Project selection

Increasing the transparency of how we select highway construction projects

National Highway System bridge projects

Statewide bridge needs

Scoring criteria for national highway system bridge projects. Out of 100 possible points, 50 points are based on the condition of the bridge, 20 points are based on the risk of service interruption, 20 points are based on the remaining service life of the bridge deck, and 10 points are based on the size of the bridge.

Learn more about how MnDOT evaluates and selects bridge and culvert projects

MnDOT scores bridge condition needs when selecting projects to include in the 10-year Capital Highway Investment Plan. Bridges that carry roads on the National Highway System (NHS) are scored and selected separately from bridge needs off the system. MnDOT’s approach to managing bridge condition follows the guidance and targets in the Transportation Asset Management Plan and the planned outcomes in MnSHIP.

NHS bridges are scored and prioritized statewide with input from district staff. The selection of bridge projects is informed by district staff, experts from MnDOT’s bridge office and the Bridge Replacement and Improvement Management System (BRIM).

Once selected, MnDOT then identifies and evaluates alternatives and other needs, legal requirements, issues and opportunities in coordination with local partners, and considers public input. In the process, non-bridge work may be added to a bridge project or a bridge project may be combined with a nearby pavement project. The department follows a context-sensitive complete streets approach, which considers the needs of all users. The final project may address a substantial number of needs beyond the bridge need that precipitated the project. Projects may move years based on local coordination, project delivery, timing of other nearby construction projects, and funding shifts.

What’s been selected?

Related links

How the projects scored

The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed. View more detailed scores (Excel).

Last updated October 2021

Total score District Bridge number Route Key Intersection or Closest Landmark Work Type Year Planned  High level cost estimate for planning purposes  Comments
DM 100 9217E I 494  Minnesota River Reoverlay deck surface 2023  $7,500,000
DM 100 9217W I 494  Minnesota River Reoverlay deck surface 2023  $7,100,000
DM 100 9600N MN 77  Minnesota River Reoverlay deck surface Not Selected  $8,600,000 Painting and maintenance performed in 2015
DM 100 9600S MN 77  Minnesota River Reoverlay deck surface Not Selected  $8,600,000 Painting and maintenance performed in 2015
DM 97 27855 I 94 MN 55 Overlay deck surface 2024  $5,200,000
D1 95 69802C US 53 19th Replace 2027  $12,700,000 Bridge was recently load posted, replace with 69801G and 69802 bridges
D1 90 9787 I 35 SB Grindstone River Replace 2024  $1,600,000
D6 90 6776 US 61 CP Railroad Replace 2026  $4,580,000
D7 90 9098 US 169 Minnesota River Reoverlay deck surface 2027  $4,700,000
DM 90 9700 US 10 Rum River Replace 2022  $6,200,000
DM 90 27177 MN 55  Franklin Ave Redeck 2022  $400,000
DM 90 27586 US 169 Excelsior Blvd Reoverlay deck surface Not Selected  $2,800,000 Drainage system repair planned
DM 90 27831 I 394 Dunwoody  Blvd Overlay deck surface 2026  $20,200,000
DM 88 27792 I 394 I 94 Reoverlay deck surface 2026  $3,300,000
D3 87 71012 MN 25 Mississippi River Overlay deck surface 2024  $2,400,000
DM 86 19825 I 494 MN 13 Reoverlay deck surface 2023  $2,800,000
D7 84 07011 US 14 Minnesota River Replace Not Selected   $24,300,000 Working to coordinate with Roadway Pavement project
D1 82 69802 US 53 21St Ave Replace 2027  $16,900,000 Bridge was recently load posted, replace with 69801G and 69802 bridges
D1 80 09823 I 35 SB Carlton County Road 61 Redeck 2023  $400,000
D1 80 69818S I 35 SB MN 194  Reoverlay deck surface 2024  $100,000 Received FY 2024 COVID relief funding, mill and overlay with 69818N
D1 80 9493 US 53 SB MN 37 Replace 2025  $1,900,000 Replace with 9494
D1 80 9494 US 53 NB MN 38 Replace 2025  $1,900,000 Replace with 9493
D1 80 69840 MN 194 NB Superior St Overlay deck surface 2026  $800,000 Deck work and steel pier cap redundancy with 69839
D1 80 09815 I 35 SB Moose Horn River Replace Not Selected  $1,800,000 Not a district priority. Will continue to monitor bridge performance
D1 80 09816 I 35 NB Moose Horn River Replace Not Selected  $1,800,000 Not a district priority. Will continue to monitor bridge performance
D1 80 09817 I 35 SB Moose Horn River Replace Not Selected  $1,700,000 Not a district priority. Will continue to monitor bridge performance
