Three-sided Precast Concrete Bridge Structure |
|||
|---|---|---|---|
| Manufacturer | Description | Approval Date | Restrictions |
Arched top
|
8/2003 |
CONSPAN gravity anchored wingwall will be evaluated based in scour conditions on a project by project basis.
|
|
Arched top
|
6/2004 |
The gravity anchored wingwall will be evaluated based in scour conditions on a project by project basis.
|
|
Flat top |
1/2006 |
Approved for CIP wingwall. |
|
Flat top |
1/2004 |
||
Flat top |
8/2003 |
||
Resources
- Tech Memo (PDF)
Contact
Khalid Obeidat
Bridge Office
651-366-4485

