Landscaping
The section requires review and inventory of the landscape project site during the Plant Installation Period (PIP), Plant Establishment Period (PEP), and at Final Acceptance.
Format of Red-Lined Drawings
The format should be an electronic PDF or scanned hard-copy drawing of the landscape plan-set, with notes identifying what plants have species substitutions, have been moved, or have died and been replaced or removed for each period of installation, establishment or final acceptance.
Example Red-Lined Landscape Plan (PDF)
Key Contact
Please email questions and make data requests for LANDSCAPE to
carol.zoff@state.mn.us at 651-366-4705.