Long-Range Plans
- Statewide Transportation Plan 2009-2028
- Statewide Highway Investment Plan Summary: 2009-2028
- Individual District Highway Investment Plans: 2009-2028
- Transportation Planning
Find Information about city and county roads
Studies, Plans and Future Projects
Find out about studies and plans for possible future projects. Some projects on this list are already scheduled and work will begin in the near future. Get involved in public hearings and the planning process. Learn about the planning process before a highway is built.
There is also a list of current construction projects on highways.
| Select
a highway from the list below: |
Hwys 1-36
Hwy 1/169 Between Hwy 53 and Ely Reconstruction Work begins: 2012 Contact: Beth Petrowske
|
Hwy 5—Carver County from Hwy 41 to Hwy 212 Study by Carver County, the cities of Victoria and Waconia and MnDOT to identify possible future improvements. Maps and additional documents Contact: J.P. Gillach
|
|
Interregional corridor study Work begins: 2011 Contact: Todd Clarkowski
|
Hwy 10 Elk River Upgrade freeway system: Study Status: Environmental Assessment, Environmental Assessment Worksheet and Draft Section 4(f) Evaluation was open for public review and comments until Dec. 20, 2010. Study funded by the city of Elk River. Contact: Jim Hallgren, project manager james.hallgren@state.mn.us
Hwy 10—Ramsey Preliminary Interchange Design Contact: Mark Lindeberg, 651-234-7722
Hwy 10—Anoka Work begins: N/A Contact:Carolyn Braun
|
Hwy 13—Burnsville Interchange (at Hwy 5) New interchange and frontage roads Work begins:N/A
Hwy 13 between I-35E in Lilydale and Second Street in Mendota
|
Hwy 14—from Nicollet County Hwy 6 to Lookout Drive in North Mankato Reconstruction and improvements Work begins: 2011 Contact: Matthew Rottermond
Hwy 14—New Ulm to N. Mankato Environmental Impact Statement Work Begins: 2015 Environmental impact studies, alternatives, public involvement Contact: Peter Harff
Hwy 14—between Owatonna and Dodge Center South bypass alignment Work begins: Once funding is available Contact: Heather Lukes
|
Hwy 15 — Sartell/St. CloudConstruct a diverging diamond interchange at Stearns County Road 120 Work begins: 2012-2013 Maps and additional documents for Hwy 15 Sartell/St. Cloud Contact: Claudia Dumon
|
Hwy 23—Paynesville area Improvements Work begins: N/A Contact: Lowell Flaten Hwy 23/71—Kandiyohi County Improvements Work begins: 2015 Contact: Lowell Flaten
|
I-35E in Eagan Noisewall construction Work begins: 2012 Contact: J.P. Gillach
I-35E in St. Paul Cayuga/Maryland Contact:Joey Lundquist
|
I-35W and Hwy 13 Burnsville Interchange New interchange and frontage roads Work begins: N/A Contact:J.P. Gillach
I-35W Bus Rapid Transit Study Study
I-35W—Transit/Access Project
|
Hwy 36—St. Croix River Crossing Project New bridge Work begins: 2013 Contact: Kevin Walker
Hwy 36—Stillwater Lift Bridge Contact: Kevin Walker
Hwy 36—Hilton Trail in Pine Springs Contact: Paul.Kachelmyer@state.mn.us
|
Hwys 41-100
Hwy 41—River Crossing Project Contact: Diane Langenbach
Hwy 41—Minnesota River Flood Study Flood Mitigation on Hwys 41, 101 and 169 Contact: JP Gillach
|
Hwy 43—Winona Bridge Bridge replacement Work begins: 2014 Contact: Kristine Hernandez
|
Hwy 52—City of Cannon Falls New interchange Work begins: N/A Maps and additional information Contacts: Kristine Hernandez
Hwy 52 in Inver Grove Heights
Hwy 52 and Hwy 12 in Pine Island—Elk Run Development New interchange Contact: Kristine Hernandez Hwy 52 in North Rochester Northern Rochester Transportation Study (City of Rochester) Contacts: Jeff Bunch
Hwy 52 in Hampton Contacts: Diane Langenbach
Hwy 52 and Dakota County 42 in Rosemount
Hwy 52 Cannon Falls to Hader Access Study Status: Study Contact: Jeff Bunch
|
