About this project
The eastbound lanes of Hwy 60 from the northern junction of Hwy 15 near Madelia to 0.4 miles west of the western junction of Blue Earth County Road 20 near Lake Crystal will be resurfaced in 2021 to provide a smoother roadway, safer winter driving where snow fence is installed, and improved drainage through culvert work and minor ditch grading.
Summary of work
- Repave the eastbound lanes
- Install structural snow fence north of Hwy 60, east of Blue Earth County Road 109
- Repair culverts throughout the project corridor
- Add shoulder rumble strips
Traffic Impacts
This project is planned to primarily be done under traffic, however a short duration detour may be necessary.