D1 80 69121 US 2 St Louis River Overlay deck surface Not Selected  $1,000,000 Not a district priority. Will continue to monitor bridge performance
D1 80 38010 MN 61 Gooseberry River Overlay deck surface Not Selected  $1,400,000 Not a district priority. Will continue to monitor bridge performance
D1 80 36013 US 71 Little Fork River Overlay deck surface Not Selected  $600,000 Not a district priority. Will continue to monitor bridge performance
D2 80 5814 MN 11 Roseau River Overlay deck surface 2024  $200,000 Selected with a higher scoring pavement project
D3 80 5060 MN 210 Mississippi River Reoverlay deck surface 2025  $3,840,000
D3 80 73850 I 94 EB MN238 Overlay deck surface 2027  $750,000 Downscope to Overlay in 2027 tie to 73849 with score of 80
D3 80 6897 I 94 EB Sauk River Overlay deck surface 2026  $600,000 Downscope Reoverlay tie to 73809 with score of 80
D3 80 73849 I 94 WB MN238 Overlay deck surface 2027  $750,000 Downscope to Overlay in 2027 tie to 73850 with score of 80
D3 80 73875 I 94 WB BNSF Railroad Reoverlay deck surface 2022  $900,000 Downscope to reoverlay and abutments tie tie to 73876 with score of 80
D3 80 73876 I 94 EB BNSF Railroad Reoverlay deck surface 2022  $900,000 Downscope to reoverlay and abutments tie to 73875 with a score of 80
D3 80 6896 I 94 EB Sauk River Overlay deck surface 2026  $610,000 Downscope to reoverlay tie to 73805 with a score of 80
D4 80 9697 MN 210 I 94 Replace 2028  $2,500,000 Coordinated with pavement project
D6 80 55029 US 63 Root River Reoverlay deck surface Not Selected  $400,000 Candidate for future bridge repair and overlay project, cost is greater than total available budget
D6 80 9178 I 90 WB 6Th St NE Reoverlay deck surface 2025  $630,000
D6 80 9179 I 90 EB 6Th St NE Reoverlay deck surface 2025  $860,000
D7 80 52001 US 169 SB Robarts Creek Replace 2022  $2,000,000
D7 80 83016 MN 15 NB Wantonwan County Road 9 Overlay deck surface 2023  $400,000
D7 80 07003 MN 60 Blue Earth County Rd 6 Overlay deck surface 2024  $400,000
DM 80 02024 MN 610  East River Road Reoverlay deck surface Not Selected  $300,000
DM 80 02815 I 694 MN 65 Reoverlay deck surface Not Selected  $900,000 On the ground conditions do not match predicted conditions. 
DM 80 6805 MN 280 U of M Transitway Overlay deck surface 2026  $2,600,000
DM 80 19033 US 52  Vermillion River Reoverlay deck surface 2023  $300,000
DM 80 19067 Dakota County Road 32 MN 77 Reoverlay deck surface Not Selected  $1,200,000
DM 80 19075 US 61 Vermillion River Reoverlay deck surface Not Selected  $500,000
DM 80 19812 I 35E NB Dakota County Road 42 Reoverlay deck surface Not Selected  $800,000
DM 80 19816 Cliff Road I 35E Reoverlay deck surface Not Selected  $2,100,000
DM 80 19855 US 52 I 494 Reoverlay deck surface Not Selected  $1,600,000 Repair with pavement project
DM 80 19856 US 52 I 494 Reoverlay deck surface Not Selected  $1,600,000 Repair with pavement project
DM 80 19865 I 494 MN 156 (Concord St) Reoverlay deck surface Not Selected  $1,600,000
DM 80 27053 MN 77  I494 Reoverlay deck surface Not Selected  $300,000
DM 80 27237 MN 55 BNSF/CP Railroad Reoverlay deck surface Not Selected  $900,000 Repair with Blue Line
DM 80 27742 US 169 I 394 Reoverlay deck surface Not Selected  $2,000,000
DM 80 27767 I 494 MN5 Reoverlay deck surface 2023  $2,000,000
DM 80 27859 I 94 CP railroad Overlay deck surface 2024  $1,900,000
DM 80 27909 I 94 EB Shingle Creek Reoverlay deck surface Not Selected  $200,000 (2021) mixed bar slab span; SP 2781-432, 2017 remove and patch slab - quantity 10SF
DM 80 82003 US 61  Jamaica Avenue Reoverlay deck surface Not Selected  $300,000 Future overlay candidate
DM 80 82800 I 94  St Croix River Reoverlay deck surface Not Selected  $12,100,000 WisDOT lead….
DM 80 82849 I 94 MN 95 Reoverlay deck surface Not Selected  $900,000
DM 80 82850 I 94 MN 95 Reoverlay deck surface Not Selected  $1,000,000
DM 80 82856 I 494 Mississippi River Reoverlay deck surface 2024  $3,900,000
DM 80 27770A I 394 Over railroad yard Reoverlay deck surface 2026  $800,000
DM 80 27770B I 394 BNSF/UP Railroad Reoverlay deck surface 2026  $1,200,000
DM 79 27239 MN 610 WB Mississippi River Reoverlay deck surface Not Selected  $2,400,000
D3 75 9022 MN 23 NB US 10 Replace 2023  $1,398,000
D3 75 9021 MN 23 SB US 10 Replace 2023  $1,328,000
D6 75 24808 I 90 EB I 35 Replace Not Selected  $2,890,000 Candidate for future replacement project, cost is greater than total available budget.
D6 75 6483 US 61 Hay Creek Replace 2024  $10,000,000 Selected prior to policy (in 2019-2022 STIP). Coordinated with bridge 6482.
D8 75 34524 Kandiyohi County Road 153 US 12 Reoverlay deck surface Not selected  $1,090,000 City of Willmar owner/responsibility.
