About this project
Approximately five miles of Hwy 15 from the north Hwy 15/Hwy 60 interchange to the Watonwan/Brown County line near Madelia will be resurfaced in 2022.
Summary of work
- Resurface the roadway
- Install lighting at CR 58 and CR 6 intersections
- Improve drainage by repairing culverts
- Install snow fence along Hwy 15 near CR 3
- Update the bridges at Hwy 15/Hwy 60 and over the railroad
Traffic Impacts
Traffic will be detoured during construction.