Evaluation Results: Summary and Interpretation
Summarize and present the evaluation results and estimated costs using objective, neutral language. The evaluation process should be considered a tool to inform decisions (“How do these options compare against each other and the statewide objectives?”) and not a tool to make the decision (“Which one is the best?”). While the evaluation results may show a single solution that performs better than the others, more often the evaluation results reveal tradeoffs among solutions. Initial evaluation results combined with partner agency and public engagement often lead to a refinement process – combining elements or otherwise modifying solutions to improve performance, reduce cost and/or adverse impacts.
The corridor plan should not identify a preferred alternative, which is reserved for the environmental review (NEPA and/or MEPA) process. Most infrastructure solutions identified in a corridor plan will be required to go through the environmental review process before advancing to design and construction. NEPA/MEPA clearance requires consideration and evaluation of a range of alternatives developed in response to a compliant Purpose and Need. Solutions identified in a corridor plan are valuable inputs to the environmental review process, but the NEPA/MEPA process must draw its own conclusions with regard to performance against Purpose and Need and subsequent recommendation of a preferred alternative. If the corridor plan identifies a “preferred alternative,” this conclusion is not valid for NEPA/MEPA and renders the corridor plan much less useful in that process.
Recommendations from the corridor plan should be in the form of next steps (see Step 5).
Table 15 . Evaluation Criteria
Category and Topic |
Criteria |
Measurement and Methodology |
Considerations |
Baseline Data Source |
Aesthetics and Visual Quality |
Aesthetics and Visual Quality |
|
|
Step 2: Aesthetics and Visual Quality |
Complete Streets |
Consistency with Complete Streets Hierarchy |
|
|
Step 2: Complete Streets Project Specific Transportation Hierarchy Assessment |
Right-of-Way |
Relation to existing right-of-way |
|
|
Step 2: Right-of-Way |
Category and Topic |
Criteria |
Measurement and Methodology |
Considerations |
Baseline Data Source |
Anticipated Safety Improvement |
Anticipated safety improvement |
Qualitative narrative of anticipated safety improvement based on judgement and understanding of proven safety countermeasures. |
This is a highly simplified safety evaluation that may be applicable for some locations or corridors depending on corridor needs, context, and level of detail for the study. |
Step 3: Critical Crash Locations, Documented Crashes, Crash Risk |
Crash Rates |
Anticipated crash rates |
Methods below assume use of Crash Modification Factors (CMFs):
|
Where possible, include severity rate CMFs or focus on fatal/serious injury crashes (data may not be separated out this way in all cases). |
Step 3: Critical Crash Locations, Documented Crashes |
Crash Risk |
Anticipated crash risk |
Simple qualitative method: Provide responses to the following questions:
Detailed quantitative methods: There are several methods to produce quantitative estimates of crash risk. The Guidebook does not provide guidance on how to complete specific types of analysis but provides the following list of potential methods to consider:
|
Additional methods are available and may be applicable based on determination by analyst and project team. |
Step 3: Crash Risk |
Pedestrian and Bicyclist Safety |
Pedestrian and bicyclist safety improvement |
Simple qualitative method: Provide responses to the following questions:
Detailed quantitative method
|
Safety benefits to non-motorized users may be captured in the other safety evaluation criteria but are included here as a standalone metric to ensure pedestrian and bicycle safety is given priority in alignment with the Safe System Approach and MnDOT's effort to prioritize vulnerable roadway users. |
Step 3: Critical Crash Locations, Documented Crashes, Crash Risk |
Category and Topic |
Criteria |
Measurement and Methodology |
Considerations |
Baseline Data Source |
Asset Condition |
Pavement condition |
|
|
Step 3: Pavement Condition |
