Study complete
About this study
From 2024 to 2026, the Minnesota Department of Transportation studied Interstate 94 between the Red River and Highway 336 in Moorhead to identify improvements that support future reconstruction, improve safety, maintain mobility, and enhance walking and biking connections.
The study evaluated current and future transportation needs and developed recommendations to guide future project development.
Summary of work
- Assessed existing corridor conditions
- Analyzed safety, traffic, freight, and active transportation needs
- Forecasted traffic growth through 2050
- Gathered public and stakeholder input
- Developed and evaluated improvement concepts
- Identified recommendations and implementation strategies

