Final update: Good news—all lanes open
About this 2024 project
MnDOT resurfaced and improved seven miles of Hwy 169 from Crow Wing Co. Rd. 26 south of Garrison to half-mile north of Ojibwe Dr.; includes new storm sewer, guardrail upgrades and new left-turn lanes at Co. Rd. 25 (Timber Trail Rd.) and Swing-A-Way/S Port.
Summary of work
- Resurface road and shoulders
- Add left-turn lanes at:
- Timber Trail Rd. (Co. Rd. 25)
- Swing-A-Way/S Port
- Replace three culverts
- Upgrade guardrail