MnDOT Metro District

Scoring criteria for national highway system pavement projects. Out of 100 possible points, 60 points are based on the timing of the improvement, 10 points are based on traffic volume, 10 points are based on truck volume, 10 points are based on other infrastructure needs, 5 points are based on network designation, and 5 points are based on the miles covered by the project.

Learn more about how MnDOT evaluates and selects pavement projects

MnDOT scores stretches of highway based on a pavement need when selecting projects to include in the 10-year Capital Highway Investment Plan. Pavement needs on the National Highway System (NHS) are scored and selected separately from pavement needs off the system. MnDOT’s approach to managing pavements follows the guidance and targets in the Transportation Asset Management Plan and the planned outcomes in MnSHIP.

Pavement projects are scored and selected within each district. Potential pavement projects are identified by the Highway Pavement Management Application (HPMA) and by MnDOT District staff.

Once selected, MnDOT then identifies and evaluates alternatives and other needs, legal requirements, issues and opportunities in coordination with local partners, and considers public input. In the process, non-pavement work may be added to a pavement project or a pavement project may be combined with a nearby bridge project. The department follows a context-sensitive complete streets approach, which considers the needs of all users. The final project may address a substantial number of needs beyond the pavement need that precipitated the project. Projects may move years based on local coordination, project delivery, timing of other nearby construction projects, and funding shifts.

What's been selected

Related links

How the projects scored

The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed. View more detailed scores (Excel).