DM 75 9717 US 10 BNSF Railroad Replace 2022  $7,400,000 2013 novachip, Scope with Rum River 2024
DM 75 19843 I 35 205th St Replace Not Selected  $2,600,000 Resurfaced in 2013
DM 75 19844 I 35 205th St Replace Not Selected  $2,600,000 Resurfaced in 2013
DM 75 27201 MN 55 Lake St Reoverlay deck surface Not Selected  $3,700,000
DM 75 27879 I 35W 3rd street Redeck Not Selected  $3,700,000
DM 75 27925 I 94 WB Shingle Creek Replace Not Selected  $2,200,000 (2021) slab span mixed bar underside spalling
D1 70 58807 I 35 SB Kettle River Reoverlay deck surface Not Selected  $700,000 Not a district priority. Will continue to monitor bridge performance
D3 70 48011 US 169 SB Rum River Overlay deck surface 2025  $700,000 Tie to 4812 
D3 70 71007 US 169 SB Sherburne County Road 29 Reoverlay deck surface 2025  $700,000 Tie to 71008
D3 70 73855 I 94 WB MN15 Reoverlay deck surface 2025  $900,000 Received new wearing surface in 2016, Review NBI and RSL 
D3 70 73856 I 94 EB MN16 Reoverlay deck surface 2025  $600,000 Received new wearing surface in 2016, Review NBI and RSL 
D3 70 48016 US 169 NB Mille Lacs County Road 29 Reoverlay deck surface 2025  $700,000 Tie to 48015
D3 70 48010 US 169 NB Mille Lacs County Road 31 Reoverlay deck surface 2025  $700,000 tie to 48009
D3 70 71008 US 169 NB Sherburne County Road 29 Reoverlay deck surface 2025  $700,000 Tie to 71007
D3 70 73877 I 94 WB Jade Road Overlay deck surface 2027  $750,000 Tie to 73878 with score of 70
D3 70 73878 I 94 EB Jade Road Overlay deck surface 2027  $750,000 Tie to 73877 with a score of 70
D3 70 73820 I 94 EB Stearns County Road184 Overlay deck surface 2030  $700,000
D3 70 6574 US 10 EB Platte River Overlay deck surface 2027  $750,000
D3 70 5428 US 71 Sauk River Overlay deck surface 2026  $1,000,000 Downscope to overlay 
D6 70 23009 US 52 Root River Overlay deck surface Not Selected  $310,000 Candidate for future deck overlay project, cost is greater than total available budget. 
D6 70 25014 US 61 NB Spring Creek Reoverlay deck surface Not Selected  $270,000 Candidate for future deck overlay project, cost is greater than total available budget. 
D6 70 85844 I 90 EB Winona County Road 7 Reoverlay deck surface Not Selected  $260,000 Candidate for future deck overlay project, cost is greater than total available budget. 
D7 70 83022 MN 15 UP Railroad Reoverlay deck surface 2022  $500,000
D7 70 17006 MN 60 EB UP Railroad Overlay deck surface 2025  $400,000
D7 70 17007 MN 60 WB UP Railroad Overlay deck surface 2025  $400,000
D7 70 53817 I 90 WB MN 59 Overlay deck surface 2026  $300,000
D7 70 53815 I 90 WB Rowe Ave Overlay deck surface 2026  $400,000
D7 70 07029 US 169 S Riverfront Dr Reoverlay deck surface 2027  $700,000
D7 70 83037 MN 60 UP Railroad Overlay deck surface 2028  $300,000
D7 70 07039 US 169 SB Blue Earth River Reoverlay deck surface Not Selected   $500,000 Working to coordinate with Roadway Pavement project
D7 70 07019 US 14 WB Blue Earth County Road 3 Overlay deck surface Not Selected   $300,000 Working to coordinate with Roadway Pavement project
D7 70 07040 US 169 NB Blue Earth River Reoverlay deck surface Not Selected   $400,000 Working to coordinate with Roadway Pavement project
D7 70 07041 US 169 NB US 169 Reoverlay deck surface Not Selected   $400,000 Working to coordinate with Roadway Pavement project
D8 70 5133 MN 19 Redwood River Reoverlay deck surface 2022  $1,210,000
D8 70 12000 US 212 Minnesota River Overlay deck surface 2031  $1,030,000 Overlay after Blatnick
DM 70 02025 MN 610  BNSF Railroad Reoverlay deck surface Not Selected  $300,000
DM 70 02026 MN 610  BNSF Railroad Reoverlay deck surface Not Selected  $300,000
DM 70 02027 MN 610  Coon Rapids Blvd Reoverlay deck surface Not Selected  $500,000
DM 70 02028 MN 610  Coon Rapids Blvd Reoverlay deck surface Not Selected  $400,000
DM 70 4190 MN 55 Minnesota River Reoverlay deck surface 2022  $7,400,000
DM 70 6583 I 35W Cliff Road Replace 2025  $6,600,000
DM 70 9431 MN 100 W 70th St Reoverlay deck surface Not Selected  $1,000,000
DM 70 10022 US 212  Carver County Road 36 Overlay deck surface Not Selected  $700,000 (2019) mill and overlay, joints, roadway CPR work let in FY23
