About the project
MnDOT will resume construction on the Highway 11 Warroad River bridge in June 2026. This two-year project began in May 2025 on the east side of the bridge. The west side of the bridge will be constructed this year.
Traffic impacts
- Motorists can expect a truck detour, temporary traffic signals and single lane traffic on the bridge.
The truck detour route will utilize Roseau County roads 9 and 12.
Nearby Projects:
- 2026: Hwy 11 Roseau to Warroad
- 2026: Hwy 11 Greenbush
- 2027: Hwy 89 Roseau
- 2028: Hwy 11 Warroad to Roosevelt (website coming soon)
Learn more
- Visit the Engagement page to learn the different ways to engage with the project and view content from previous meetings
- Visit the Highway 11 Corridor Study page to learn more about the 2015 corridor study conducted on approximately 60 miles of Highway 11 in Roseau County between Greenbush and Roosevelt
- Learn more about how roundabouts improve traffic flow while also increasing safety
