Minnesota Department of Transportation

511 Travel Info

Highway 19 reconstruction and repaving

Northfield

About this project

Past public meetings

Thank you to those who have attended our public meetings. You can review information that was shared at them below. If you have comments, concerns or ideas, please provide them in this comment form.

Materials from November 19, 2026 meeting:

Materials from August 20, 2025 meeting:

Summary of work

Hwy 30 project area
Highway 19 project area (click to enlarge)

In 2028, a MnDOT contractor will reconstruct Highway 19 from Decker Avenue to the Union Pacific Railroad tracks just west of Highway 3 in Northfield and repave Highway 19 between the railroad tracks and Highway 3. The road will change from two lanes to add a continuous left turn in addition to the two lanes. A roundabout is proposed to be constructed at Armstrong Road. A trail will be constructed on the north side of Highway 19 from Decker Avenue to Highway 3 with additional improvements for pedestrians and bicycles from Armstrong Road to Highway 3.

Traffic impacts

Effects on traffic will be determined closer to the time of construction and developed with consultation from businesses and residents.