2026 construction season

Twin Cities metro area

State highway and bridge projects

Hwy 97 Forest Lake Hwy 169 & Hwy 282/CR 9 I-94 St. Croix Bridge Hwy 50 Hampton, New Trier & Douglas Township Hwy 95 Franconia Township Hwy 65 Blaine Hwy 280 improvements Hwy 55/Hiawatha Avenue John Ireland Boulevard bridge & nine bridges over I-94 & I-35E Cedar Lake Rd & Jordan Ave Hwy 12 Wayzata, Plymouth & Minnetonka Hwy 51/Snelling Ave/Hamline Ave Hwy 95 Woodbury & Afton I-494 Edina, Bloomington & Richfield Hwy 5/East 7th Arcade St/Hwy 61 Hwy 243 Osceola Bridge Hwy 5/Stillwater Rd Maplewood Hwy 77/Cedar Ave I-394 & I-94 Mpls Hwy 10 Coon Rapids Hwy 212 Norwood Young America & Young America Township I-35W Burnsville Hwy 52 noise barrier I-35E & Shepard Rd I-394 St. Louis Park Sibley Memorial Hwy Hwy 212 Dahlgren Township
Route (Hwy or Interstate) Description Begin date End date Total cost 2026 construction cost Website
Hwy 3 Build roundabout at Hwy 3 (Chippendale Ave)/CR 86 (280th St) in Castle Rock and Waterford townships (Dakota County-led project) March 2026 Fall 2026 $1.15 million $1.15 million co.dakota.mn.us/Transportation/PlannedConstruction/CR86Roundabouts
Hwy 5 Landscape along Hwy 5 from Mendota Heights (East 7th St) in St Paul to McKnight Rd in Maplewood April 2025 June 2026 $163,000 $163,000 None
Hwy 5 Reconstruct Hwy 5 (Stillwater Rd) from McKnight Rd in St Paul to Lakewood Dr in Maplewood; convert from 4 to 3 lanes; improve accessibility; improve drainage; replace traffic signals July 2026 November 2026 $3 million $3 million mndot.gov/metro/projects/hwy5maplewood
Hwy 5 Construct roundabout at Hwy 5/CR 11 (city of Victoria-led project) July 2025 Fall 2026 $950,000 $950,000 victoriamn.gov/hwy5-11
Hwy 5/Hwy 41 Convert Hwy 5 from 2 to 4 lanes from 80th St in Victoria to Century Blvd in Chanhassen; reconstruct Hwy 41 from just north of 82nd St to Tanadoona Dr in Chanhassen; build pedestrian bridge; build trails; improve accessibility; replace traffic signals; build roundabout at Hwy 5 and Commercial Ave (Carver County-led project) March 2026 October 2027 $6.8 million $1.3 million carvercountymn.gov/departments/public-works/projects-studies/highway-5-improvements
Hwy 5, Hwy 61 Resurface Hwy 5 (E 7th St) from I-94 to Minnehaha Ave in St Paul, and Hwy 61 (Arcade St) from E 7th St to Roselawn Ave in Maplewood; repair sidewalks; update curb ramps and driveways; update and improve pedestrian lighting, traffic signals and bus stops April 2025 October 2026 $32.517 million $12.3 million mndot.gov/metro/projects/e7th-arcade
Hwy 10 Install traffic management system on Hwy 10 from Thurston Ave NW in Anoka to Hwy 101 in Elk River; and on Hwy 101 from CR 38 (70th St NE) to north of CR 39 in Otsego August 2026 June 2027 $700,000 $630,000 None
Hwy 10 Resurface Hwy 10 (Point Douglas Dr S) from east of Hwy 61 to the west side of the St Croix River bridge in Denmark Township August 2026 October 2026 $1.5 million $1.5 million None
Hwy 10 Resurface Hwy 10 from CR 78 (Hanson Blvd) to CR 9 (Round Lake Blvd) in Coon Rapids; expand from 2 to 3 lanes; resurface pavement; add new guardrail, traffic management system  and noise wall April 2025 June 2026 $39.657 million $25 million mndot.gov/metro/projects/hwy10coonrapids
Hwy 12 Reconstruct Hwy 12 from Shoreline Dr to Central Ave N in Wayzata; resurface Hwy 12 from Central Ave N in Wayzata to I-494 in Minnetonka; repair ramps; replace lighting; improve accessibility April 2026 September 2026 $50 million $50 million mndot.gov/metro/projects/hwy12wayzata-minnetonka