Last updated October 2021

Score Route Description  High level construction cost estimate for planning purposes  Year Planned (FY) Comments
95 I94 Medium mill and overlay from Nicollet Ave Bridge to Western Ave $53,300,000 2031 Projected poor pavement conditions.
95 I494 Minor rehabilitation from France Ave to US12 $24,900,000 2029 Preventive maintenance.
94 I35E Unbonded overlay from I35W/E to Lone Oak Rd $83,500,000 2031 Projected poor pavement conditions. SP1982-207
94 I694 Minor rehabilitation from Washington County Road 49 to US61 $12,000,000 2031 Repair early distresses.
93 I35E Medium mill and overlay from Lone Oak Rd to Bridge over Marie Ave  $21,200,000 2028 Projected poor pavement conditions.
91 US169 Medium mill and overlay from MN55 to 77th Ave $7,800,000 Not Selected  Program limited by available funding.
91 I494 Major rehabilitation from Minnesota River Bridge to 24th Ave  $12,800,000 2023 Poor pavement conditions. Coordinate with 494 Corridors of Commerce project. SP 2785-433.
91 US52 Medium mill and overlay from I-494 to Lafayette bridge $5,100,000 Not Selected  Program limited by available funding.
90 I94 Medium mill and overlay from I-494 to Nicollet Ave bridge $27,400,000 Not Selected  RQI does not reflect on the ground conditions
90 I494 Medium mill and overlay from 24th Ave to France Ave $29,400,000 2027 Poor pavement conditions. Coordinate with 494 Corridors of Commerce project. 1785-424
90 I35E Minor rehabilitation from Little Canada Road to Ramsey County Road E bridge  $12,000,000 2031 Repair early distresses.
90 I35W Medium mill and overlay from MN13 to 106th St $4,000,000 Not Selected  Construction of I-35W River Crossing at time of DIV run, bypass pavement is rough.
90 I35W Medium mill and overlay from 4th St bridge to Ramsey County Road C $8,000,000 Not Selected  RQI does not reflect on the ground conditions
88 I94 Major rehabilitation from Western Ave to Mounds Blvd $28,500,000 2022 Very bad pavement condition; extra maintenance required. SP 6283-247.
88 I494 Medium mill and overlay from 5th Ave to Dakota/Hennepin County Line $13,600,000 Not Selected  RQI does not reflect on the ground conditions
88 I394 Medium mill and overlay from MN100 to Washington Ave N $3,200,000 Not Selected  Recent major rehab. Low RQI attributed largely to high percentage of bridge decks. Also, after a recent lane reconfiguration of WB, part of the outside lane is on rough bituminous shoulder.
86 I394 Thin mill and overlay from I-494 to MN100 $26,800,000 2029 Projected poor pavement conditions.
85 I494 Medium mill and overlay from Hardman bridge to 5th Ave $2,200,000 Not Selected  RQI does not reflect on the ground conditions
85 I35E Major rehabilitation from 10th St Bridge to University ave Bridge $1,100,000 2022 Poor pavement conditions. SP 6283-247.
85 I35W Medium mill and overlay from 27th St to Washington Ave Bridge  $8,300,000 2029 Projected poor pavement conditions.
83 I94 Unbonded concrete overlay from Ramsey/Washington County Line to west end of St Croix River bridge $117,800,000 2023 Poor pavement conditions. SP 8282-132.
83 US169 Medium mill and overlay from MN 62 to MN55 $6,300,000 Not Selected  Program limited by available funding.
83 I35W Minor rehabilitation from 66th St to 42nd St bridge $5,700,000 2031 Repair early distresses.
83 I694 Medium mill and overlay from I-494/694 to Lexington Ave $2,900,000 Not Selected  This segment consists of older concrete pavement with recent CPR and fairly new UBOLs. 2020 RQI is very good to excellent. Minor CPR is ongoing due to dowel bar issues.
82 MN55 Thick mill and overlay from Fernbrook to General Mills Blvd $10,200,000 2024 Poor pavement conditions. SP 2723-144.
81 MN7 Medium mill and overlay from Six mile creek to Division St $5,800,000 Not Selected  Program limited by available funding. Recent resurfacing project. Construction in progress at time of DIV run. Roughness at intersection contribute to poor ride.
81 I494 Medium mill and overlay from Tamarack bridge to Hardman bridge $6,100,000 Not Selected  RQI does not reflect on the ground conditions
81 I35W Medium mill and overlay from Washington Ave bridge to 4th St Bridge $1,600,000 Not Selected  This is new pavement but is predominantly comprised of St. Anthony Falls bridge deck. 2020 RQI is excellent.
79 I35E Unbonded overlay from I35W/E to Lone Oak Rd $76,700,000 2030 Projected poor pavement conditions. SP1982-207
79 US10 Thin mill and overlay from MN65 to I35W $9,600,000 2027 Poor pavement conditions; bad longitudinal joints.
78 MN7 Medium mill and overlay from Shady Oak Rd to Texas Ave $3,000,000 Not Selected  RQI does not reflect on the ground conditions
