Jump to main content.
Minnesota Department of Transportation Go to 511
MnDOT A to Z | General Contacts | Search |
 

Schedule of Materials Control

Contact Us   Materials Home | Approved/Qualified Products | Lab Testing and Inspection | Lab Manual
 

Quick Links

Materials Forms

Other Links

Schedule of Materials Control (SMC)

Schedule of Materials Control is inserted into project proposals to direct how materials are to be sampled.Each Schedule of Materials Control is project specific. Changes to the SMC may be included in the special provisions of the project. Therefore, one needs to refer to their specific proposal.

 

At this time, future versions of the Schedule of Materials Control will be coordinated with the publishing of an annual Standard Specifications for Construction.

 

2015 Schedule of Materials Control (use 2014 version)

2014 Schedule of Materials Control (PDF, 672KB, 69pp) (to be used with 2014 spec book)

2013 Schedule of Materials Control (PDF, 628KB, 66pp)

2012 Schedule of Materials Control (PDF, 604KB, 60pp)

2011 Schedule of Materials Control (PDF, 380KB, 62pp)

2010 Schedule of Materials Control (PDF, 689KB, 56pp)

2009 Schedule of Materials Control (PDF, 577KB, 49pp)

2008 Schedule of Materials Control (PDF, 577KB, 48pp)

2007 Schedule of Materials Control (PDF, 1,027KB, 48pp)

2006 Schedule of Materials Control (PDF, 502KB, 46pp)

2005 Schedule of Materials Control (PDF, 457KB, 43pp)

2004 Schedule of Materials Control (PDF, 317KB, 39pp)

2003 Schedule of Materials Control (PDF, 254KB, 41pp)

2002 Schedule of Materials Control (PDF, 253KB, 41pp)

2001 Schedule of Materials Control (PDF, 132KB, 38pp)

2000 Schedule of Materials Control (PDF, 176KB, 37pp)