Minnesota Department of Transportation

511 Travel Info

Hwy 23 — Milaca

Mille Lacs County

2021 corridor study

Hwy 23 Milaca project location map

The study focuses on access and safety improvements at these Hwy 23 intersections through Milaca:

  • Third Ave. SW
  • Central Ave.
  • Second St.
  • First St. E
  • Hwy 169 ramps
  • 110th Ave.
  • 105th Ave.

MnDOT, in partnership with Mille Lacs County and the City of Milaca, conducted a 2021 corridor study to identify improvement needs along Hwy 23 between the Rum River Bridge to Co. Rd. 2 (105th Ave.) in Milaca.

The study sought ways to improve traffic flow, safety and multi-modal use to meet the growing needs of the Milaca community. Overall feedback and information gathered in the 2021 corridor study, will be used to plan future short and long-term improvements along Hwy 23.

If you have questions or would like an electronic version of the entire technical study, contact:

Zach Whitley
MnDOT Project Study Manager
Zachary.Whitley@state.mn.us