DM 70 19023 MN 55  US 52  Reoverlay deck surface Not Selected  $1,300,000
DM 70 19811 I 35E SB Dakota County Road 42 Reoverlay deck surface Not Selected  $800,000
DM 70 19827 MN 55 I494 Redeck 2022  $9,300,000
DM 70 19891 I 35W SB Southcross Drive Reoverlay deck surface Not Selected  $700,000
DM 70 19892 I 35W NB Southcross Drive Reoverlay deck surface Not Selected  $1,200,000
DM 70 19893 I 35E SB Southcross Drive Reoverlay deck surface Not Selected  $800,000 Repaired in 2013
DM 70 19896 I 494 UP Railroad  Hardman Ave Reoverlay deck surface Not Selected  $1,500,000
DM 70 27044 MN 55 Crow River Reoverlay deck surface Not Selected  $700,000
DM 70 27051 MN 77 American Blvd Reoverlay deck surface Not Selected  $300,000
DM 70 27068 MN 7 Cedar Lake Trail Reoverlay deck surface 2026  $800,000
DM 70 27070 MN 77 NB I494 Reoverlay deck surface Not Selected  $300,000
DM 70 27193 MN 7 Minnehaha Creek Reoverlay deck surface 2026  $400,000
DM 70 27734 I 694 I 94  Reoverlay deck surface Not Selected  $1,400,000
DM 70 27863 I 94 Cedar Ave Overlay deck surface 2024  $1,500,000
DM 70 27891 I 694 MN252 Reoverlay deck surface 2024  $700,000
DM 70 27971 MN 55 I 494 Reoverlay deck surface Not Selected  $2,000,000 Repaired and painted in 2014
DM 70 62817 I 94 EB I 35E Reoverlay deck surface Not Selected  $900,000
D1 69 09009 MN 33 St Louis River Reoverlay deck surface Not Selected  $2,200,000 Not a district priority. Will continue to monitor bridge performance
D1 65 5923 MN 61 Pigeon River Redeck 2023  $500,000  International border bridge in coordination with Canada
D1 65 9788 I 35 NB Grindstone River Replace 2024  $1,600,000  Replacing with 9787, 9789, 9790
D1 65 9789 I 35 SB BNSF Railroad Replace 2024  $1,000,000  Replacing with 9787, 9788, 9790
D1 65 9790 I 35 NB BNSF Railroad Replace 2024  $2,800,000  Replacing with 9787, 9788, 9789
D1 65 9030 I 535 St Louis River Replace 2028  $200,000,000 Selected prior to policy (in 2019-2022 STIP); Replacement planned for 2028
D1 65 09805 I 35 SB MN 45 Replace Not Selected  $2,100,000
D1 65 6602 US 53 NB St Louis River Replace Not Selected  $2,200,000
D1 65 69060 US 169 NB Saint Louis County Road 102 Redeck Not Selected  $900,000
D1 65 6501 I 35 DMIR railyard Replace Not Selected  $5,100,000
D1 65 31012 US 169 NB BNSF Railroad Redeck Not Selected  $900,000
D1 65 69018 US 53 NB Whiteface River Replace Not Selected  $2,000,000
D2 65 9059 MN 11 Warroad River Redeck 2024  $1,000,000 Selected with a higher scoring pavement project
D2 65 60001 US 2 4Th St Nw Replace 2027  $4,700,000
D3 65 86803 MN 25 I 94 Redeck 2026  $2,410,000
D3 65 6778 MN 65 Snake River Replace 2022  $2,675,000
D3 65 73805 I 94 WB Sauk River Redeck 2026  $900,000 Tie to 6896
D3 65 86807 MN 24 I 94 Replace 2027  $5,000,000
D4 65 9027 MN 29 Chippewa River Replace 2023  $2,300,000 Selected prior to policy (in 2019-2022 STIP)
D4 65 9313 US 75 Rabbit River Replace 2023  $2,100,000
D6 65 24837 I 90 WB IM Railroad Redeck 2025  $700,000
D6 65 50804 US 218 NB I 90 Replace 2022  $2,250,000 Selected prior to policy (in 2019-2022 STIP). Coordinated with bridge 50803.
D6 65 55026 US 52 SB 36th Ave SE Redeck Not Selected  $690,000 Candidate for future replacement project, cost is greater than total available budget.
D6 65 6868 I 90 WB Cedar River Replace 2025  $3,200,000
D6 65 6869 I 90 EB Cedar River Replace 2025  $3,200,000 Austin, Prog'd replacement in 2023, over the Cedar River (also 6868)
D6 65 9046 US 61 SB Burns Creek Replace Not Selected  $1,920,000 Candidate for future replacement project, cost is greater than total available budget.
D6 65 9062 US 61 NB Cedar Creek Replace Not Selected  $1,840,000 Candidate for future replacement project, cost is greater than total available budget.
D6 65 9063 US 61 SB Cedar Creek Replace Not Selected  $1,870,000 Candidate for future replacement project, cost is greater than total available budget.
D6 65 9093 US 61 SB Pleasant Valley Creek Replace Not Selected  $2,030,000 Candidate for future replacement project, cost is greater than total available budget.
D6 65 9728 I 90 EB Freeborn County Road 46 Replace Not Selected  $2,800,000 Candidate for future deck overlay project, cost is greater than total available budget. 