78 MN65 Thin mill and overlay from Bunker Lake Rd to 217th Ave $5,100,000 2024 Poor pavement conditions. SP 0208-165.
78 US169 Medium mill and overlay and CPR from MN 21 to 173rd St W $12,600,000 2024 Poor pavement conditions. SP 7009-085.
78 I35W Medium mill and overlay from 42nd st bridge to Chicago Ave Bridge $6,500,000 Not Selected  Construction of Lake St project at time of DIV run, bypass pavement is rough.
77 US61 Medium mill and overlay from Carver Ave to I-94 $23,100,000 2030 Poor pavement conditions.
77 MN610   $2,300,000 Not Selected  Program limited by available funding.
77 I35 Medium mill and overlay from US 8 to MN95 $15,700,000 Not Selected  Program limited by available funding. Proposed thin overlay within next few years.
76 US169 Medium mill and overlay from 77th Ave to 93rd Ave in Osseo $5,600,000 2028 Poor pavement conditions.
76 MN610 Medium mill and overlay from MN252 to Mississippi River Bridge  $1,000,000 Not Selected  Program limited by available funding.
76 US52 Medium mill and overlay from Lafayette bridge to I-94 $200,000 Not Selected  Program limited by available funding.
76 US10 Medium mill and overlay from Foley Blvd to MN56 $4,100,000 Not Selected  RQI does not reflect on the ground conditions
76 MN100 Medium mill and overlay from Cedar Lake Bridge to I-894  $31,900,000 2027 Poor pavement conditions; preventive maintenance. SP 2735-212
76 MN100 Medium mill and overlay from I-494 to Cedar Lake Bridge $10,900,000 Not Selected  RQI does not reflect on the ground conditions. 
75 MN65 Medium mill and overlay from Anoka County Road 10 to Bunker Lake blvd $5,400,000 2024 Poor pavement conditions. SP 0207-110.
75 I35E Medium mill and overlay from University Ave to Cayuga/Railroad Bridge $2,100,000 Not Selected  Program limited by available funding. Section is predominantly bridge decks.
74 MN62 Medium mill and overlay from Tracy ave bridge to Penn Ave Bridge $3,200,000 Not Selected  Program limited by available funding.
74 US10 Whitetop overlay from US169/MN47 to Creek Meadows bridge $21,600,000 2030 Projected poor pavement conditions.
74 MN25 Medium mill and overlay from MN5 to MN7 $3,900,000 Not Selected  Program limited by available funding.
74 MN13 Medium mill and overlay from MN13 to Dakota Ave $700,000 Not Selected  Program limited by available funding.
73 MN7 Medium mill and overlay from Texas Ave to Railroad Bridge  $700,000 Not Selected  RQI does not reflect on the ground conditions
73 MN62 Medium mill and overlay from 43rd Ave to Mendota Bridge $1,600,000 Not Selected  Program limited by available funding.
73 MN65 Minor rehabilitation from 217th Ave to Anoka/Isanti County line $4,900,000 2029 Repair early distresses.
73 US212 Minor rehabilitation from Hennepin County Road 4 to I-494 $13,200,000 2027 Preventive maintenance.
73 MN55 Medium mill and overlay from Mendota Bridge to Argenta Trail $11,600,000 2022 Poor pavement conditions. SP 1909-099.
73 US52 Medium mill and overlay from Dakota County Road 42 to Clayton Ave $800,000 Not Selected  Program limited by available funding.
73 US10 Medium mill and overlay from Cleveland RT/Jarvis LT to Fairoak Ave $14,800,000 2027 Poor pavement conditions.
73 I694 Medium mill and overlay from County Road 10 to Anoka Isanti County Line $1,000,000 Not Selected  Under construction at time of DIV run. New concrete pavement at system interchange (94/494/694).
72 US61 Medium mill and overlay from US 10 to 70th St $8,500,000 Not Selected  Program limited by available funding.
72 US169 Medium mill and overlay from Catrerbury rd to Valley View Rd $8,600,000 Not Selected  Program limited by available funding.
72 US169 Medium mill and overlay from Anderson Lakes Pkwy to Valley View Rd $1,500,000 Not Selected  Program limited by available funding.
72 MN610   $1,500,000 Not Selected  Program limited by available funding.
72 I35E Thin mill and overlay from bridge 9532 to 10th St bridge $5,700,000 2028 Projected poor pavement conditions.
72 MN55 Medium mill and overlay from Wright/Hennepin County Line to Fernbrook $21,500,000 2027 Poor pavement conditions.
72 MN280 Major rehabilitation from I-94 to Como Ave $10,800,000 2026 Poor pavement conditions; coordinate with bridge work. 6242-083
72 MN13 Medium mill and overlay from Dakota to Washburn ave $1,600,000 Not Selected  Program limited by available funding.
71 MN7 Medium mill and overlay from MN25 to Six mile Creek $9,400,000 2030 Projected poor pavement conditions.
71 US10 Medium mill and overlay from east of 114th Ave NW to east Foley Blvd $2,200,000 Not Selected  RQI does not reflect on the ground conditions
70 US12 Medium mill and overlay from County Road 90 to eastern Independence City limits $400,000 Not Selected  Program limited by available funding.