Bridge/culvert condition |
|
|
Step 3: Bridge/Culvert Condition |
|
Traffic signal remaining service life |
|
|
Step 3: Traffic Signal Remaining Service Life |
|
Pedestrian ADA Infrastructure |
Sidewalk and curb ramp condition
|
|
Additional methods are available and may be applicable based on determination by analyst and project team. |
Step 3: Sidewalk and Curb Ramp Condition |
Bicycling Infrastructure |
Pavement and facility condition |
|
Additional methods are available and may be applicable based on determination by analyst and project team. |
Step 3: Appropriate Bicycling facilities for Corridor Characteristics |
Maintenance Issues |
Maintenance needs or concerns |
|
|
Step 3: Maintenance Needs or Concerns |
Life cycle costs |
|
While capital costs may be obtained through one-time funding sources, operations and maintenance costs are borne by the agency for infrastructure lifespan |
None |
|
Utilities Scan |
Public and private utility impacts |
|
|
Step 3: Public and Private Utility Scan |
Category and Topic |
Criteria |
Measurement and Methodology |
Considerations |
Baseline Data Source |
Contaminated Materials |
Impact on known contaminated materials sites |
|
Step 3: Contaminated Materials |
|
Historic and Cultural Resources |
Impact on identified historic or cultural resources |
|
Step 3: Historic and Cultural Resources |
|
Section 4(f)/ Section 6(f) Resources |
Impact on potential Section 4(f) and Section 6(f) sites |
|
|
Step 3: Section 4(f)/6(f) Resources |
Threatened and Endangered Species |
Impact on threatened and endangered species |
|
|
Step 3: Threatened and Endangered Species |
Wetlands and Water Resources |
Impact on wetlands; waterways and public waters; floodplains |
|
|
Step 3: Wetlands and Water Resources |
Category and Topic |
Criteria |
Measurement and Methodology |
Considerations |
Baseline Data Source |
Vehicle Miles Traveled |
Change in corridor vehicle miles traveled (VMT) |
Qualitative Option
Quantitative Option
|
Travel demand modeling is likely only an option for specific corridors located within MPO boundaries. |
Step 3: Baseline VMT |
Flood Potential |
Change in flooding susceptibility |
|
|
Step 3: Flood Potential |
Coastal Erosion Hazards |
Erosion potential of segments of the Lake Superior Coast |
|
|
Step 3: Presence of Coastal Erosion Hazards |
Vulnerable Slope Area |
Impact on areas vulnerable to slope failure |
|
|
Step 3: Presence of Vulnerable Slope Areas |
Electric Vehicle Charging |
Change in EV charging locations |
|
|
Step 3: Existing and Proposed EV Charging |
Urban Heat Islands |
Opportunity to reduce urban heat island effects |
|
|
|
Category and Topic |
Criteria |
Measurement and Methodology |
Considerations |
Baseline Data Source |
Facilities and Services |
Presence of System Gaps |
|
Assess for system completeness and directness. A gap may not be limited to a missing segment of sidewalk, for example. It could include the absence of a low stress pedestrian crossing, lack of protected bikeway or a circuitous or indirect and inconvenient route. |
Step 3: Facilities and Services |
Pedestrian Access and Mobility |
Pedestrian Level of Traffic Stress |
|
This evaluation is especially relevant if the corridor context includes populated areas. |
Step 3: Facilities and Services |
Change in Lineal Feet of Pedestrian Facilities |
|
This data will identify differences in the amount of contiguous infrastructure available and should be reviewed as part of the level of traffic stress and system completeness and directness. |
Step 3: Facilities and Services |
|
Pedestrian Crossing Safety and Stress |
|
This evaluation is especially relevant if the corridor context includes populated areas. |
Step 3: Facilities and Services |
|
Pedestrian Access Route (PAR) |
|
|
Step 3: Pedestrian Access Route |
|
Bicyclist Access and Mobility |
Bicycle Level of Traffic Stress |
|
This evaluation is especially relevant if the corridor context includes populated areas, including suburban and rural contexts where shared use paths and regional trails are adjacent to or crossing a corridor. |
Step 3: Bicyclist Access and Mobility |
Separation from Motor Vehicles |
|
Additional methods are available and may be applicable based on determination by analyst and project team |