D7 65 17001 MN 60 Des Moines River Replace 2025  $5,100,000
D7 65 07018 US 14 EB N Riverfront Dr Replace Not Selected   $2,800,000 Working to coordinate with Roadway Pavement project
D7 65 07017 US 14 WB N Riverfront Dr Replace Not Selected   $2,800,000 Working to coordinate with Roadway Pavement project
D7 65 53819 I 90 WB MN 60 Replace Not Selected   $7,000,000
D7 65 53820 I 90 EB MN 60 Replace Not Selected   $7,200,000
D8 65 42007 MN 23 Three Mile Creek Redeck 2031  $670,000
DM 65 9276 MN 36  Cleveland Avenue Replace 2031  $2,500,000
DM 65 9277 MN 36  Cleveland Avenue Replace 2031  $3,100,000
DM 65 9417 MN 65 NB Coon Creek Replace 2024  $1,200,000
DM 65 9534 I 35E Shepard Rd Replace 2026  $2,700,000
DM 65 9713 US 169 US 10 Replace 2022  $3,700,000
DM 65 19819 MN 55 I 35E Redeck 2022  $7,800,000
DM 65 19859 MN77  I 35E Redeck Not Selected  $4,700,000
DM 65 19860 MN77  I 35E Redeck Not Selected  $3,900,000
DM 65 27022 MN 62 EB MN77  Replace Not Selected  $3,100,000
DM 65 27033 MN 7 US 169 Redeck 2026  $3,500,000
DM 65 27169 MN 55 MN 5  Replace Not Selected  $2,200,000
DM 65 27521 MN 62 28th Ave S Replace Not Selected  $2,900,000
DM 65 27540 US 169 13th Ave N Replace Not Selected  $2,700,000
DM 65 27572 MN 62 Nine Mile Creek Redeck Not Selected  $1,000,000
DM 65 27573 MN 62 Nine Mile Creek Redeck Not Selected  $1,000,000
DM 65 27785 MN 55 I 94 Redeck Not Selected  $3,500,000
DM 65 27849 MN 55  I 35W Redeck 2022  $500,000
DM 65 27875 MN 55 WB I 35W Redeck 2022  $600,000
DM 65 27899 I 35W MC Railyard Replace Not Selected  $8,900,000
DM 65 62029 MN 36 Fairview Avenue Replace 2031  $2,900,000
DM 65 62808 I94 MN280  Replace Not Selected  $4,300,000
DM 65 62812 I94 MN280  Replace Not Selected  $3,000,000
DM 65 62870 US 61 NB US 61 SB on ramp Replace Not Selected  $1,900,000
DM 65 82859 I 494 EB US 61 Reoverlay deck surface Not Selected  $1,300,000
D1 60 69019 US 53 NB Paleface River Replace Not Selected  $1,200,000
D1 60 69103 US 2 East Savanna River Reoverlay deck surface Not Selected  $200,000
D1 60 69860 MN 61 Near Lakewalk trail, north of 26th Ave E Overlay deck surface Not Selected  $100,000
D1 60 58006 MN 23 SCV Railroad Overlay deck surface Not Selected  $300,000
D6 60 28017 US 61 WB Mississippi River Overlay deck surface Not Selected  $290,000 Candidate for future deck overlay project, cost is greater than total available budget. 
D6 60 85017 TH 43 West Burns Valley Creek Overlay deck surface Not Selected  $120,000 Candidate for future deck overlay project, cost is greater than total available budget. 
D7 60 83021 MN 15 MN 6 Overlay deck surface 2022  $600,000
D7 60 53818 I 90 EB MN 59 Overlay deck surface 2026  $300,000
D7 60 53816 I 90 EB Rowe Ave Overlay deck surface 2026  $400,000
D7 60 07022 US 14 EB DME railroad Reoverlay deck surface 2026  $400,000
D8 60 34023 US 12 BNSF Railroad Overlay deck surface 2031  $330,000
DM 60 02041 MN 610  MN 47 Reoverlay deck surface Not Selected  $500,000
DM 60 9110 MN 55  US 52 NB Replace 2031  $3,100,000 Superstructure in poor condition
DM 60 27072 MN 47 BNSF Railroad Reoverlay deck surface Not Selected  $1,800,000
DM 60 27178 MN 55 EB Cedar Ave Replace Not Selected  $3,600,000
DM 60 27234 MN 610 US 169 Reoverlay deck surface Not Selected  $400,000
DM 60 27256 MN 55 UP Railroad Reoverlay deck surface Not Selected  $400,000
DM 60 27258 MN 100 UP Railroad Reoverlay deck surface Not Selected  $900,000
DM 60 82860 I 494  US61 Reoverlay deck surface Not Selected  $1,100,000
DM 60 27V02 US 169  I 94 Reoverlay deck surface Not Selected  $400,000
D4 55 26801 Grant County Road 4 I 94 Replace Not Selected  $3,100,000 SP 2680-44 will be scoped for potential bridge work in FY 2026
D8 55 5939 MN 15 North Fork Crow River Replace 2031  $1,750,000 Replace due to scour
D8 55 59002 MN 23 Judicial Ditch #1 Superstructure repairs 2024  $520,000 Repairs coordinated with roadway project
D8 55 42006 MN 23 Redwood River Redeck 2031  $540,000
DM 55 9780 MN 13  I 35W Replace 2025  $3,200,000 low vertical clearance - bridge hits
D3 50 48012 US 169 NB Rum River Overlay deck surface 2025  $700,000 Tie to 4811 with a score of 50
D4 45 21819 Douglas County Road 17 I 94 Replace 2024  $1,900,000 Coordinated with pavement project
D6 45 24807 I 90 WB I 35 Replace Not Selected  $2,890,000
D6 45 50803 US 218 SB I 90 Replace 2023  $2,800,000 Selected prior to policy (in 2019-2022 STIP). Coordinated with bridge 50804.
