| Route (Hwy or Interstate) |
Description |
Begin date |
End date |
Total cost |
2026 construction cost |
Website |
| Hwy 3 |
Build roundabout at Hwy 3 (Chippendale Ave)/CR 86 (280th St) in Castle Rock and Waterford townships (Dakota County-led project) |
March 2026 |
Fall 2026 |
$1.15 million |
$1.15 million |
co.dakota.mn.us/Transportation/PlannedConstruction/CR86Roundabouts |
| Hwy 5 |
Landscape along Hwy 5 from Mendota Heights (East 7th St) in St Paul to McKnight Rd in Maplewood |
April 2025 |
June 2026 |
$163,000 |
$163,000 |
None |
| Hwy 5 |
Reconstruct Hwy 5 (Stillwater Rd) from McKnight Rd in St Paul to Lakewood Dr in Maplewood; convert from 4 to 3 lanes; improve accessibility; improve drainage; replace traffic signals |
July 2026 |
November 2026 |
$3 million |
$3 million |
mndot.gov/metro/projects/hwy5maplewood |
| Hwy 5 |
Construct roundabout at Hwy 5/CR 11 (city of Victoria-led project) |
July 2025 |
Fall 2026 |
$950,000 |
$950,000 |
victoriamn.gov/hwy5-11 |
| Hwy 5/Hwy 41 |
Convert Hwy 5 from 2 to 4 lanes from 80th St in Victoria to Century Blvd in Chanhassen; reconstruct Hwy 41 from just north of 82nd St to Tanadoona Dr in Chanhassen; build pedestrian bridge; build trails; improve accessibility; replace traffic signals; build roundabout at Hwy 5 and Commercial Ave (Carver County-led project) |
March 2026 |
October 2027 |
$6.8 million |
$1.3 million |
carvercountymn.gov/departments/public-works/projects-studies/highway-5-improvements |
| Hwy 5, Hwy 61 |
Resurface Hwy 5 (E 7th St) from I-94 to Minnehaha Ave in St Paul, and Hwy 61 (Arcade St) from E 7th St to Roselawn Ave in Maplewood; repair sidewalks; update curb ramps and driveways; update and improve pedestrian lighting, traffic signals and bus stops |
April 2025 |
October 2026 |
$32.517 million |
$12.3 million |
mndot.gov/metro/projects/e7th-arcade |
| Hwy 10 |
Install traffic management system on Hwy 10 from Thurston Ave NW in Anoka to Hwy 101 in Elk River; and on Hwy 101 from CR 38 (70th St NE) to north of CR 39 in Otsego |
August 2026 |
June 2027 |
$700,000 |
$630,000 |
None |
| Hwy 10 |
Resurface Hwy 10 (Point Douglas Dr S) from east of Hwy 61 to the west side of the St Croix River bridge in Denmark Township |
August 2026 |
October 2026 |
$1.5 million |
$1.5 million |
None |
| Hwy 10 |
Resurface Hwy 10 from CR 78 (Hanson Blvd) to CR 9 (Round Lake Blvd) in Coon Rapids; expand from 2 to 3 lanes; resurface pavement; add new guardrail, traffic management system and noise wall |
April 2025 |
June 2026 |
$39.657 million |
$25 million |
mndot.gov/metro/projects/hwy10coonrapids |
| Hwy 12 |
Reconstruct Hwy 12 from Shoreline Dr to Central Ave N in Wayzata; resurface Hwy 12 from Central Ave N in Wayzata to I-494 in Minnetonka; repair ramps; replace lighting; improve accessibility |
April 2026 |
September 2026 |
$50 million |
$50 million |
mndot.gov/metro/projects/hwy12wayzata-minnetonka |
| Hwy 13 |
Resurface Hwy 13 (Sibley Memorial Hwy) from I-494 to Hwy 62 in Mendota Heights; improve drainage; add turn lane |
September 2026 |
October 2026 |
$2.3 million |
$2.3 million |
mndot.gov/metro/projects/sibleymemorialhwy |
| Hwy 13 |
Build new interchange at Hwy 13/Nicollet Ave intersection |
September 2026 |
July 2028 |
$50.5 million |
$10 million |
mndot.gov/metro/projects/hwy13savageburnsville |
| Hwy 25 |
Build roundabout at Hwy 25/CR 3 (Main St) in Belle Plaine (Belle Plaine-led project) |
July 2026 |
October 2026 |
$1 million |
$1 million |
belleplainemn.gov/251/Project-Updates |
| I-35E |
