Washington St.—Brainerd

Hwy 210 from Baxter Dr. to Pine Shores Rd., Crow Wing County

Know before you go: check 511mn.org

Current work zone

Lane closures

Hwy 210 - Pine Shores Rd. to S Sixth St. (Business Hwy 371)

One lane each way as crews update the east, mall and railyard segments.

Detour

Hwy 210 - C St./Hwy 25 to Kingwood St.

Road closed to all traffic and detoured to reconstruct the railyard segment.

Hwy 210 detour in Brainerd
Construct the Railyard segment. Follow detour along Hwy 25, Oak St. and S Eighth St (westbound) or S Sixth St. (eastbound). Select map image to enlarge

Local access

Brainerd is open to those who live, work or visit areas along the closed Hwy 210 work zone.

  • Follow signs; expect gravel or grooved surfaces and side-entrance/sidewalk detours. Here's some tips:
    • Use Co. Rd. 3 (Mill Ave) at Hwy 210 to access northeast Brainerd
    • Use C St.at Hwy 210 to access B St. businesses between Gillis Ave. and Fifth St.
    • Use Nelson Dr. (old Eighth Ave.) or 10th Ave. NE to access funeral home and businesses/school
      • NOTE: Temporary signal at Hwy 25 and 10th Ave. NE will remain operational until Nelson Dr. construction is completed by early September
    • Use Oak St. to access 13th St. SE south NP Center
  • Residents and businesses: Project info line: 320-204-1763 (contractor)

Regional routes for through traffic

Avoid delays and go around the work zone.

    Hwy 210 detour in Brainerd
    Regional detour options to go around the work area. Note: Co. Rd. 3 open at Hwy 210. Select map image to enlarge

Building a better Brainerd

MnDOT will reconstruct and improve the Washington St. (Hwy 210) through Brainerd from Baxter Dr. to Pine Shores Rd. in 2026 and 2027.

Hwy 210

  • Reconstruct (mall, railyard, downtown, bridge segments) or resurface (east and west segments) the road
  • Reconstruct curbs, gutters, raised medians and storm sewers
  • Update signal systems
  • Remove signal systems at Mill Ave. and 4th Ave. NE
  • Realign and improve access at the Hwy 210 and Hwy 25/Mill Ave., includes two roundabouts
  • Upgrade city utilities beneath the road
  • Upgrade pedestrian sidewalks and approaches and reconstruct/connect the Cuyuna Lakes Trail
  • Update the Mississippi River bridge
Project location map and general segments. Select image to enlarge

Hwy 210 segments

2026 work
  • East— 10th Ave. NE to Pine Shores Rd.
  • Mall—5th Ave. E to 10th Ave. NE
  • Railyard —Kingwood St. to 5th Ave.
2027 work
  • Downtown — E River Rd./N 1st St. to Kingwood St.
  • Bridge— 4th St. NW to east of the Mississippi River at E River Rd./N 1st St.
  • West — Baxter Dr. to 4th St. NW

Work segments subject to change once more is known. More details to become available closer to construction.