D6 45 66811 I 35 SB MN 60 Replace 2023  $4,600,000
D6 45 9045 US 61 NB Burns Creek Replace Not Selected  $1,920,000
D7 45 07037 US 169 Blue Earth River Replace Not Selected   $3,000,000
DM 45 02010 US 10 Main St Replace 2022  $4,000,000
DM 45 6804 US 169 MN 21 Replace Not Selected  $3,800,000 Received new overlay 2015
DM 45 9108 US 52  UP Railroad Replace Not Selected  $1,900,000
DM 45 9538 MN 110 EB I 35E Replace Not Selected  $3,300,000
DM 45 9569 MN 36  I 35W Replace 2031  $9,000,000
DM 45 9675 US 52  Vermillion River Replace 2023  $2,100,000 (2020) Crack sealing project, no major work types taking place in FY 23
DM 45 9716 US 10 7th Avenue Replace 2022  $3,000,000 (2020) Misc repairs, flood seal, reseal poured joints in 2022
DM 45 9779 MN 13  I 35W Replace 2025  $3,200,000 low vertical clearance - bridge hits
DM 45 19807 I 35 Dakota County Road 50 Replace Not Selected  $2,000,000
DM 45 19808 I 35 NB Dakota County Road 51 Replace Not Selected  $2,000,000
DM 45 27021 MN 62 MN 77 Replace Not Selected  $3,100,000
DM 45 27078 MN 62  US 212 Replace Not Selected  $4,300,000
DM 45 27531 US 169 Minnetonka Blvd Replace Not Selected  $3,900,000
DM 45 27848 I 94  I 35W Replace Not Selected  $7,500,000
DM 45 27926 I 694 Shingle Creek Replace Not Selected  $1,300,000
DM 45 62030 MN 36  Fairview Avenue Replace 2031  $3,500,000
DM 45 62844 MN 280  MN 280 NB on ramp Replace Not Selected  $3,000,000 (2020) Joints and crack sealing in FY 26 project.
DM 45 82813 I 694 SB MN 36 Replace Not Selected  $2,400,000
DM 45 82814 I 694 NB MN 36 Replace Not Selected  $2,500,000
D1 40 69879 I 35 NB CP Railroad Replace Not Selected  $38,000,000
D3 40 48015 US 169 SB Mille Lacs County Road 29 Overlay deck surface 2025  $700,000 tie to 48016
D3 40 6870 I 94 EB Sauk River Overlay deck surface 2027  $700,000 Downscope to overlay in 2027 tie to 73811 with a score of 40
DM 36 9321 I 694  Mississippi River Overlay deck surface Not Selected  $3,300,000
D1 35 69009 US 53 SB 6th Ave W Replace Not Selected  $1,600,000
D6 35 24839 I 90 WB Freeborn County Road 12 Redeck 2025  $800,000
D6 35 79009 US 61 SB Zumbro River Preventive maintenance 2022  $250,000
D7 35 83015 MN 15 SB Wantonwan County Road 9 Redeck 2023  $800,000
DM 35 6850 I 494 WB I 35W Replace Not Selected  $3,800,000 (2019) changed to first time period since included in CoC project
D1 30 69818N I 35 NB MN194  Reoverlay deck surface 2024  $100,000 Received FY 2024 COVID relief funding, mill and overlay with 69818S
D3 30 73809 I 94 WB Sauk River Redeck 2026  $900,000 Downscope Redeck tie to 6897
D3 30 05003 MN 15 EB US 10 Redeck/beams/bearings 2027  $1,860,000 Redeck with new beams and bearings in 2027
D3 30 71002 US 169 NB US 10 Replace 2022  $3,100,000
D3 30 73811 I 94 WB Sauk River Redeck 2027  $1,000,000 Downscope to Redeck in 2027 tie to 6780
D3 30 73868 I 94 WB Stearns County Road 75 Overlay deck surface 2023  $600,000
D3 30 48009 US169 Mille Lacs County Road 31 Overlay deck surface 2025  $700,000 tie to 48010
D4 30 6686 MN 9 Mustinka River Replace 2022  $700,000 Selected prior to policy (in 2019-2022 STIP)
D6 30 79002 US 61 NB Whitewater River Redeck 2022  $390,000
D6 30 9092 US 61 NB Pleasant Valley Creek Replace Not Selected  $2,030,000
D7 30 07010 US 14 EB Blue Earth County Road 5 Replace Not Selected   $2,300,000
DM 30 6817 MN65 Coon Creek Replace 2024  $800,000 scope for 2020
DM 30 9500 MN100 MN62 Replace Not Selected  $8,200,000
D1 20 69879A I 35 SB CP Railroad Replace Not Selected  $37,400,000
D1 20 9189 I 35 NB MN 210 Replace Not Selected  $2,800,000
D1 20 38008 MN 61 Crow Creek Redeck Not Selected  $2,500,000
D1 20 09803 I 35 SB BNSF Railroad Replace Not Selected  $2,300,000
D1 20 69852 I 35 Over Superior Hiking Trail Replace Not Selected  $8,700,000
D4 20 84001 MN 55 Bois De Sioux River Replace 2022  $1,330,000 Coordinated with pavement project; end post only
D6 20 24815 I 90 WB East of 225th St near Manchester Township Reoverlay deck surface 2025  $320,000
D6 20 24816 I 90 EB East of 225th St near Manchester Township Reoverlay deck surface Not Selected  $760,000
D6 20 55025 US 52 NB 36th Ave SE Redeck Not Selected  $690,000 Candidate for future re-deck project, cost is greater than available budget.
D6 20 55809 I 90 WB MN 52 Replace 2024  $4,500,000 Selected prior to policy (in 2019-2022 STIP but delayed)
D6 20 55810 I 90 EB MN 52 Replace 2024  $3,700,000 Selected prior to policy (in 2019-2022 STIP but delayed)
D6 20 6482 US 61 West of Withers Harbor Rd in RedWing Replace 2023  $2,000,000 Selected prior to policy (in 2019-2022 STIP). Coordinated with bridge 6483.