Replace I-35E concrete pavement from north exit of Shepard Rd to Hwy 5 (W 7th St) in St Paul; replace bridge over Shepard Rd; repair bridge over Mississippi River; update signals |
April 2026 |
June 2027 |
$19.1 million |
$17.19 million |
mndot.gov/metro/projects/i35estpaul-lilydale |
| I-35E |
Replace I-35E pedestrian bridge ramp and railing from Grand Ave to Kellogg Blvd in St Paul; repaint bridge; part of larger statewide pedestrian bridge improvement project |
April 2026 |
July 2026 |
$2.7 million |
$2.7 million |
None |
| I-35E |
Reconstruct/resurface Country Dr at I-35E west ramp terminals and Little Canada Rd (CR 23), and from Little Canada Rd to South Owasso Blvd in Little Canada; build roundabout at CR 120 (Little Canada Rd)/CR C/Lake Shore Ave; update sidewalks and trails (Little Canada-led project) |
June 2026 |
October 2027 |
$890,000 |
$890,000 |
littlecanadamn.org/766/Little-Canada-Road-Improvement-Project |
| I-35W, Hwy 13 |
Resurface or reconstruct I-35W from Cliff Rd to the I-35/I-35W/I-35E split in Burnsville; repair or replace bridges at Cliff Rd, Hwy 13 and Burnsville Pkwy; update guardrail and improve drainage |
April 2025 |
October 2026 |
$71.5 million |
$37.3 million |
mndot.gov/metro/projects/i35wburnsville |
| I-35W, I-494 |
Reconstruct and repair I-494 pavement from East Bush Lake Rd in Edina to 12th Ave in Richfield; replace and repair bridges; build pedestrian bridge; reconstruct I-35W interchange; add E-Zpass lanes; construct noise walls |
March 2023 |
November 2026 |
$377.41 million |
$80 million |
mndot.gov/metro/projects/i494edina-richfield |
| Hwy 36 |
Replace pedestrian lift bridge electrical cables over St Croix River in Stillwater |
September 2026 |
December 2026 |
$2.44 million |
$2.44 million |
mndot.gov/stillwaterliftbridge |
| Hwy 36 |
Build interchange at Hwy 36/CR 17 (Lake Elmo Ave) intersection in Grant and Lake Elmo; modify access and construct south frontage road at Keats Ave N (Washington County-led project) |
Spring 2026 |
Fall 2027 |
$8 million |
$4 million |
co.washington.mn.us/LakeElmoAvenue |
| Hwy 50 |
Resurface Hwy 50 (240th St) from Hwy 52 (Emery Ave/Rochester Blvd) in Hampton to Hwy 61 (Lillehei Ave) in Douglas Township; add right turn lane at CR 85 (Goodwin Ave); reconstruct Hwy 50/Hogan Ave intersection in New Trier; resurface Hogan Ave just north of intersection; improve accessibility, drainage and guardrail |
July 2026 |
September 2026 |
$8.6 million |
$8.6 million |
mndot.gov/metro/projects/hwy50hampton-douglastwp |
| Hwy 51 |
Resurface Hwy 51 at Grand Ave in St Paul (Led by city of St Paul) |
June 2026 |
August 2026 |
$400,000 |
$400,000 |
None |
| Hwy 51 |
Repair and resurface Hwy 51 (Snelling Ave N) from the north end of bridge over Hwy 36 in Roseville to just north of near Grey Fox Rd in Arden Hills; improve guardrail and accessibility; construct trail along west side of Snelling Ave from Lydia Ave to Snelling Ave N/CR 76 |
May 2026 |
November 2026 |
$8.5 million |
$8.5 million |
mndot.gov/metro/projects/snellingaveroseville-ardenhills |
| Hwy 52 |
Construct noise wall on southbound Hwy 52 from near Mendota Rd E to 49th St E in Inver Grove Heights; repair drainage |
February 2026 |
October 2026 |
$1.87 million |
$1.87 million |
mndot.gov/metro/projects/standalonenoisebarrier |
| Hwy 52 |
Replace signs on Hwy 52 from Hwy 19 (Main St) in Cannon Falls to CR 86 (Rochester Blvd) in Hampton |
July 2026 |
October 2026 |
$230,000 |
$230,000 |
None |
| Hwy 52 |
Improve turn lane capacity at Hwy 52/CR 42 interchange; add new traffic signals (Dakota County-led project) |
May 2026 |
November 2026 |
