Minnesota Department of Transportation

511 Travel Info

Bid Letting

Apparent bid results - design build

9-26-18 best value letting

Apparent best value adjusted score results

Willmar Wye Project
180701, 3403-74
Grading, Bituminous Paving and Bridges No. 34031, 34032 and 34X07

Located on U.S. 12 from MP 70.058 to MP 72.165 and on MN 40 from MP 71.544 to MP 72.140 in Kandiyohi County

  Technical Proposal Score Proposal Price Adjusted Score (Price / Technical Score)
Hoffman Construction Company 96.52 $33,980,000.00 352051
The Mathiowetz Construction Co. 97.43 $35,515,018.32 364518
Duininck, Inc. 97.08 $38,887,658.70 400573

9-12-18 best value letting

Apparent best value adjusted score results

I-35 W North MnPASS Project
180705, 6284-180
Grading, Ponds, Unbonded Overlay, New MNPASS Lane, Noise Walls, Lighting, TMS, Signals and Replacement of Bridge No. 62938, 62939, 62940, 62941, 62942 and Rehabilitate Bridge No. 9355, 9492, 9357, 62873, 62890, 9601, 9602, 62911, 9578, 62732, 9605, 02571, 9607, 02566, 02550 and 9831, and Rice Creek Box Culvert 91071

Located on I-35W from County Road C in Roseville to Sunset Avenue in Lino Lakes

  Technical Proposal Score Proposal Price Adjusted Score (Price / Technical Score)
Ames Construction, Inc. 91.7 $207,674,620.00 2258069
McCrossan/Mortenson Joint Venture 93.67 $239,800,000.00 2560051
Shafer Contracting, Co., Inc. 93.21 $234,659,500.00 2517536

5-9-18 best value letting

Apparent best value adjusted score results

I-35W Minnesota River Bridge
180704, 1981-124
Grading, Bituminous Paving and Bridge No. 27W39 and 27W44
Located on I-35W from Cliff Road in Burnsville through the 106th Street Interchange in Bloomington

Bidder Name Technical proposal score Proposal Price Adjusted Score (Price/Technical Score)
Ames Construction, Inc. 97.14 $127,148,003.00 1308915
HCZT, LLC 94.15 $128,998,000.00 1370133
Lunda Construction Company 93.87 $170,343,900.00 1814679

4-18-18 low bid letting

Apparent bid results

TH 2 Erskine Concrete
180703, 6004-24
Weigh Station, Concrete Pavement Replacement and Rehabilitation of Bridges 6006 and 6007
Located on US 2 from EB RP 56.450 to RP 58.680 and WB RP 55.730 to RP 59.040 and on US 59 in Polk County

Bidder Name Bid Amount
PCiRoads, LLC $12,296,459.16
Michels Corporation $14,048,986.00
Schafer Contracting Co, Inc. $15,471,000.00

2-8-18 best value letting

Apparent best value adjusted score results

St. Anthony Falls Anti-Icing Containment System
180702, 2783-174
Anti-icing Containment System within the St. Anthony Falls Bridge Structure

Located in Hennepin County within the City of Minneapolis; Project limits extend a total of 0.505 miles from approximately RP 018+00.200 to 018+00.705 (i.e. the length of the St Anthony Falls bridge) on Interstate 35W.

  Technical Proposal Score Proposal Price Adjusted Score (Price / Technical Score)
Egan Non-Responsive Non-Responsive Non-Responsive
Harris Non-Responsive Non-Responsive Non-Responsive
Northern Air (NAC) 100 $498,000 4980

6-28-17 best value letting

Apparent best value adjusted score results

I-35 W Lake Street Project
170060, 2782-327
Grading, Concrete and Bituminous Surfacing, Retaining and Noise Walls, ADA Improvements,
Signals, Lighting, TMS and Bridge No. 9619, 27700, 27777, 27822, 27841, 27844, 27845, 27851,
27V47, 27V48, 27W01, 27W02, 27W03, 27W04, 27W05, 27W06, 27W07, 27000, 27001, 27838,
27X11, 27X12

75,000/50 In Hennepin County located on: TH 35W from 72 feet S of E 43rd Street to 520 feet E of Chicago Avenue S; TH 94 from Nicollet Avenue S to 70 feet E of Park Avenue S; TH 65 from 168 feet N of E 24th Street to 500 feet S of E 15th Street

  Technical Proposal Score Proposal Price Adjusted Score (Price / Technical Score)
Ames Lunda Shafer: A joint venture 989.23 $239,029,843.40 241632
C.S. McCrossan Construction, Inc. 979.78 $248,061,693.21 253181
HCZT, LLC 965.24 $288,539,923.48 298931
Kiewit Infrastructure Co. 968.21 $376,959,178.29 389336