Hwy 13 Resurface Hwy 13 (Sibley Memorial Hwy) from I-494 to Hwy 62 in Mendota Heights; improve drainage; add turn lane September 2026 October 2026 $2.3 million $2.3 million mndot.gov/metro/projects/sibleymemorialhwy
Hwy 13 Build new interchange at Hwy 13/Nicollet Ave intersection September 2026 July 2028 $50.5 million $10 million mndot.gov/metro/projects/hwy13savageburnsville
Hwy 25 Build roundabout at Hwy 25/CR 3 (Main St) in Belle Plaine (Belle Plaine-led project) July 2026 October 2026 $1 million $1 million belleplainemn.gov/251/Project-Updates
I-35E Replace I-35E concrete pavement from north exit of Shepard Rd to Hwy 5 (W 7th St) in St Paul; replace bridge over Shepard Rd; repair bridge over Mississippi River; update signals April 2026 June 2027 $19.1 million $17.19 million mndot.gov/metro/projects/i35estpaul-lilydale
I-35E Replace I-35E pedestrian bridge ramp and railing from Grand Ave to Kellogg Blvd in St Paul; repaint bridge; part of larger statewide pedestrian bridge improvement project April 2026 July 2026 $2.7 million $2.7 million None
I-35E Reconstruct/resurface Country Dr at I-35E west ramp terminals and Little Canada Rd (CR 23), and from Little Canada Rd to South Owasso Blvd in Little Canada; build roundabout at CR 120 (Little Canada Rd)/CR C/Lake Shore Ave; update sidewalks and trails (Little Canada-led project) June 2026 October 2027 $890,000 $890,000 littlecanadamn.org/766/Little-Canada-Road-Improvement-Project
I-35W, Hwy 13 Resurface or reconstruct I-35W from Cliff Rd to the I-35/I-35W/I-35E split in Burnsville; repair or replace bridges at Cliff Rd, Hwy 13 and Burnsville Pkwy; update guardrail and improve drainage April 2025 October 2026 $71.5 million $37.3 million mndot.gov/metro/projects/i35wburnsville
I-35W, I-494 Reconstruct and repair I-494 pavement from East Bush Lake Rd in Edina to 12th Ave in Richfield; replace and repair bridges; build pedestrian bridge; reconstruct I-35W interchange; add E-Zpass lanes; construct noise walls March 2023 November 2026 $377.41 million $80 million mndot.gov/metro/projects/i494edina-richfield
Hwy 36 Replace pedestrian lift bridge electrical cables over St Croix River in Stillwater September 2026 December 2026 $2.44 million $2.44 million mndot.gov/stillwaterliftbridge
Hwy 36 Build interchange at Hwy 36/CR 17 (Lake Elmo Ave) intersection in Grant and Lake Elmo; modify access and construct south frontage road at Keats Ave N (Washington County-led project) Spring 2026 Fall 2027 $8 million $4 million co.washington.mn.us/LakeElmoAvenue
Hwy 50 Resurface Hwy 50 (240th St) from Hwy 52 (Emery Ave/Rochester Blvd) in Hampton to Hwy 61 (Lillehei Ave) in Douglas Township; add right turn lane at CR 85 (Goodwin Ave); reconstruct Hwy 50/Hogan Ave intersection in New Trier; resurface Hogan Ave just north of intersection; improve accessibility, drainage and guardrail July 2026 September 2026 $8.6 million $8.6 million mndot.gov/metro/projects/hwy50hampton-douglastwp
Hwy 51 Resurface Hwy 51 at Grand Ave in St Paul (Led by city of St Paul) June 2026 August 2026 $400,000 $400,000 None
Hwy 51 Repair and resurface Hwy 51 (Snelling Ave N) from the north end of bridge over Hwy 36 in Roseville to just north of near Grey Fox Rd in Arden Hills; improve guardrail and accessibility; construct trail along west side of Snelling Ave from Lydia Ave to Snelling Ave N/CR 76 May 2026 November 2026 $8.5 million $8.5 million mndot.gov/metro/projects/snellingaveroseville-ardenhills
