Hwy 73 corridor study

Carlton County

About this project

A rendering of the Hwy 73 corridor study from Kettle River to Cromwell.

Click image for full-size image

Summary of work

In order to meet requirements for federal funding, and to better understand the current and future needs of Hwy 73 from Cromwell to Kettle River, MnDOT is taking a deeper look into how the roadway functions today in order to plan for its future by undertaking a corridor study.

During the study, MnDOT will:
  • Perform a safety analysis along the corridor.
  • Engage local partners, organizations and community members to gather feedback on existing roadway issues and develop potential corridor alternatives and cost estimates that address the issues and concerns identified by community members and the traffic analysis.
  • Identify environmental impacts for each alternative.
  • Identify potential improvement projects that match the needs of the corridor with available funding.

Public meetings

MnDOT is hosting a public update meeting on Thursday, March 14, at 4:30 p.m. in the Cromwell Pavilion, 5577 Cromwell Park Drive, Cromwell, MN 55726. There will be a brief presentation on the corridor study and some possible alternatives, followed by time for questions and answers. For those unable to attend, materials will be posted online after the meeting.

There will also be a community survey posted here soon, asking for feedback on possible alternatives.

Past meetings

MnDOT hosted a public meeting on April 12, 2023, in Cromwell to learn about the purpose of the study.