Minnesota Department of Transportation

511 Travel Info

I-94 - Hwy 336 to Red River Bridge

Moorhead

Study complete

About this study

I-94 Study Area

From 2024 to 2026, the Minnesota Department of Transportation studied Interstate 94 between the Red River and Highway 336 in Moorhead to identify improvements that support future reconstruction, improve safety, maintain mobility, and enhance walking and biking connections.

The study evaluated current and future transportation needs and developed recommendations to guide future project development.

Summary of work

  • Assessed existing corridor conditions
  • Analyzed safety, traffic, freight, and active transportation needs
  • Forecasted traffic growth through 2050
  • Gathered public and stakeholder input
  • Developed and evaluated improvement concepts
  • Identified recommendations and implementation strategies

Study findings

Public input

Public engagement took place in two phases to identify corridor needs, evaluate conceprts and inform study recommendations. A variety of outreach methods were used, including online surveys, public open houses, stakeholder and focus groupmeetings, community pop-up events, social media, news media, direct mail, and interactive online engagement tools. ensure thorough analysis and meaningful engagement.

Participation highlights:
  • July-December 2024 (Phase 1): More than 1,300 participants engaged through online surveys, interactive map, videos, social media, stakeholder outreach and other engagement activities.
  • December 11, 2024: Phase 1 public open house held at the Moorhead Convention center with more than 40 attendees.
  • July-August 2025: Community pop-up events and displays were held at the Moorhead Days Airport 30th Anniversary Celebration, Moorhead Farmer's Market, Moorhead Public Library, and the I-94 Moorhead rest area.
  • Summer - Fall 2025: Two rounds of focus groups engaged 45 participants representing 29 organizations.
  • October 15, 2025: Phase 2 public open house held at Minnesota State Community and Technical College with approximately 23 attendees.
  • Fall 2025: The Phase 2 survey received 616 responses evaluating proposed corridor improvements.
  • More than 13,000 postcards were mailed across both phases to households and busineses near the corridor.

Study area needs


Based on technical analysis and public input, the study identified four key needs:

Safety
  • Reduce crashes and improve winter-weather safety
  • Address congestion-related crash risks
Mobility
  • Improve travel reliability
  • Prepare for future traffic growth
  • Reduce congestion on I-94 and nearby roadways
Infrastructure preservation
  • Replace aging pavement and bridge infrastructure
  • Support future reconstruction needs
Walkability and bikeability
  • Improve bicycle and pedestrian connections across and along the corridor

Key themes

Information gathered during engagement, and the existing conditions and study area needs were used to help with the development and analysis of ideas for improvements. These are some of the concepts recommended from the study:

  • Adding more lanes: Comments suggested adding a third lane in each direction to help with
    traffic flow and reduce congestion, especially during peak hours and summer travel times.
  • Improving on/off ramps: Several responses mentioned the need for better on and off ramps, particularly at 20th Street and Highway 336, to improve traffic flow and safety.
  • Addressing speed limits: Some respondents mentioned the need to raise or better enforce
    speed limits to improve traffic flow and safety.
  • Enhancing road conditions: There were multiple mentions of the need to improve road
    conditions, including fixing potholes and better managing snow and ice during winter.
  • Sound barriers: A few respondents suggested adding sound barriers to reduce noise pollution for residents living near the I-94 corridor
  • Preparing for new development: Several comments acknowledged the need to plan for the future of I-94. Especially in East Moorhead.

Next steps

This study has provided information and ideas to help guide the planning of future improvements along and across I-94 in Moorhead. There are many next steps to address, including more detailed designs and refinements of alternatives, environmental reviews, costs and funding and partner roles. We will continue meeting with communities and leaders to develop projects that meet the needs of the people in the study area.