Hwy 52 Construct noise wall on southbound Hwy 52 from near Mendota Rd E to 49th St E in Inver Grove Heights; repair drainage February 2026 October 2026 $1.87 million $1.87 million mndot.gov/metro/projects/standalonenoisebarrier
Hwy 52 Replace signs on Hwy 52 from Hwy 19 (Main St) in Cannon Falls to CR 86 (Rochester Blvd) in Hampton July 2026 October 2026 $230,000 $230,000 None
Hwy 52 Improve turn lane capacity at Hwy 52/CR 42 interchange; add new traffic signals (Dakota County-led project) May 2026 November 2026 $2.4 million $2.4 million co.dakota.mn.us/Transportation/PlannedConstruction/CR42-Highway52
Hwy 52 Replace Hwy 52 pedestrian bridge between Belvidere St/Lafayette Service Rd and Butler Ave in West St Paul April 2026 July 2026 $3.2 million $3.2 million None
Hwy 55 Improve backage road access off of Hwy 55 in Greenfield August 2026 October 2026 $560,000 $560,000 None
Hwy 55 Improve Hwy 55 (Hiawatha Ave) intersections at 46th St E and 45th St E in Minneapolis; build curb bump-outs and pedestrian medians; update signals at 46th St E; install new pedestrian signal at 45th St E; improve accessibility August 2026 November 2026 $1.8 million $1.8 million mndot.gov/metro/projects/hiawathaavempls
Hwy 56 Build roundabout at Hwy 56  (Randolph Blvd/Emery Ave)/CR 86 (280th St) in Hampton and Randolph townships (Dakota County-led project) June 2026 Fall 2026 $850,000 $850,000 co.dakota.mn.us/Transportation/PlannedConstruction/CR86Roundabouts
Hwy 61 Update signals at Hwy 61/CR B in Maplewood; improve accessibility; update drainage; improve traffic management system April 2026 June 2026 $1.14 million $1.14 million None
Hwy 61 Replace signal at Hwy 61/CR 96 (Lake Ave) in White Bear Lake; improve accessibility; update drainage August 2026 October 2026 $1.42 million $1.42 million None
Hwy 62 Replace Hwy 62 pedestrian bridge west of Valley View Rd in Edina (City of Edina-led project) April 2026 October 2026 $3.2 million $3.2 million bettertogetheredina.org/rosland-park-bridge
Hwy 65 Reconstruct Hwy 65 in Blaine to improve safety and mobillity; construct new Hwy 65 (Central Ave) interchanges at 99th Ave, 105th Ave, CR 12 (109th Ave) and 117th Ave in Blaine; construct and improve frontage roads; build pedestrian bridge; build noise walls; improve accessibility; improve drainage June 2026 November 2029 $176 million $25 million mndot.gov/metro/projects/hwy65blaine
Hwy 77 Repair 10 bridges on Hwy 77 from the Minnesota River bridge in Eagan to American Blvd in Bloomington May 2026 May 2027 $51.698  million $1.5 million mndot.gov/metro/projects/hwy77applevalley-richfield
Hwy 77 Resurface Hwy 77 (Cedar Ave), including ramps and I-35E collector-distributor roads, from 138th St in Apple Valley to the Dakota/Hennepin County line July 2026 October 2027 $48.9 million $20 million mndot.gov/metro/projects/hwy77applevalley-richfield
I-94 Repair I-94 bridges over St Croix River in Lakeland and Hudson, Wisconsin; project led by Wisconsin DOT June 2025 October 2026 $4.5 million $4.2 million wisconsindot.gov/Pages/projects/by-region/nw/i94stcroixbridges/default.aspx
I-94 Landscape I-94 from Hwy 120 (Century Ave) in Oakdale to St Croix River in Lakeland April 2026 July 2026 $150,000 $150,000 None
I-94 Repair I-94 drainage from east of Hwy 95 (Stagecoach Trl N) to St Croix River in Lakeland June 2026 October 2026 $2 million $2 million None
