Jump to main content.
Minnesota Department of Transportation Go to 511
MnDOT A to Z | General Contacts | Simple Search | Advanced Search
 

Materials Control Schedule

Contact Us   Materials Home | Approved/Qualified Products | Lab Testing and Inspection | Lab Manual
 

Quick Links

Materials Forms

Other Links

Materials Control Schedule

Materials Control Schedules are inserted into project proposals to direct how materials are to be sampled. The Materials Control Schedule is updated yearly. Each Materials Control Schedule is project specific. Therfore, one needs to refer to their specific proposal.

 

2012 Materials Control Schedule (PDF, 604KB, 60pp)

2011 Materials Control Schedule (PDF, 380KB, 62pp)

2010 Materials Control Schedule (PDF, 689KB, 56pp)

2009 Materials Control Schedule (PDF, 577KB, 49pp)

2008 Materials Control Schedule (PDF, 577KB, 48pp)

2007 Materials Control Schedule (PDF, 1,027KB, 48pp)

2006 Materials Control Schedule (PDF, 502KB, 46pp)

2005 Materials Control Schedule (PDF, 457KB, 43pp)

2004 Materials Control Schedule (PDF, 317KB, 39pp)

2003 Materials Control Schedule (PDF, 254KB, 41pp)

2002 Materials Control Schedule (PDF, 253KB, 41pp)

2001 Materials Control Schedule (PDF, 132KB, 38pp)

2000 Materials Control Schedule (PDF, 176KB, 37pp)