Minnesota Department of Transportation

511 Travel Info

Special Provisions

Please read our disclaimer before downloading any files.

Special Provisions for all trunk highway construction projects

Special Provisions 2020 Boiler Plates

Special Provisions Boiler Plates are used to prepare the Division S for trunk highways. The proposal order indicates the make-up of the complete bidding proposal. Please see Proposal Sequence below for links to other boilerplate divisions.

Special Provisions 2018 Boiler Plates

Proposal sequence

The proposal order indicates the make-up of the complete bidding proposal. Click on the selected title to view the PDF or follow the link.

Sequence Title When Used
1 Title Sheet (No standard file - project specific) All
2 To the Commissioner of Transportation (PDF) All
3 Notice to all Bidders – Bid Rigging (PDF) Federal
4 Suspension/Debarment Notice (PDF) All
5 Index Division A & Division S (No standard file - project specific) All
6 Index to other Divisions (No standard file - project specific) If required
7 MnDOT Federal-Aid Contract Division A: Coverage of Prevailing Wage Law Under Minnesota Statutes (PDF) Federal
8 Notice to Bidders Traffic Control Prevail Wage (PDF) Federal
9 Federal Wage Rates Federal
10 MnDOT State Funded, Division A, Coverage of Prevailing Wage Law Under Minnesota Statutes (PDF) State
11 State Wage Rates All
12 Certification of Truck Rental Rates (PDF) All
13 Notice to Bidders: Work Under the Contract (PDF) All
14 Division S (No standard file - project specific) All
N/A Division SB (No standard file - project specific) If required
N/A Division SL (No standard file - project specific) If required
N/A Division SS (No standard file - project specific) If required
N/A Division ST (No standard file - project specific) If required
N/A Division SZ (No standard file - project specific) If required
15 8 ½ X 11" Construction Plan (No standard file - project specific) If required
16 (1803) Project Schedules All
17 (1910) Fuel Escalation Clause (PDF) All
18 Conversion Table for MnDOT Rolled Erosion Prevention Products If required
19 Blanding's Turtles Fact Sheet (PDF) Use only with SP2018 if required
20 Blanding's Turtle Flyer (PDF) Use only with SP2018 if required
21 Asbestos & Regulated Waste Assessment Summary (No standard file - project specific) If required
22 Notification Form for Disposal of Bridge Steel (PDF) If required
23 Asbestos and Regulated Waste Inspection/Assessment Report for Bridge No. ______ If required
24 Demolition Debris Recycling Form If required
25 Schedule of Materials Control All
26 Disadvantaged Business Enterprise / DBE Special Provisions (PDF) Federal
27 TGB and Vet-Owned Small Business Special Provisions (PDF) State
28 EEO Special Provisions (PDF) All
29 Abbreviations of Schedule of Prices (PDF) All
30 Stipulation for Foreign Iron or Steel Materials (PDF) Federal
31 Schedule of Prices (No standard file - project specific) All
32 Bid Bond Form (PDF) All