D6 20 85815 I 90 WB Winona County Rd 101 Replace Not Selected  $1,540,000 Candidate for future replacement project, cost is greater than total available budget.  Deck overlayed in 2019
D6 20 85817 I 90 WB MN 74 Replace Not Selected  $2,620,000 Candidate for future replacement project, cost is greater than total available budget.  Deck overlayed in 2019
D7 20 07009 US 14 WB Blue Earth County Road 5 Replace Not Selected   $2,300,000
D8 20 43008 US 212 EB Buffalo Creek Replace 2031  $1,710,000
DM 20 27171 MN55 Bloomington Rd Replace Not Selected  $1,500,000
DM 20 27587 US 169 2nd St NE Reoverlay deck surface Not Selected  $500,000
DM 20 27765 I 494 34th Ave S Redeck Not Selected  $4,000,000
DM 20 82001 US 8 2nd St NW Replace Not Selected  $4,500,000
DM 20 82002 US 8 US61 Replace Not Selected  $5,300,000
D1 15 69808 I 535  BNSF Railroad Redeck 2028  $7,300,000 Removed from TPI project, Planned with Blatnik bridge replacement
D1 10 69801G I 535 Superior St Replace 2027  $5,900,000 Temporary connection to Twin Ports Interchange, replace with 69802 bridges
D1 10 69870B I 35 N  North of Harbor Dr Reoverlay deck surface 2031  $500,000 To coordinate with the timing of another MnDOT project, 69870 redeck
D1 10 09801 MN 33 NB I 35 Replace Not Selected  $4,100,000
D4 10 26803 Grant County Road 19 I 94 Overlay deck surface Not Selected  $400,000 SP 2680-44 will be scoped for potential bridge work in FY 2026
D6 10 25008 US 61 Wells Creek Overlay deck surface 2023  $250,000
D6 10 66809 I 35 SB Rice County Rd 93 Replace 2023  $2,500,000
D6 10 66810 I 35 NB Rice County Rd 94 Replace 2023  $2,500,000
D6 10 66815 I 35 SB Rice County Rd 11 Replace 2023  $2,200,000
D6 10 66816 I 35 NB Rice County Rd 12 Replace 2023  $2,200,000
D6 10 79004 US 61 SB Snake Creek; Township Rd Preventive maintenance 2022  $300,000
D6 10 85830 I 90 EB MN 76 Reoverlay deck surface Not Selected  $300,000
D6 10 85842 I 90 EB Winona County Rd 17 Reoverlay deck surface Not Selected  $280,000
D6 10 85843 I 90 WB Winona County Rd 7 Replace Not Selected  $1,590,000
D6 10 85846 I 90 EB Winona County Rd 25 Reoverlay deck surface Not Selected  $260,000
D6 10 9858 I 90 EB Root River Overlay deck surface 2023  $410,000
D7 10 52012 US 169 US 169 Reoverlay deck surface 2027  $500,000
D7 10 32003 MN 60 EB Jack Creek Overlay deck surface 2029  $300,000
D7 10 53002 US 59 North Branch Jack Creek Overlay deck surface 2029  $100,000
D7 10 53001 US 59 Jack Creek Overlay deck surface 2029  $100,000
D7 10 07023 US 14 US 169 Replace Not Selected   $9,200,000
D7 10 07020 US 14 EB Blue Earth County Road 3 Overlay deck surface Not Selected   $300,000
D8 10 43005 US 212 WB Buffalo Creek Replace 2031  $1,710,000
DM 10 6566 US 8 St Croix River Replace Not Selected  $6,500,000
DM 10 6894 MN 280 Energy Park Drive Overlay deck surface 2026  $1,100,000
DM 10 9050 MN 280 Como Ave Replace Not Selected  $3,700,000
DM 10 9352 I 35W  BNSF Railroad Replace Not Selected  $3,500,000
DM 10 9605 US 10 I-35W Replace Not Selected  $4,700,000
DM 10 10021 US 212 Carver County Road 36 Overlay deck surface Not Selected  $700,000 (2019) mill and overlay, joints, roadway CPR work let in FY23
DM 10 19847 I 35 Lake Marion Reoverlay deck surface Not Selected  $100,000
DM 10 19848 I 35 Lake Marion Reoverlay deck surface Not Selected  $100,000
DM 10 27923 I 94 Brooklyn Blvd Replace Not Selected  $3,600,000
DM 10 62847 I 94 Fairview Avenue Replace Not Selected  $5,500,000 2013 novachip, 2020-22 replace
DM 10 82809 I 694 50th St N Replace Not Selected  $1,500,000
DM 10 82811 I 694 Gateway Trail Replace Not Selected  $1,600,000
DM 10 82855 I 494 Mississippi River Reoverlay deck surface 2024  $3,200,000 Replace failing epoxy chip seal
DM 10 02037E US 10 University Ave; MN 610  Reoverlay deck surface Not Selected  $900,000
DM 10 02037W US 10 WB University Ave; MN 610  Reoverlay deck surface Not Selected  $1,000,000
D1 0 69810 I 535 BNSF Railroad Redeck 2028  $2,000,000 Removed from TPI project, Planned with Blatnik bridge replacement
D1 0 69010 US 53 NB 6th Ave W Replace Not Selected  $1,600,000
D1 0 31009 US 169 SB BNSF Railroad Spur Redeck Not Selected  $700,000
D1 0 09804 I 35 NB BNSF Railroad Replace Not Selected  $2,300,000
D1 0 9188 I 35 SB MN 210 Replace Not Selected  $2,800,000
D1 0 31010 US 169 NB BNSF Railroad Spur Redeck Not Selected  $700,000
D2 0 68001 MN 11 Hay Creek Replace Not Selected  $1,600,000 Not a district priority, will continue to monitor bridge condition
D2 0 15001 US2 Clearwater River Redeck 2024  $400,000 Ongoing maintenance concerns
D3 0 01004 US 169 Mississippi River Preventive maintenance 2022  $227,766 End posts , Approaches and joints
D3 0 01006 MN 210 Rice River Preventive maintenance 2022  $246,092 End posts , Approaches and joints
D4 0 21821 MN 27 I 94 Replace 2024  $3,300,000
D4 0 3006 MN 87 US 10 Redeck 2022  $1,300,000 Selected prior to policy (in 2019-2022 STIP)
D4 0 26802 MN 78 I 94 Preventive maintenance Not Selected  $300,000 Guardrail work with SP 2680-44)
D6 0 20001 US 14 WB MN 57 Redeck 2025  $660,000
D6 0 20002 US 14 EB MN 57 Redeck 2025  $660,000
D6 0 55815 I 90 WB Olmsted County Road  10 Replace Not Selected  $2,110,000 Candidate for future replacement project, cost is greater than total available budget.