$2.4 million |
$2.4 million |
co.dakota.mn.us/Transportation/PlannedConstruction/CR42-Highway52 |
| Hwy 52 |
Replace Hwy 52 pedestrian bridge between Belvidere St/Lafayette Service Rd and Butler Ave in West St Paul |
April 2026 |
July 2026 |
$3.2 million |
$3.2 million |
None |
| Hwy 55 |
Improve backage road access off of Hwy 55 in Greenfield |
August 2026 |
October 2026 |
$560,000 |
$560,000 |
None |
| Hwy 55 |
Improve Hwy 55 (Hiawatha Ave) intersections at 46th St E and 45th St E in Minneapolis; build curb bump-outs and pedestrian medians; update signals at 46th St E; install new pedestrian signal at 45th St E; improve accessibility |
August 2026 |
November 2026 |
$1.8 million |
$1.8 million |
mndot.gov/metro/projects/hiawathaavempls |
| Hwy 56 |
Build roundabout at Hwy 56 (Randolph Blvd/Emery Ave)/CR 86 (280th St) in Hampton and Randolph townships (Dakota County-led project) |
June 2026 |
Fall 2026 |
$850,000 |
$850,000 |
co.dakota.mn.us/Transportation/PlannedConstruction/CR86Roundabouts |
| Hwy 61 |
Update signals at Hwy 61/CR B in Maplewood; improve accessibility; update drainage; improve traffic management system |
April 2026 |
June 2026 |
$1.14 million |
$1.14 million |
None |
| Hwy 61 |
Replace signal at Hwy 61/CR 96 (Lake Ave) in White Bear Lake; improve accessibility; update drainage |
August 2026 |
October 2026 |
$1.42 million |
$1.42 million |
None |
| Hwy 62 |
Replace Hwy 62 pedestrian bridge west of Valley View Rd in Edina (City of Edina-led project) |
April 2026 |
October 2026 |
$3.2 million |
$3.2 million |
bettertogetheredina.org/rosland-park-bridge |
| Hwy 65 |
Reconstruct Hwy 65 in Blaine to improve safety and mobillity; construct new Hwy 65 (Central Ave) interchanges at 99th Ave, 105th Ave, CR 12 (109th Ave) and 117th Ave in Blaine; construct and improve frontage roads; build pedestrian bridge; build noise walls; improve accessibility; improve drainage |
June 2026 |
November 2029 |
$176 million |
$25 million |
mndot.gov/metro/projects/hwy65blaine |
| Hwy 77 |
Repair 10 bridges on Hwy 77 from the Minnesota River bridge in Eagan to American Blvd in Bloomington |
May 2026 |
May 2027 |
$51.698 million |
$1.5 million |
mndot.gov/metro/projects/hwy77applevalley-richfield |
| Hwy 77 |
Resurface Hwy 77 (Cedar Ave), including ramps and I-35E collector-distributor roads, from 138th St in Apple Valley to the Dakota/Hennepin County line |
July 2026 |
October 2027 |
$48.9 million |
$20 million |
mndot.gov/metro/projects/hwy77applevalley-richfield |
| I-94 |
Repair I-94 bridges over St Croix River in Lakeland and Hudson, Wisconsin; project led by Wisconsin DOT |
June 2025 |
October 2026 |
$4.5 million |
$4.2 million |
wisconsindot.gov/Pages/projects/by-region/nw/i94stcroixbridges/default.aspx |
| I-94 |
Landscape I-94 from Hwy 120 (Century Ave) in Oakdale to St Croix River in Lakeland |
April 2026 |
July 2026 |
$150,000 |
$150,000 |
None |
| I-94 |
Repair I-94 drainage from east of Hwy 95 (Stagecoach Trl N) to St Croix River in Lakeland |
June 2026 |
October 2026 |
$2 million |
$2 million |
None |
| I-94 |
Seal decks on five I-94 bridges from Hwy 55/Hiawatha Ave to East River Pkwy/Franklin Ave SE in Minneapolis (part of larger bridge repair project) |
April 2026 |
May 2026 |
$450,000 |
$450,000 |
None |
| I-94 |
Repair and upgrade fire and carbon monoxide detection in Lowry Hill Tunnel between I-394 and I-35W in Minneapolis |
July 2026 |
October 2026 |
$500,000 |
$500,000 |
None |
| I-94, I-35E |
