About this project
Summary of MnDOT work
- Repair 7.3 miles of concrete pavement on Hwy 75 from Trosky to Pipestone.
- Install paved shoulders, turn-lane extensions, and frost heave corrections.
- Replace five box culverts and repair additional culverts.
Traffic impacts
- A detour will be required during construction
- The detour route will be determined about one year prior to construction
- Motorists can expect delays traveling through the area during construction