Minnesota Department of Transportation

511 Travel Info

Highway 41

Chaska and Chanhassen

About this project

Highway 41 in Chaska project area map

Hwy 41 project area map.

View full-size map

Beginning spring 2023, crews will resurface Hwy 41 and make additional improvements along the highway between Pioneer Trail and Hwy 5 in Chaska and Chanhassen. This work will create a smoother ride and improve safety and accessibility.

Summary of work

  • Resurface Hwy 41 between Pioneer Trail and Hwy 5
  • Replace traffic signal at 82nd St.
  • Add lighting to Hwy 41 at the Oak Ridge Dr. intersection
  • Add curb ramps at 82nd St. and Hazeltine Blvd. to improve accessibility and meet Americans with Disabilities Act Standards
  • Extend guardrail near Lyman Blvd.
  • Reduce erosion and improve drainage