Replace John Ireland Blvd bridge between Kellogg Blvd and Rice St; repair 9 bridges, paint 2 bridges and replace bridge supports on 2 bridges on I-94 from Western Ave to Mounds Blvd and I-35E from 10th St to Jackson St in St Paul |
June 2025 |
September 2026 |
$22.4 million |
$13.3 million |
mndot.gov/metro/projects/johnirelandbridge |
| Hwy 95 |
Construct roundabout at Hwy 95 (Manning Ave S)/CR 18 (Bailey Rd/40th St) in Afton/Woodbury |
May 2026 |
November 2026 |
$3.56 million |
$3.56 million |
mndot.gov/metro/projects/hwy95woodbury-afton |
| Hwy 95 |
Construct dedicated left and right turn lane on Hwy 95 at Pleasant Valley Rd (CR 26) in Franconia; install lighting; build culvert |
May 2026 |
August 2026 |
$2.7 million |
$2.7 million |
mndot.gov/metro/projects/hwy95franconiatwp |
| Hwy 95, Hwy 243 |
Construct roundabout at Hwy 95 (St Croix Trl N)/Hwy 243 (Osceola Rd) in Franconia |
April 2026 |
October 2026 |
$4.2 million |
$4.2 million |
mndot.gov/metro/projects/hwy95franconiatwp |
| Hwy 97 |
Reconstruct Hwy 97 pavement from I-35 to Hwy 61 in Forest Lake; add trail along south side of road; build roundabout at Fenway Ave; construct turn lanes, median island, drainage pipes and ponds |
April 2025 |
October 2026 |
$14.37 million |
$7.65 million |
mndot.gov/metro/projects/hwy97-forestlake |
| Hwy 149 |
Resurface Hwy 149 (Dodd Rd) from Hwy 3 (Robert St) in Inver Grove Heights to Hwy 55 in Eagan |
Summer 2026 |
Summer 2026 |
$1.8 million |
$1.8 million |
None |
| Hwy 169 |
Construct interchange at Hwy 169 and Hwy 282/CR 9 intersection in Jordan; build two roundabouts, bridges, pedestrian tunnel, sidewalks, retaining walls and noise walls |
February 2025 |
May 2028 |
$62.53 million |
$35 million |
mndot.gov/metro/projects/hwy169-hwy282jordan |
| Hwy 169 |
Replace signals on Hwy 169 at Cedar Lake Rd east ramp in St Louis Park and west ramp in Minnetonka; improve accessibility and drainage |
June 2026 |
September 2026 |
$4.2 million |
$4.2 million |
mndot.gov/metro/projects/cedarlakerd-jordanave |
| Hwy 169 |
Repair Hwy 169 concrete pavement from 85th Ave N to E Hayden Lake Rd in Brooklyn Park, Osseo and Champlin |
July 2026 |
October 2026 |
$3.25 million |
$3.25 million |
None |
| Hwy 212 |
Construct 4 J-turn intersections to improve safety on Hwy 212 from Hwy 5/Hwy 25/CR 131 in Young America Township to Hwy 5/Hwy 25/Reform St in Norwood Young America; install cable median barrier; build accessible crossings |
May 2026 |
October 2026 |
$3.5 million |
$3.5 million |
mndot.gov/metro/projects/hwy212nya |
| Hwy 212 |
Reconstruct Hwy 212 from a two-lane highway to a divided four-lane highway between CR 34 in Norwood Young America and CR 36 in Benton Township; build overpass with right-in, right-out access at CR 51; improve drainage (Carver County-led project) (Yr 3 of 3) |
July 2024 |
Fall 2026 |
$22.3 million |
$13.5 million |
carvercountymn.gov/departments/public-works/projects-studies/highway-212-project-benton-township |
| Hwy 212 |
Repair settlement on Hwy 212 near CR 43 in Dahlgren Township |
Summer 2026 |
Summer 2026 |
$3.5 million |
$3.5 million |
mndot.gov/metro/projects/hwy212dahlgrentwp |
| Hwy 243 |
Replace Hwy 243 bridge over the St Croix River between Franconia Township and Osceola |
August 2026 |
June 2029 |
$24 million |
$6 million |
mndot.gov/metro/projects/hwy243osceola |
| Hwy 280 |
Resurface Hwy 280 from I-94 in St Paul to I-35W in Roseville; repair concrete pavement; update traffic management system, update guardrail; repair 8 bridges |
April 2026 |
November 2026 |
$23.44 million |
$23.44 million |
mndot.gov/metro/projects/hwy280stpaul-roseville |
| I-394 |
