Minnesota Department of Transportation

511 Travel Info

Highway 55/Olson Memorial Highway study

Minneapolis

About this study

Highway 55/Olson Memorial Highway between Border Ave. and the bridge west of Thomas Ave. in Minneapolis study area map

Hwy 55/Olson Memorial Hwy study area map

View full-size map

We are studying Olson Memorial Hwy between Border Ave. and the bridge west of Thomas Ave. This highway is an important route for the local community and surrounding region, including those that drive, walk, bike, roll, and use public transit.

We are conducting the study to better understand the needs of the community and explore long-term solution that benefits the surrounding community and people who use the highway. The study will use data and input from the community on their transportation needs, existing experiences, and desires for the future of Olson Memorial Hwy.

Summary of work

  • Gather community input on their transportation needs and desires for the future of Olson Memorial Hwy
  • Summarize the issues and problems within the study area through a Purpose and Need Statement
  • Explore short and long-term improvements
  • Evaluate ideas through technical analysis and community input
  • Identify design alternatives
  • Describe the next steps to advance future construction

Study timeline

The Olson Memorial multimodal study has five phases:

Olson Memorial Highway study schedule

Current phase: Community feedback and Purpose and Need (June – November 2023)

During this phase of the study, the team is gathering input from the community on their experiences and needs for Olson Memorial Hwy.

Goals
  • Understand current experiences and transportation needs of the community, including those that live and travel within and through the study area
  • Gather ideas and visions from the community on the future of Olson Memorial Hwy