In 2025, MnDOT will make safety, traffic flow and signal improvements to Highway 60 in Windom between John Caldwell Drive and the Des Moines River Bridge.
MnDOT is piloting a 3-lane configuration, consisting of one through lane in each direction and a center left turn lane. This pilot project is based on a preferred option from the 2019-2020 Highway 60 Windom Corridor Study.

Summary of work

  • Restriping and pavement preservation for the entire project corridor
  • Signal replacement and ADA upgrades at 6th and 10th Streets

Goals

  • Improve safety for all users
  • Improve traffic flow
  • Replace deteriorating traffic signals
  • Provide safer crossings at intersections for pedestrians and bicyclists
  • Maintain existing business access