70 MN610 Minor rehabilitation from US169 to Braun bridge $29,800,000 2031 Projected poor pavement conditions.
70 I35W Medium mill and overlay from 76th St to 66th ST $1,800,000 Not Selected  Program limited by available funding.
70 MN101 Minor rehabilitation from Wright County Road 38 to US10 $5,300,000 2031 Poor pavement conditions. 8608-33
69 US212 Medium mill and overlay from MN5 to Tacoma Ave $3,500,000 Not Selected  Program limited by available funding.
69 MN316 Medium mill and overlay from Southern to northern limits $7,600,000 2025 Poor pavement conditions. SP 1926-023.
69 MN55 Major rehabilitation from Dakota County Road 63 to US52 $5,900,000 2028 Poor pavement conditions.
69 US52 Medium mill and overlay from Goodhue/Dakota County Line to County Road 86 $2,300,000 Not Selected  Program limited by available funding.
69 MN252 Medium mill and overlay from 85th to MN610 $1,100,000 Not Selected  Program limited by available funding.
68 MN62 Minor rehabilitation from Penn ave bridge to Portland Ave bridge $11,000,000 2031 Repair early distresses.
68 MN65 Medium mill and overlay from 26th St to 10th ST $1,300,000 Not Selected  Program limited by available funding.
68 US169 Medium mill and overlay from Elm creek Blvd to Mississippi River Bridge $500,000 Not Selected  Program limited by available funding.
68 US212 Medium mill and overlay from 2.2 miles east of MN284 to 4 lane section $2,200,000 Not Selected  Program limited by available funding.
68 MN101 Medium mill and overlay from NB split with US169 to SB merge with US169  $3,400,000 Not Selected  Program limited by available funding.
67 US12 Medium mill and overlay from Wright/Hennepin County line to Hennepin County Road 90 $7,600,000 2029 Poor pavement conditions.
67 MN7 Medium mill and overlay from Railroad bridge to MN100 $900,000 Not Selected  Program limited by available funding.
67 MN41 Medium mill and overlay from Carver County Road 61 to Pioneer Trail $12,800,000 2027 Poor pavement conditions.
67 MN41 Medium mill and overlay from US169 to Pioneer Trail $1,200,000 Not Selected  Program limited by available funding.
67 US212 Minor rehabilitation from MN 41 to Hennepin County Road 4 $10,700,000 2028 Preventive maintenance.
66 MN7 Medium mill and overlay from I-494 to Shady Oak Road $1,000,000 Not Selected  Program limited by available funding.
66 MN36 Medium mill and overlay from I35W to east of Edgerton St $9,500,000 2025 Poor pavement conditions; maintenance liability. SP 6212-192.
66 MN41 Reconstruction from Minnesota River to Carver County Road 61 $800,000 2022 MnDOT contribution to locally led reconstruction in Chaska. SP 1008-087.
66 US212 Meduim mill and overlay from MN5 to .4 miles east of MN5 $400,000 Not Selected  Program limited by available funding.
66 I35E Medium mill and overlay from 76th St to 66th ST $900,000 Not Selected  Program limited by available funding.
66 MN252 Thin mill and overlay from I-94 to 85th Ave $11,800,000 2029 Poor pavement conditions. Coordination with 252 CoC project.
66 MN13 Medium mill and overlay from .4 miles west of Dakota Ave to .2 miles east of Dakota ave $700,000 Not Selected  Program limited by available funding.
65 US8 Medium mill and overlay from Tern Ave roundabout to Minnesota/Wisconsin State line $1,900,000 Not Selected  Program limited by available funding.
65 MN62 Medium mill and overlay from I-494 to Clearwater Dr $300,000 Not Selected  Program limited by available funding.
65 US169 Medium mill and overlay from MN282 to MN21 $1,400,000 Not Selected  Program limited by available funding.
65 MN55 Medium mill and overlay from Railroad overpass to Lyndale Ave $6,700,000 2026 Poor pavement conditions. Frontage road and ADA needs. SP 2751-059
65 MN13 Medium mill and overlay from Dakota County Line to Washburn Ave $700,000 Not Selected  Program limited by available funding.
64 US12 Medium mill and overlay from Hennepin County Road 29 to Wayzata Blvd exit $3,000,000 Not Selected  Program limited by available funding.
63 MN41 Medium mill and overlay from Hundermark to Pioneer Trail $300,000 Not Selected  Program limited by available funding.
63 US61 Medium mill and overlay from 70th St to Carver Ave $4,400,000 Not Selected  Program limited by available funding.
63 MN62  Medium mill and overlay from Portland Ave to 28th ave $1,800,000 Not Selected  Program limited by available funding.
63 US212 Medium mill and overlay from Tacoma Ave to Carver County Road 36 $2,700,000 Not Selected  Program limited by available funding.
62 US8 Unbonded overlay from Wyoming Ave to Tern Ave roundabout $32,200,000 2030 Poor pavement conditions.
62 MN62 Medium mill and overlay from Clearwater to Tracy Ave $3,300,000 Not Selected  Program limited by available funding.