Step 3: Facilities and Services |
|
Transit |
Access to Transit |
|
|
Step 3:Facilities and Services |
|
|
Step 3: Accessibility and Infrastructure at Transit Stops |
||
Quality and Extent of Facilities at Transit Stop |
|
Not all locations will have fixed route or on-demand transit services. Also identify where regular school bus stops may be located. |
Step 3: Transit |
|
Micro-mobility |
Support for micro-mobility |
|
The context will influence whether this data is relevant to the project. This will be most relevant in populated areas and near destinations. |
Step 3: Micromobility |
Category and Topic |
Criteria |
Measurement and Methodology |
Considerations |
Baseline Data Source |
Access Management |
Access Management Guidelines |
Qualitative Option
Quantitative Option
|
Both qualitative & quantitative methods may be used. Some alternatives will be detailed enough to know proposed impacts to accesses, while less detailed alternatives may focus on the opportunity rather than location of access modifications. |
Step 3: Access Management |
Roadway Capacity, Travel Delay, and Reliability |
Volume-to-Capacity (V/C) Ratio |
|
Consider the extent to which “improving” the V/C ratio may be in tension with other SMTP objectives |
Step 3: Existing and Future V/C Ratios |
Vehicle Miles Traveled (VMT) |
Qualitative Option
Quantitative Option
|
Travel demand modeling is likely only an option for specific corridors located within MPO boundaries. |
Step 3: VMT |
|
Vehicle Travel Delay |
Qualitative Option
Quantitative Option
|
Quantitative method requires traffic modeling to calculate delay for alternatives. |
Step 3: Vehicle Travel Delay |
|
Vehicle Travel Time Reliability |
Qualitative Option
Quantitative Option
|
Requires traffic modeling to calculate reliability for alternatives. For a visioning study, or a study in which travel time reliability is not a concern, consider using judgement and estimating using the qualitative method. |
Step 3: Vehicle Travel Time Reliability |
|
Truck Travel Time Reliability Index (TTTRI) |
Qualitative Option
Quantitative Option
|
Requires traffic modeling to calculate reliability for alternatives. For a visioning study, or a study in which travel time reliability is not a concern, consider using judgement and estimating using the qualitative method. |
Step 3: TTRI |
|
Transportation Systems Management and Operations (TSMO) |
TSMO Strategies and Activities |
Qualitative Option - Answer the following questions:
Quantitative Option – Answer the following question:
|
Coordination with MnDOT’s TSMO Office is recommended to ensure TSMO strategies and activities are incorporated appropriately. |
Step 3: TSMO |
Freight and Intermodal |
Highway Freight Routes and Tonnage |
|
|
Step 3: Highway Freight Routes and Tonnage |
Rail Crossings |
|
If there is a problematic rail crossing today, it likely needs to be evaluated and addressed through a more detailed process than the guidebook is able to get into (unique scenario). |
Step 3: Rail Crossings |
|
Other Freight and Intermodal Characteristics |
|
|
Step 3: Other Freight and Intermodal Characteristics |
Category and Topic |
Criteria |
Measurement and Methodology |
Considerations |
Baseline Data Source |
Agricultural Vehicles |
Impact on agricultural, timber or food/grain vehicle travel |
|
|
Step 3: Agricultural Vehicles |
Access to agricultural product destinations served by the corridor |
|
|
Step 3: Access to Agricultural, Forestry or Natural Resource Product Destinations |
|
Animal-Powered Vehicles |
Impact on animal-powered vehicles |
|
|
Step 3: Animal-Powered Vehicles |
Snowmobile and Off-Highway Vehicles (OHVs) |
Impact on snowmobile and OHVs (all-terrain vehicles, off-highway |
|
Coordinate with local partners to identify where snowmobiles and OHVs cross the corridor |
Step 3: Snowmobiles and Off-Highway Vehicles (OHV) |
Airports |
Impact on affected airports |
|
|
Step 3: Airports |
Economic Development and Jobs |
Impact on access to existing and future employment or commerce destinations served by the corridor |
|
|
Step 3: Economic Development and Jobs |
Tourism |
Impact on tourism-supporting facilities served by the corridor |
|
|
Step 3: Economic Development and Jobs |