Hwy 53—Between Eveleth and Virginia Relocation of the highway Status: Environmental work is now needed to select a preferred alignment alternative. Public input will be solicited during future scoping meetings to assist in identifying alternatives. Contact: Brian Larson
Hwy 53, Virginia to Cook Four-lane expansion project Maps and additional information Contact: Brian Larson
|
Hwy 55—Annandale to Rockford Four lane expansion Work begins: Currently unscheduled Maps and additional information Contacts: Claudia Dumont
Hwy 55—Medina to Rockford
Hwy 55—Plymouth to Rockford Lane expansion Work begins: N/A Maps and additional information Contact: James Grube
|
Hwy 59—Pelican Rapids Resurfacing, bridge replacements Work begins 2012 |
Hwy 60 in Worthington Description: Part of the Hwy 60 expansion project
Hwy 60 - Worthington Travel Information Center Contact: List of e-mails and people to contact about Rest Areas
Hwy 60 Windom to St. James
|
Hwy 61—London Road Corridor Study Contact: Scott Sannes
|
Hwy 63—Zumbro Falls Bridge replacement Open house, Jan. 6, 2010, 6-8 p.m., Zumbro Falls Fire Station Work begins: 2011
|
Hwy 65—Minneapolis to Fridley
|
Hwy 71/23—Kandiyohi County Work begins: 2015 Contact: Lowell Flaten
|
Hwy 77—Cedar Avenue in Apple Valley and Bloomington Study to find ways to relieve congestion Contact: Brian Kary
|
I-90—Bridge near Dresbach Study Work begins: 2012 Contact: Kristin Kammueller
|
I-94 to Hwy 10 Interregional Connection Clearwater to Clear Lake River crossing and freeway connection Work begins: 2023 Contact: Terry Humbert
I-94 East Metro Corridor Study Traffic forecasts and operations study Contact: Bill Goff
I-94 Chatsworth Pedestrian Bridge Build pedestrian bridge Work begins: Summer 2012 Contact: Kent Barnard
I-94 and Hwy 19 and Hwy 37 near Albertville Improved interchange project Work begins: Summer 2010 Contact: Terry Humbert
|
Hwy 95 North Branch
Hwy 95 Taylors Falls
|
| Hwy 100 St. Louis Park Interchange reconstruction Work begins: 2015 Additional Information Contact: April Crockett |
Hwy 101 Chanhassen Study Construction 2013-City of Chanhassen Contact: Paul Oehme
Hwy 101 —Minnesota River Flood Study Flood Mitigation on Hwys 41, 101 and 169 Contact: JP Gillach
|
Hwy 169—Belle Plaine Area Study (PDF, about 40 pages)
Hwy 169 and Hwy 41—River Crossing Project Study and Environmental Impact Statement Contact: Diane Langenbach
Hwy 169 in Blue Earth Work begins: 2012
Hwy 169 at Scott County Hwy 69 in Shakopee
Hwy 169/County Hwy 30 (93rd Ave N) Contact: Bre Grand
Hwy 169 —Minnesota River Flood Study Flood Mitigation on Hwys 41, 101 and 169 Contact: JP Gillach
Hwy 1/169 Between Hwy 53 and Ely Reconstruction Work begins: 2012 Contact: Beth Petrowske
Hwy 169—Elk River to Zimmerman Add interchanges and frontage roads: Study Status: Environmental Assessment, Environmental Assessment Worksheet and Draft Section 4(f) Evaluation is open for public review and comments thru Dec. 20, 2010. Study funded by the city of Elk River. Study funded by the city of Elk River.
|
|
Hwy 212—Norwood Young America Lane expansion Work begins: N/A Contact: Nicole Peterson
Hwy 212—Cologne Transportation planning study
Hwy 212 connection to Hwy 169 and Hwy 41 River Crossing Project Study and Environmental Impact Statement Contact: Diane Langenbach
|
Hwy 294—Willmar Study Contact: Diane Beck
|
Hwy 316 through Hastings Study Contact: Ken E. Johnson
|
Hwy 371—Nisswa to Pine River Expansion to four lanes Work begins: 2018 Contact: Jim Hallgren
|
I-494 Between I-394 and East Fish Lake Road
I-494—Richfield, Edina, Bloomington |
I-694 Interchange and White Bear Ave. Reconstruction project Work begins: N/A More information (City of Maplewood)
I-694 from 40th St. to Hwy 61 in Oakdale, Mahtomedi, Vadnais Heights, White Bear Lake and Maplewood Construction Dates: Begins June 2012 Contact: Kevin Walker
|
Hwy 952A /South Robert Street — West St. Paul between Mendota Road and Annapolis Street |