62 MN65 Medium mill and overlay from 53rd Ave N to Moore Lk Dr $3,900,000 2027 Poor pavement conditions.
62 MN55 Medium mill and overlay and ADA work from MN100 to Railroad overpass $3,400,000 2025 Poor pavement conditions. SP 2752-043.
62 MN55 Medium mill and overlay from Pine Bend Trail to Hastings CL $3,500,000 Not Selected  Program limited by available funding.
61 US12 Medium mill and overlay from Railroad bridge to 7th St $300,000 Not Selected  Program limited by available funding.
61 MN7 Minor CPR from Kings Dr to I-494 $800,000 2030 Poor pavement conditions.
61 MN62 Medium mill and overlay from Portland Ave bridge to .154 miles east of Portland bridge $200,000 Not Selected  Program limited by available funding.
61 US212 Unbonded concrete overlay from I-494 to MN62 $26,200,000 2028 Poor pavement conditions.
60 MN77 Medium mill and overlay from Minnesota River bridge to I-494 $3,100,000 Not Selected  Program limited by available funding.
60 US212 Medium mill and overlay from Chaska Creek to MN41 $1,700,000 Not Selected  Program limited by available funding.
60 I694 Medium overlay from Dupont Ave to I-35W $57,600,000 2030 Projected poor pavement conditions.
59 MN36 Medium mill and overlay from Washington Ave to MN95  $1,800,000 Not Selected  Program limited by available funding.
59 US61 Medium mill and overlay from 3rd St Railroad crossing to US10 $4,200,000 2029 Poor pavement conditions.
59 US169 Medium mill and overlay from .1 miles north of Ash St to 1.2 miles north of Ash St $1,300,000 Not Selected  Program limited by available funding.
59 I35W Medium mill and overlay from County Road C to Sunset Ave $15,100,000 Not Selected  Program limited by available funding.
59 US10 Medium mill and overlay from Fairoak Ave to US169/MN47 $900,000 Not Selected  Program limited by available funding.
59 MN252 Medium mill and overlay from I-94 WB in Brooklyn Center to .4 miles north of I-94 $500,000 Not Selected  Program limited by available funding.
58 US169 Medium mill and overlay from 4.5 miles north of MN19 to 5.7 miles north of MN19 $1,100,000 Not Selected  Program limited by available funding.
58 US169 Medium mill and overlay from Elm Creek Blvd to US10 $1,400,000 Not Selected  Program limited by available funding.
58 US212 Medium mill and overlay from 4 lane section to Chaska Creek $2,700,000 Not Selected  Program limited by available funding.
57 MN62 Medium mill and overlay from Mendota bridge to I-35E $6,700,000 2024 Poor pavement conditions. SP 1918-119.
57 US169 Medium mill and overlay from LeSueur/Scott County line to MN19 $400,000 Not Selected  Program limited by available funding.
57 MN55 Medium mill and overlay from US52 to US61 $26,000,000 2028 Poor pavement conditions.
56 MN610 Medium mill and overlay from I-94 to Elm Creek Blvd $2,400,000 Not Selected  Program limited by available funding.
55 MN62 Medium mill and overlay from Clearwater Dr to .32 miles east of Clearwater $400,000 Not Selected  Program limited by available funding.
55 I694 Medium mill and overlay from Lexington Ave to MN49 $4,600,000 Not Selected  Program limited by available funding.
55 MN121 Medium mill and overlay from I35W to Pedestrian bridge $300,000 Not Selected  Program limited by available funding.
54 US212 Medium mill and overlay from .1 miles south of MN62 to MN62 $1,000,000 Not Selected  Program limited by available funding.
54 I494 Medium mill and overlay from US12 to I-94 $12,800,000 Not Selected  Program limited by available funding.
53 MN62 Reconstruction from 28th Ave S to 43rd Ave $12,300,000 2027 Poor pavement conditions.
51 US52 Unbonded concrete overlay from Clayton to I-494 $43,300,000 2028 Poor pavement conditions.
50 I35W Unbonded concrete overlay from I35W/I35E to Cliff Rd exit $72,300,000 2025 Mobility needs; bridge replacement coordination. SP 1981-140.
50 I35 Medium mill and overlay from Scott County road 2 to MN50 $6,400,000 Not Selected  Program limited by available funding.
49 I35W Medium mill and overlay from 90th St to 76th St $1,000,000 2024 Poor pavement conditions. Coordinate with 494 CoC project. SP 2785-424.
46 MN36 Medium mill and overlay from east of Edgerton St to Washington Ave $8,900,000 2022 Poor pavement conditions; maintenance liability. SP 8204-077.
46 MN101 Reclaim NB lanes & medium mill and overlay SB lanes from I-94 to Wright County Road 38 $10,900,000 2026 Poor pavement conditions. 2738-031
45 US169 Thin mill and overlay from Minnesota River Bridge to Anderson Lake Blvd $10,300,000 2028 Poor pavement conditions. 2776-112
45 I35 Medium mill and overlay from MN95 to Chisago County Road 9 $6,700,000 Not Selected  Program limited by available funding.
