Current traffic impacts
- One lane in each direction. On ramp at Hwy 59 interchange remains closed. Travel with caution.
- Detour: eastbound I-94 on-ramp closure at Highway 59 interchange. Use CR 88 through Fergus Falls.
Project details
In 2025, the Minnesota Department of Transportation will resurface the eastbound lanes on Interstate 94 from just west of County Road 11 near Rothsay to Highway 59 near Fergus Falls.
Key project elements
- Unbonded concrete overlay (resurfacing)
- Construct pier struts and pave slope at 330th Street bridge
- Upgrade RWIS site
- On ramp closure at Highway 59 near junction of CR 88

