Minnesota Department of Transportation

511 Travel Info

Hwy 10 and 23—St. Cloud

Interchange east of the Mississippi River in Benton County

Reconstruct interchange

MnDOT will reconstruct the Hwy 10 and 23 interchange area in east St. Cloud in 2023 and 2024.

Current impacts

Off-road work to occur year-round. All traffic impacts are tentative and weather dependent.

Reconstruct Hwy 10 and Hwy 23 in St. Cloud
Work zone map for 2023-2024 winter season. Select image to enlarge

Lane closures

Hwy 10

Open with periodic lane closures between Benton Dr. SE and 15th Ave. SE.

  • Eastbound new smoother road surface
  • Westbound reconstruct 2024**

Hwy 23

Open with periodic lane closures between Wilson Ave. SE and 25th Ave. SE

  • Westbound new smoother road surface and bridge
  • Eastbound reconstruct 2024**

** Please remember that half of the road surface has been completed. Motorists who travel on westbound Hwy 10 and eastbound Hwy 23 will continue to encounter a rough ride, especially when freeze/thaw cycles occur. MnDOT will monitor and repair areas when necessary. For current road conditions on Minnesota highways, check 511mn.org.

St. Cloud is open

Access will be maintained to those who live, work, visit or shop within this project area; however, expect changes and use of alternate entrances, and follow road signs

These access routes will remain active over the 2023-2024 winter season:

EB Hwy 23 to EB Hwy 10 ramp closed

EB Hwy 10 to EB Hwy 23 loop ramp closed

EB Hwy 10 to WB Hwy 23 ramp closed

WB Hwy 23 to EB Hwy 10 loop ramp closed

WB Hwy 23 to WB Hwy 10 ramp closed

WB Hwy 10 to WB Hwy 23 loop ramp closed

Fourth St. SE

  • Intersection closed at 4th St., eastbound Hwy 10 and the W Frontage Rd. to construct new 4th St. connection and future bridge to span Hwy 10. New bridge to be complete in 2024. Work at westbound Hwy 10 and E Frontage Rd. to occur in spring 2024.
    • Access from Lincoln Ave. SE or 15th Ave. SE
    • Access to businesses will be maintained, follow signs

About this project

Reconstruct Hwy 10 and Hwy 23 in St. Cloud
Reconstruct Hwy 10 and Hwy 23 interchange and improve pedestrian access.

Summary of work

  • Reconstruct and improve the Hwy 10 and 23 interchange:
    • Rebuild the Hwy 23 bridge(s) over Hwy 10
    • Reconfigure on/off ramps to improve motorist traffic flow and safety
    • Provide safer pedestrian and bicyclist crossing options
  • Reconstruct both directions of Hwy 10 between 15th Ave. SE and Benton Dr. includes turn lanes, shoulders and entrances
  • Reconstruct both directions of Hwy 23 from east of Wilson Ave. SE near the pedestrian overpass to east of Benton Co. Rd. 1, includes turn lanes, shoulders and entrances
  • Update signal systems at:
    • Hwy 23 and Lincoln Ave.
    • Hwy 10/E St Germain St.
    • Hwy 23 and Division St. E/14th Ave. SE
  • Replace or repair drainage structures
  • Construct a new City of St. Cloud Fourth St. SE bridge to span Hwy 10 and connect to the east and west Hwy 10 frontage roads
  • Construct a noisewall along the south side of Hwy 23 and east of 14th Ave. SE
  • Improve and update pedestrian access on Hwy 10 and Hwy 23