Future projects
Construct 2022
Inglewood Dr. project
City of Baxter to improve access to Inglewood Dr. and Knollwood Dr. on Hwy 210.
Project summary
- Install a signalized intersection at Inglewood Dr.
- Remove the signalized intersection at Knollwood Dr. and replace with a right-in and right-out access
- Resurface Foley Rd. along Hwy 210
- Update area city sanitary sewer, watermain and storm sewer
- Add boulevard between trail and roadway
- Construct railroad crossing and road connections
- Improve to/from access on Hwy 210