Minnesota Department of Transportation

511 Travel Info

Hwy 87

Frazee to the Becker/Wadena county line

Find information about the Complete Streets reconstruction of Hwy 87 in the city of Frazee.

Project information

In 2021, the Minnesota Department of Transportation will complete a project on Highway 87 from Frazee to the Becker/Wadena county line.

Map shows Highway 87 closed between Frazee and the Becker/Wadena County Line, just west of Menahga. Detour follows CR 29, Hwy 34 and Hwy 71.
Hwy 87 Frazee to Menahga

Project details

Frazee to Menahga

North River Drive in Frazee to Evergreen
  • Robust resurfacing (reclaim)
  • Shoulder widening, with 8 additional feet on each side of the highway
  • Centerline and box culvert replacements and improvements
Project map for pavement resurfacing and shoulder widening for Highway 87 from Frazee to Evergreen
Evergreen to the Becker/Wadena county line
  • Robust resurfacing (reclaim)
  • Culvert work and improvements

Project map for pavement resurfacing from Evergreen to the Becker/Wadena county line