I-94 Seal decks on five I-94 bridges from Hwy 55/Hiawatha Ave to East River Pkwy/Franklin Ave SE in Minneapolis (part of larger bridge repair project) April 2026 May 2026 $450,000 $450,000 None
I-94 Repair and upgrade fire and carbon monoxide detection in Lowry Hill Tunnel between I-394 and I-35W in Minneapolis July 2026 October 2026 $500,000 $500,000 None
I-94, I-35E Replace John Ireland Blvd bridge between Kellogg Blvd and Rice St; repair 9 bridges, paint 2 bridges and replace bridge supports on 2 bridges on I-94 from Western Ave to Mounds Blvd and I-35E from 10th St to Jackson St in St Paul June 2025 September 2026 $22.4 million $13.3 million mndot.gov/metro/projects/johnirelandbridge
Hwy 95 Construct roundabout at Hwy 95 (Manning Ave S)/CR 18 (Bailey Rd/40th St) in Afton/Woodbury May 2026 November 2026 $3.56 million $3.56 million mndot.gov/metro/projects/hwy95woodbury-afton
Hwy 95 Construct dedicated left and right turn lane on Hwy 95 at Pleasant Valley Rd (CR 26) in Franconia; install lighting; build culvert May 2026 August 2026 $2.7 million $2.7 million mndot.gov/metro/projects/hwy95franconiatwp
Hwy 95, Hwy 243 Construct roundabout at Hwy 95 (St Croix Trl N)/Hwy 243 (Osceola Rd) in Franconia April 2026 October 2026 $4.2 million $4.2 million mndot.gov/metro/projects/hwy95franconiatwp
Hwy 97 Reconstruct Hwy 97 pavement from I-35 to Hwy 61 in Forest Lake; add trail along south side of road; build roundabout at Fenway Ave; construct turn lanes, median island, drainage pipes and ponds April 2025 October 2026 $14.37 million $7.65 million mndot.gov/metro/projects/hwy97-forestlake
Hwy 149 Resurface Hwy 149 (Dodd Rd) from Hwy 3 (Robert St) in Inver Grove Heights to Hwy 55 in Eagan Summer 2026 Summer 2026 $1.8 million $1.8 million None
Hwy 169 Construct interchange at Hwy 169 and Hwy 282/CR 9 intersection in Jordan; build two roundabouts, bridges, pedestrian tunnel, sidewalks, retaining walls and noise walls February 2025 May 2028 $62.53 million $35 million mndot.gov/metro/projects/hwy169-hwy282jordan
Hwy 169 Replace signals on Hwy 169 at Cedar Lake Rd east ramp in St Louis Park and west ramp in Minnetonka; improve accessibility and drainage  June 2026 September 2026 $4.2 million $4.2 million mndot.gov/metro/projects/cedarlakerd-jordanave
Hwy 169 Repair Hwy 169 concrete pavement from 85th Ave N to E Hayden Lake Rd in Brooklyn Park, Osseo and Champlin July 2026 October 2026 $3.25 million $3.25 million None
Hwy 212 Construct 4 J-turn intersections to improve safety on Hwy 212 from Hwy 5/Hwy 25/CR 131 in Young America Township to Hwy 5/Hwy 25/Reform St in Norwood Young America; install cable median barrier; build accessible crossings May 2026 October 2026 $3.5 million $3.5 million mndot.gov/metro/projects/hwy212nya
Hwy 212 Reconstruct Hwy 212 from a two-lane highway to a divided four-lane highway between CR 34 in Norwood Young America and CR 36 in Benton Township; build overpass with right-in, right-out access at CR 51; improve drainage (Carver County-led project) (Yr 3 of 3) July 2024 Fall 2026 $22.3 million $13.5 million carvercountymn.gov/departments/public-works/projects-studies/highway-212-project-benton-township
Hwy 212 Repair settlement on Hwy 212 near CR 43 in Dahlgren Township Summer 2026 Summer 2026 $3.5 million $3.5 million mndot.gov/metro/projects/hwy212dahlgrentwp
Hwy 243 Replace Hwy 243 bridge over the St Croix River between Franconia Township and Osceola August 2026 June 2029 $24 million $6 million mndot.gov/metro/projects/hwy243osceola
