Roadwork in Brooten and Belgrade.

Plan to see roadwork on Hwy 55 in Brooten and Belgrade through July 2021. Watch for workers, and equipment. Stay out of barricaded areas and follow construction signs.

Hwy 55 Brooten

July impacts:

  • Hwy 55 open in both directions. Lanes shifts within work area
  • Side street access may close, follow signs
  • Pedestrian sidewalk closures, follow signs

June impacts:

  • Westbound Hwy 55 detoured northwest along Railway Ave., Second Ave. and School Ave.
  • Eastbound Hwy 55 detoured southeast along Western Ave. S and Roe St.
  • Map, PDF

Hwy 55 Belgrade

June-July Impacts:

  • Hwy 55 open in both directions. Lanes shifts within work area.
  • Side street access may be closed, follow signs
  • Pedestrians will encounter sidewalk closures, follow signs
  • Map, PDF

Brooten and Belgrade open for business

Hwy 55 will be open and maintained to those who live, work or visit Brooten and Belgrade. However, expect changes.

About this project

MnDOT will reconstruct and improve safety on Hwy 55 through the cities of Brooten and Belgrade.

Summary of work

  • Reconstruct the asphalt road surface
  • Replace underground storm sewer
  • Install curb and gutter
  • Update and add new pedestrian sidewalk and ramp approaches