D6 0 55816 I 90 EB Olmsted County Road 10 Replace Not Selected  $2,110,000
D6 0 66812 I 35 NB MN 60 Replace 2023  $4,600,000
D6 0 66813 I 35 SB Cannon River Replace 2023  $2,000,000
D6 0 66814 I 35 NB Cannon River Replace 2023  $2,000,000
D6 0 66817 I 35 SB MN 21 Replace 2023  $3,800,000
D6 0 66818 I 35 NB MN 21 Replace 2023  $2,800,000
D6 0 79001 US 61 SB Whitewater River Replace 2022  $5,000,000
D6 0 79003 US 61 SB E Indian Creek Preventive maintenance 2022  $190,000
D6 0 79010 US 61 NB Zumbro River Preventive maintenance 2022  $250,000
D6 0 79016 US 61 NB Snake Creek Preventive maintenance 2022  $130,000
D6 0 9449 US 61 E 5Th St Replace Not Selected  $3,330,000
D7 0 83017 MN 15 SB Watonwan River Replace 2023  $3,500,000
D7 0 83018 MN 15 NB Watonwan River Replace 2023  $3,500,000
D7 0 07036 MN 22 DME railroad Overlay deck surface 2024  $500,000
D7 0 22816 I 90 EB Blue Earth River Reoverlay deck surface 2025  $300,000
D7 0 22815 I 90 WB Blue Earth River Reoverlay deck surface 2025  $300,000
D7 0 07026 US 14 EB MN 22 Reoverlay deck surface 2026  $300,000
D7 0 07025 US 14 WB MN 22 Overlay deck surface 2026  $300,000
D7 0 07021 US 14 WB DME railroad Overlay deck surface 2026  $400,000
D7 0 53005 MN 60 EB DME railroad Overlay deck surface 2029  $300,000
D7 0 32006 MN 60 WB Jack Creek Overlay deck surface 2029  $100,000
D7 0 32004 MN 60 EB Judicial Ditch # 76 near Brewster Overlay deck surface 2029  $200,000
D7 0 32005 MN 60 WB Judicial Ditch # 76 near Brewster Overlay deck surface 2029  $200,000
D7 0 53006 MN 60 WB Elk Creek Overlay deck surface 2029  $200,000
D7 0 07015 US 14 WB UP Railroad Reoverlay deck surface Not Selected   $400,000
D7 0 07016 US 14 EB UP Railroad Reoverlay deck surface Not Selected   $400,000
DM 0 27982 MN 100 NB I 94  Redeck 2031  $2,000,000 Mixed bar deck, delamination over I94, joints in poor condition
DM 0 6803 US 169 UP RR Replace Not Selected  $3,400,000
DM 0 6851 I 494 EB I 35W Replace Not Selected  $3,800,000 (2019) changed to first time period since included in CoC project
DM 0 9081 MN 77 SB I 494 Replace Not Selected  $1,900,000
DM 0 9109 US 52 UP Railroad Replace Not Selected  $1,800,000
DM 0 9521 I 35E Victoria Street  Replace Not Selected  $3,800,000
DM 0 9893 I 94 Franklin Terrace Replace Not Selected  $5,500,000
DM 0 10012 MN 41 Minnesota River Preventive maintenance 2022  $1,200,000 Chip seal
DM 0 27545 MN 62 Shady Oak Rd Replace Not Selected  $1,900,000
DM 0 27805 I 94 WB MN 252 SB Replace 2024  $2,700,000 Coordinated with pavement project
DM 0 27906 I494  I-94 Replace Not Selected  $3,400,000
DM 0 27907 I 494 I 94 Replace Not Selected  $3,100,000
DM 0 62851 I 694 US 61 Replace Not Selected  $3,100,000
DM 0 82812 I 694 NB Gateway Trail Replace Not Selected  $1,600,000
DM 0 27V43 I 94 Hennepin County Road 81 Reoverlay deck surface 2022  $800,000
DM 0 27V44 I 94  Hennepin County Road 81 Reoverlay deck surface 2022  $700,000