Minnesota Department of Transportation

511 Travel Info

Highway 51/Snelling Avenue/Hamline Avenue

Arden Hills and Roseville

Project complete

Snelling Avenue between Highway 36 in Roseville and Grey Fox Road in Arden Hills project area map

Snelling Ave. Roseville to Arden Hills project location map.

View full-size map

About this project

In 2026, we will repaiedr and resurfaced Hwy 51/Snelling Ave./Hamline Ave. between Hwy 36 in Roseville and Grey Fox Rd. in Arden Hills to provide better ride quality and service life of the pavement. This project will also added connectivity with a new trail section providing access between Lydia Ave. and Snelling Ave. North (Ramsey Co. Rd. 76). This work was necessary to maintain the highway system and to make accessibility improvements.

Summary of work

  • Repaired/resurfaced Hwy 51 between Hwy 36 in Roseville and Grey Fox Rd. in Arden Hills
  • Repaired and upgraded signals
  • Improved drainage ( replaced or repaired culverts, and larger stormwater pipes and vegetation to control erosion)
  • Replaced guardrail along the highway
  • Upgraded Accessibility to pedestrian ramps and installed Audible Pedestrian Signals at:
    • Co. Rd. B2
    • Co. Rd. C
    • Co. Rd. C2
    • Lydia Ave.
    • Ramsey Co. Rd. E
  • Extended concrete sidewalk along the east side of Snelling Ave. from Co. Rd. C to East Snelling Service Dr.
  • Constructed a trail along the west side of Snelling Ave. between Lydia Ave. and Snelling Ave. North (Ramsey Co. Rd. 76)
  • Removed the uncontrolled pedestrian/bicycle crossing of Snelling Ave. at the intersection with Hamline Ave.