Hwy 280 Resurface Hwy 280 from I-94 in St Paul to I-35W in Roseville; repair concrete pavement; update traffic management system, update guardrail; repair 8 bridges April 2026 November 2026 $23.44 million $23.44 million mndot.gov/metro/projects/hwy280stpaul-roseville
I-394 Extend and add acceleration/deceleration lanes at I-394/Louisiana Ave interchange; repair bridge; update retaining wall; replace signals; update sidewalks, improve accessibility; remove free right turn lanes July 2025 September 2026 $14 million $11.3 million mndot.gov/metro/projects/i394stlouispark
I-394 Replace lighting on I-394 from General Mills Blvd to Park Place Blvd in Golden Valley, and from France Ave S to Kenwood Pkwy in Minneapolis April 2026 October 2026 $3 million $3 million None
I-394 Replace signs on I-394 from east of Hwy 169 in Golden Valley to Theodore Wirth Pkwy in Minneapolis April 2026 August 2026 $1.04 million $1.04 million None
I-394 Replace signals at I-394/CR 73 (Hopkins Crossroad) north ramp in Minnetonka; improve accessibility April 2026 July 2026 $890,000 $890,000 None
I-394 Replace I-394 traffic signals at Plymouth Rd and Ridgedale Dr in Minnetonka July 2026 October 2026 $2.25 million $2.25 million None
I-394, I-94 Repair 28 bridges on I-394 from Penn Ave to 11th St N and repair 6 bridges on I-94 from Glenwood Ave N to I-394 in Minneapolis; realign I-394 to Dunwoody Blvd ramp; improve accessibility, lighting, sidewalks and drainage July 2025 November 2026 $67.2 million $52 million mndot.gov/metro/projects/i94-i394minneapolis
I-494 Replace signs on I-494 from Argenta Trl to Hwy 77 in Eagan and Bloomington August 2026 November 2026 $1.4 million $1.4 million None
I-494 Repair drainage and reconstruct pond at I-494/Minnesota River in Eagan October 2026 August 2027 $3.82 million $2.55 million None
I-494 Repair 5 I-494 bridges and pavement from 24th Ave in Bloomington (over the Minnesota River) to Pilot Knob Rd in Mendota Heights/Eagan; replace lighting; reconstruct trail; improve drainage (Yr 4 of 4) April 2023 September 2026 $62.17 million $1.1 million mndot.gov/metro/projects/i494mnriverbridge
Various locations Repair and replace overhead sign structures at various locations in Metro District August 2026 July 2027 $3 million $2.25 million None
Various locations Pond preservation at various locations in Metro District October 2024 June 2026 $1.533 million $400,000 None
Various locations Replace overhead sign structures in various locations in Metro District July 2025 June 2026 $3 million $2.4 million None
Various locations Pond preservation at various locations May 2025 June 2026 $1.92 million $1.52 million None
Various locations Add new cameras for traffic management system in various locations August 2025 May 2026 $960,000 $250,000 None
Various locations Seal bridge decks at various locations in Metro District June 2025 February 2027 $4 million $1.5 million None
Various locations Replace traffic signal detectors in various locations in Metro District July 2026 June 2027 $75,000 $4,000 None
Various locations Pond preservation at various locations in Metro District October 2024 June 2026 $1.5 million $40,000 None
Various locations Replace traffic signal detectors at various locations in Metro District July 2025 June 2026 $50,000 $30,000 None
Various locations Replace overhead sign structures in various locations in Metro District July 2025 June 2026 $2.67 million $2.48 million None
Various locations Pond preservation at various locations in Metro District May 2025 June 2026 $980,000 $580,000 None