four lanes and improve access along the corridor. Since the study was completed, Hwy 371 has been expanded to four lanes between Nisswa and Jenkins. Pine River to Jenkins remains unprogrammed for expansion.

  • Status: Study completed

I-394 and I-94 — Minneapolis

Repair bridge joints and resurface ramps connecting I-94 and I-394 to downtown Minneapolis.

  • Construction: April through July 2021
  • Traffic impacts: Ramp closures

I-494 — Airport to Hwy 169

Study to evaluate design alternatives and determine a scope of work for the future reconstruction of the I-494 corridor from the MSP Intl’ Airport to Hwy 169. The proposed project is envisioned to improve the capacity of the interstate and dramatically improve the reliability of the average rush hour trip.

  • Study underway; scheduled for construction in 2022-2024

I-494 — Richfield

Build tunnel under I-494 at Knox Avenue for Orange line bus rapid transit.

  • Construction dates: August 2019 to October 2021
  • Traffic impacts: Closure of ramps from southbound I-35W to westbound I-494 and from eastbound I-494 to southbound I-35W

I-494 and Hwy 62 — Congestion relief study

Mobility and transit improvements

  • Status: Study completed

I-494 and I-35W — Study

Interchange Improvements

  • Study in progress; no projects have been funded or planned

I-494 — East Metro Interchange study (I-694/I-494/I-94)

This study focuses on finding the long-term vision for the I-94/I-494/I-694 interchange while ensuring that other projects in the interchange area are compatible with that vision.

  • Study dates: 2019 through summer 2021

I-494 and I-694 — Woodbury to Oakdale

Install landscaping on I-694 from 10th Street to I-694/494/94 junction and on I-494 from I-694/494/94 junction to Tamarack Road

  • Construction: August 2021 through November 2023
  • Traffic impacts: Possible lane and shoulder closures

I-535 – Blatnik Bridge

Replacement of the Blatnik Bridge between Duluth, Minn., and Superior, Wis.

  • Scheduled for construction in 2027

Hwy 610 — Coon Rapids

Replace the signal and update accessibility to meet current standards at Coon Rapids Boulevard

  • Construction: July through September 2021
  • Traffic impacts: Possible lane, ramp and shoulder closures

I-694 — Non-motorized crossing study

Determine safety and mobility needs for bicyclists and pedestrians for the area

  • Study completed; no projects have been funded or planned

I-694 — East Metro Interchange study (I-694/I-494/I-94)

This study focuses on finding the long-term vision for the I-94/I-494/I-694 interchange while ensuring that other projects in the interchange area are compatible with that vision.

  • Study dates: 2019 through summer 2021

I-694 — New Brighton

Repair noise wall along the south side of I-694 between Silver Lake Road and Long Lake Road

  • Construction: March 15 through mid-June 2021
  • Traffic impacts: Possible shoulder closures

I-694 — Vadnais Heights/White Bear Lake to Oakdale

Install lighting from Hwy 61 in Vadnais Heights/White Bear Lake to County Road 10 in Oakdale

  • Construction: August 2020 through May 2021
  • Traffic impacts: Possible lane, ramp and shoulder closures

I-694 and I-494 — Woodbury to Oakdale

Install landscaping on I-694 from 10th Street to I-694/494/94 junction and on I-494 from I-694/494/94 junction to Tamarack Road

  • Construction: August 2021 through November 2023
  • Traffic impacts: Possible lane and shoulder closures

ADA improvement project

Improvements to sidewalks, ramps and driveways to meet current ADA standards on multiple highways.

  • Scheduled for construction in 2021

Bridges – Highways 11, 89, 9 and 32 bridges

Repair 4 bridges: Hwy 9 bridge over Marsh River south of Ada, Hwy 11 bridge over Silver Creek east of Baudette, Hwy 32 bridge south of Greenbush, Hwy 89 bridge over Roseau River northwest of Roseau.

  • Scheduled for construction in 2021

Metro Wide — St. Louis Park, Arden Hills and Shoreview

Apply a thin surface treatment on Hwy 7 between Texas Avenue and Hwy 100 in St. Louis Park, and on Hwy 10, 51 and I-694 interchange area in Arden Hills and Shoreview.

  • Construction: September 2020 through June 2021
  • Traffic impacts: Possible lane and shoulder closures

Metro Wide — Saint Paul, White Bear Lake, South Saint Paul, Eden Prairie and Cologne

Apply a thin surface treatment on Hwy 5 from Excel Energy Center to St. Clair Ave. in St. Paul. On Hwy 61 from Keller Lake to County Road 65 in White Bear Lake. On Hwy 3/South Robert Street from Mendota Road to Annapolis Street. On Hwy 212 from I-494 to Hwy 62 and on Hwy 284 from Hwy 212 to Hwy 5 in Cologne.

  • Construction: June 2021 through June 2024
  • Traffic impacts: Possible lane and shoulder closures

Metro Wide — Mendota, Minneapolis, Maplewood and Woodbury

Repair concrete road surface on Hwy 62 from the west end of the Mendota Bridge to Hwy 5. On Hwy 55 from Hiawatha to I-94. On I-694 from Hwy 61 to Hwy 36 and on I-494 from Tamarack Road to Lake Road.

  • Construction: May 2021 through June 2022
  • Traffic impacts: Possible lane, shoulder and ramp closures with possible detours

Stone Arch Bridge — Minneapolis

Preservation of the historic bridge including repointing mortar and repairing/replacing some of the stone

  • Scheduled for construction in 2022-2024

Thompson Hill Visitor Center — St. Louis County

Resurface entire rest area roadway and parking lots and replace all sidewalks and trails

  • Scheduled for construction: June-October 2021

Urban freight perspectives study — Metro district

The Urban Freight Perspectives study is focused on enhancing freight mobility in MnDOT’s Metro District by improving communication with freight stakeholders and integrating freight considerations into the district’s project development process.

  • Study dates: April 2020 through spring 2021