Minnesota Department of Transportation

511 Travel Info

Project selection

Increasing the transparency of how we select highway construction projects

Specialty and competitive programs

Highway Safety Improvement Program

Minneapolis-St. Paul Metropolitan area reactive projects

Scoring criteria for reactive safety projects in the Highway Safety Improvement Program in the Minneapolis-St. Paul metropolitan area. Out of 1,000 possible points, 750 points are based on the expected impact of the project and 250 are based on alignment with program goals.

The Highway Safety Improvement Program (HSIP) funds cost effective construction projects that reduce fatalities and serious injuries on all public roads, including reactive projects that address a sustained crash location. In the Twin Cities Metropolitan Area, MnDOT administers HSIP, but the process and selection decisions are made by the Metropolitan Council and its Transportation Advisory Board.

Projects are solicited every other year at the same time as the Metropolitan Council’s regional solicitation. The majority (60 percent) of HSIP funding goes to local roads.

What’s been selected?

Related links

How the projects scored

Below are the results of the latest round of HSIP reactive projects approved by the Transportation Advisory Board in January 2019. View more detailed scores (Excel)

Last updated April 2021

Score Applicant Roadway Description Amount Requested Amount Awarded Year
963 Fridley MN 47
(University Ave)
Enhanced lighting at pedestrian crossings, lighting at bus stops, concrete sidewalk at bus stop NE corner at Osborne Rd $1,947,240 $1,947,240 2024
788 Ramsey County University Ave Install Rectangular Rapid Flashing Beacons, Advanced Pedestrian Signals, reconstruct ped ramps $504,000 $504,000 2022
621 Hennepin County CSAH 52
(Hennepin Ave)
Modifying intersections, reduce conflicting vehicle and pedestrian speeds, traffic signal mods, ADA upgrades $1,368,000 $1,368,000 2024
588 Minneapolis 3 locations Rebuild signals, add overhead mast arms, pedestrian countdown timers, Advanced Pedestrian Signals, yellow reflective back plates, upgrade 8" to 12" signal heads, convert to LED lighting, video detection, curb ramps, curb extensions $1,080,000 $1,080,000 2022
568 Minneapolis LaSalle Ave & Nicollet Ave Rebuild signals, add OH mast arms, ped count down timers, Advanced pedestrian signals, yellow reflective back plates, upgrade 8" to 12" signal heads, convert to LED lighting, video detection, curb ramps, curb extensions $1,800,000 $1,800,000 2024
510 Scott County CSAH 78 Construct roundabout $1,595,700 $- 2024
491 Minneapolis Lyndale Ave Rebuild signals, add overhead mast arms, ped count down timers, Advanced pedestrian signals, yellow reflective back plates, upgrade 8" to 12" signal heads, convert to LED lighting, video detection, curb ramps, curb extensions $1,260,000 $1,260,000 2025
480 Dakota County County Road  6 (Thompson Ave) Construct roundabout $1,395,000 $1,395,000 2023
476 Anoka County CSAH 22
(Viking Blvd)
Construct roundabout $1,350,000 $1,350,000 2025
440 Minneapolis Broadway Street Rebuild signals, add overhead mast arms, pedestrian countdown timers, Advanced pedestrian signals, yellow reflective back plates, upgrade 8" to 12" signal heads, convert to LED lighting, video detection, curb ramps, curb extensions $1,170,000 $1,170,000 2023
405 MnDOT I-35W Install continuous lighting $720,000 $720,000 2024
394 Ramsey County Dale Street Construct 4 lane to 3 lane conversion $2,000,000 $2,000,000 2024
391 Woodbury Lake Road Reconstruct from 4 lane to 3 lane conversion $1,620,000 $1,620,000 2024
356 MnDOT I-494 Install continuous lighting $1,710,000 $-   Not selected
346 Anoka County CSAH 34
(Birch Street)
Construct roundabout $1,170,000 $-   Not selected
338 Anoka County CSAH 52
(Radisson Road)
Construct a Traffic Signal, widen side street approaches to develop two lanes of approach. $540,000 $-   Not selected
314 Shakopee Marystown Road Construct 4 roundabouts and install ped/bike shared use paths and sidewalks $2,000,000 $-   Not selected
306 Anoka County CSAH 6 (Mississippi St) Construct 4 to 3 lane conversion with mini roundabout at
CSAH 35 (Old Central Ave)
$954,000 $-   Not selected
300 Anoka County CSAH 22
(Viking Blvd)
Construct roundabout $1,440,000 $-   Not selected
298 Anoka County CSAH 6
(Mississippi St)
Construct 4 to 3 lane conversion with mini roundabouts at
7th St and Monroe intersections
$1,922,400 $-   Not selected
291 Woodbury Lake Road Reconstruct from 4 lane to 3 lane conversion $2,000,000 $-   Not selected
280 Anoka County CSAH 34
(Birch Street)
Construct roundabout $1,440,000 $-   Not selected
268 Anoka County CSAH 9
(Lake George Blvd)
Construct roundabout $1,350,000 $-   Not selected
257 Anoka County CSAH 22
(Viking Blvd)
Construct roundabout $1,440,000 $-   Not selected
250 St. Paul 4 locations Replace signals, full mast arms, ADA, red light confirmation, ped count down timers, ped ramp improvements $1,296,000 $-   Not selected