44 US52 Unbonded overlay from Dakota County Road 86 to Dakota County Road 42 $66,100,000 2023 Poor pavement conditions. SP 1906-071.
43 I94 Medium mill and overlay from Mounds Blvd to Ramsey/Washington County line $6,800,000 Not Selected  Program limited by available funding.
43 MN5 Medium mill and overlay from I-494 to Hennepin/Ramsey County line $3,900,000 Not Selected  Program limited by available funding.
40 US8 Medium mill and overlay from I-35 to Wyoming Ave $12,100,000 2025 Coordination with County safety improvements. Poor pavement conditions. SP 1308-027.
40 MN13 Medium mill and overlay from Washburn Ave to I-35 $1,400,000 Not Selected  Program limited by available funding.
39 US12 Reconstruction and mill and overlay from Wayzata Blvd to I-494 $60,600,000 2026 Concrete segment is in poor condition; maintenance liability 2716-129
39 I35E Replace short segment of pavement either side of bridge 9532 $3,000,000 2026 Poor pavement conditions. Coordinate with Shepard Rd bridge replacement.
39 I694 Major rehabilitation from MN49 to Washington County Road 10 $18,400,000 2029 Repair early distresses.
38 I94 Medium mill and overlay from Exit 207 to I494 $14,500,000 Not Selected  Program limited by available funding.
36 US12 Thin mill and overlay from the eastern Independence City limits to Hennepin County Road 29 $3,800,000 2029 Poor pavement conditions.
36 US169 Medium mill and overlay from Valley View Rd to US 212/MN62 $1,900,000 Not Selected  Program limited by available funding.
35 MN77 Medium mill and overlay from I-494 to MN62 $13,200,000 2022 Poor pavement conditions. SP 2758-077.
35 MN55 Medium mill and overlay from General Mills Blvd to Schaper Rd $2,100,000 Not Selected  Program limited by available funding.
34 US61 Thin mill and overlay from MN316 to 3rd st $3,700,000 2026 Poor pavement conditions. 1913-107
33 I94 Medium mill and overlay from Wright/Hennepin County line $3,400,000 Not Selected  Program limited by available funding.
32 MN280 Unbonded overlay from Como to I-35W $23,400,000 2027 Poor pavement conditions.
32 I35 Medium overlay from Dakota County Road 70 to I35E/I35W $18,500,000 2029 Poor pavement conditions.
31 I35W Medium mill and overlay from 106th to 76th $7,300,000 2023 Poor pavement conditions. Coordinate with 494 CoC project. SP 2782-352.
29 MN65 Medium mill and overlay from south of E Moore Lake Dr to Anoka County Road 10 $3,100,000 Not Selected  Program limited by available funding.
29 I494 Medium mill and overlay from I-94/694 to Lake Dr $2,300,000 Not Selected  Program limited by available funding.
29 MN610 Medium mill and overlay from Elm Creek Blvd to US 169 $2,700,000 Not Selected  Program limited by available funding.
29 I35E Medium mill and overlay from Cayuga to Little Canada Rd $7,700,000 Not Selected  Program limited by available funding.
29 US10 Medium mill and overlay from MN101 to Cleveland Ave $3,400,000 Not Selected  Program limited by available funding.
28 I35E Medium mill and overlay from Ramsey County Road 96 to 80th St $10,600,000 Not Selected  Program limited by available funding.
27 I35W Medium mill and overlay from Sunset Ave to I35W/I35E $7,100,000 Not Selected  Program limited by available funding.
25 I35 Medium mill and overlay from I35W/E to US8 $6,400,000 Not Selected  Program limited by available funding.
25 I35 Medium mill and overlay from Chisago County Road 9 to Chisago/Pine County line $8,600,000 Not Selected  Program limited by available funding.
23 I494 Medium mill and overlay from I94/694 to Tamarack Rd $800,000 Not Selected  Program limited by available funding.
21 US169 Medium mill and overlay from MN19 to MN25 $4,500,000 Not Selected  Program limited by available funding.
19 US212 Major rehabilitation from Carver County Road 36 to 2.2 miles east of MN284 $8,400,000 2023 Poor pavement conditions. SP 1013-101.
18 MN77 Unbonded overlay from 138th St to Dakota/Hennepin County line $51,600,000 2026 Poor pavement conditions. 1929-050
18 US169 Major rehabilitation from Scott County Road 16 to Canterbury Rd $13,100,000 2026 Poor pavement conditions. 7009-129
18 US169 Medium mill and overlay from 1.2 miles north of MN282 to .27 miles north of MN282 $5,900,000 Not Selected  Program limited by available funding.
18 US169 Medium mill and overlay from 93rd Ave to Elm Creek Blvd $4,000,000 Not Selected  Program limited by available funding.
17 I35E Medium mill and overlay from County Road E to County Road 96 $2,300,000 Not Selected  Program limited by available funding.
15 US169 Medium mill and overlay from MN25 to Ash St $1,800,000 Not Selected  Program limited by available funding.
11 I35E Medium mill and overlay from  south of I-35W to I35E/W $1,300,000 Not Selected  Program limited by available funding.

Previous years