Extend and add acceleration/deceleration lanes at I-394/Louisiana Ave interchange; repair bridge; update retaining wall; replace signals; update sidewalks, improve accessibility; remove free right turn lanes |
July 2025 |
September 2026 |
$14 million |
$11.3 million |
mndot.gov/metro/projects/i394stlouispark |
| I-394 |
Replace lighting on I-394 from General Mills Blvd to Park Place Blvd in Golden Valley, and from France Ave S to Kenwood Pkwy in Minneapolis |
April 2026 |
October 2026 |
$3 million |
$3 million |
None |
| I-394 |
Replace signs on I-394 from east of Hwy 169 in Golden Valley to Theodore Wirth Pkwy in Minneapolis |
April 2026 |
August 2026 |
$1.04 million |
$1.04 million |
None |
| I-394 |
Replace signals at I-394/CR 73 (Hopkins Crossroad) north ramp in Minnetonka; improve accessibility |
April 2026 |
July 2026 |
$890,000 |
$890,000 |
None |
| I-394 |
Replace I-394 traffic signals at Plymouth Rd and Ridgedale Dr in Minnetonka |
July 2026 |
October 2026 |
$2.25 million |
$2.25 million |
None |
| I-394, I-94 |
Repair 28 bridges on I-394 from Penn Ave to 11th St N and repair 6 bridges on I-94 from Glenwood Ave N to I-394 in Minneapolis; realign I-394 to Dunwoody Blvd ramp; improve accessibility, lighting, sidewalks and drainage |
July 2025 |
November 2026 |
$67.2 million |
$52 million |
mndot.gov/metro/projects/i94-i394minneapolis |
| I-494 |
Replace signs on I-494 from Argenta Trl to Hwy 77 in Eagan and Bloomington |
August 2026 |
November 2026 |
$1.4 million |
$1.4 million |
None |
| I-494 |
Repair drainage and reconstruct pond at I-494/Minnesota River in Eagan |
October 2026 |
August 2027 |
$3.82 million |
$2.55 million |
None |
| I-494 |
Repair 5 I-494 bridges and pavement from 24th Ave in Bloomington (over the Minnesota River) to Pilot Knob Rd in Mendota Heights/Eagan; replace lighting; reconstruct trail; improve drainage (Yr 4 of 4) |
April 2023 |
September 2026 |
$62.17 million |
$1.1 million |
mndot.gov/metro/projects/i494mnriverbridge |
| Various locations |
Repair and replace overhead sign structures at various locations in Metro District |
August 2026 |
July 2027 |
$3 million |
$2.25 million |
None |
| Various locations |
Pond preservation at various locations in Metro District |
October 2024 |
June 2026 |
$1.533 million |
$400,000 |
None |
| Various locations |
Replace overhead sign structures in various locations in Metro District |
July 2025 |
June 2026 |
$3 million |
$2.4 million |
None |
| Various locations |
Pond preservation at various locations |
May 2025 |
June 2026 |
$1.92 million |
$1.52 million |
None |
| Various locations |
Add new cameras for traffic management system in various locations |
August 2025 |
May 2026 |
$960,000 |
$250,000 |
None |
| Various locations |
Seal bridge decks at various locations in Metro District |
June 2025 |
February 2027 |
$4 million |
$1.5 million |
None |
| Various locations |
Replace traffic signal detectors in various locations in Metro District |
July 2026 |
June 2027 |
$75,000 |
$4,000 |
None |
| Various locations |
Pond preservation at various locations in Metro District |
October 2024 |
June 2026 |
$1.5 million |
$40,000 |
None |
| Various locations |
Replace traffic signal detectors at various locations in Metro District |
July 2025 |
June 2026 |
$50,000 |
$30,000 |
None |
| Various locations |
Replace overhead sign structures in various locations in Metro District |
July 2025 |
June 2026 |
$2.67 million |
$2.48 million |
None |
| Various locations |
Pond preservation at various locations in Metro District |
May 2025 |
June 2026 |
$980,000 |
$580,000 |
None |