Materials Links
- Aggregates
- Bituminous
- Concrete
- FHWA Pavements
- Grading and Base
- Intelligent Compaction
- Lab Testing and Inspection
- Local Road Research Board (LRRB)
- Materials Engineering
- Materials Engineers Organization
- MnDOT Technical Certification
- MnROAD
- Pavement Design
- Pavement Management
- Research
- Seasonal Load Limits
- Smoothness Program
- State Aid
Mn/DOT Resources
- Construction Tools
- Bid-Letting
- Bridges and Structures
- Mn/DOT Spec Book
- Schedule of Materials Control
- Special Provisions
- Technical Memorandums
- Mn/DOT Technical Certification
Other Concrete Links
Concrete Paving Forms
Field
- Air Content Charting
- Concrete Test Beam Data (2162)
- Probing and Coring Report - revised 9/2012
- Concrete Pavement Texture
Incentive/Disincentive Field Worksheets
Plant
- Contact Report 2013 - Paving (2164)*
*Check For New Sampling Requirements
- Cement Record (2157)*
*Check Contract, May No Longer Be Required
- JMF Adjustment Worksheet
Incentive/Disincentive Plant Worksheets
- W/C Ratio Calculation Worksheet - For Projects Let 2011 and Later
- Concrete Aggregate Worksheet - revised 2/2012
- Concrete Coarse Aggregate Quality Worksheet
Submit the following forms for Concrete Paving Projects to the Concrete Engineering Unit:
Send copies of all Agency and Contractor tests results including control charts. These include but are not limited to:
- Contact Report for Paving
- Field Probing Report
- Field Coring Report
- Concrete Test Beam Data (Form 2162)
- W/C Ratio Calculation Worksheet
- Concrete Aggregate Worksheet
- Concrete Coarse Aggregate Quality Worksheet
- Sand Patch Test Results
Concrete Forms
Some forms and other project information are required to be submitted to the Concrete Engineering Unit and all other forms are for Project internal documentation only.
Contact the Concrete Engineering Unit if you have any questions about the forms.
Weekly Concrete Reports
Email Weekly Concrete Reports to:
wklyconcrpt.dot@state.mn.us Weekly Concrete Reports
Certified Ready-Mix Forms
- Contact Report 2013 - Ready-Mix (2163)*
*Check For New Sampling Requirements
Example of Site Map
- Contact Report 2013 - Addendum Ready-Mix Paving
- JMF Concrete Aggregate Worksheet (21764)
- Concrete Batching Report (2152)
- Ready-Mix Producer Diary
- Ready-Mix Agency Diary
Ready-Mix Plant Workbooks
- Concrete Ready-Mix Plant QC Workbook - revised 11/2012
- Producer Diary
- Batching Report (2152)
- Moisture Chart
- Coarse and Fine Aggregate Worksheets (21763)
- Weekly Concrete Aggregate Report (2449)
This computerized workbook includes:
- Concrete Ready-Mix Plant QA Workbook - revised 11/2012
- Agency Diary
- Coarse and Fine Aggregate Worksheets (21763)
- Weekly Certified Ready-Mix Plant Report (24143)
This computerized workbook includes:
Ready-Mix Quality Control Charts
- Moisture Content
- Sand – QC Chart
- CA-15 – QC Chart
- CA-35 – QC Chart
- CA-50 – QC Chart
- CA-60 – QC Chart
- CA-70 – QC Chart
- CA-80 – QC Chart
- Blank – QC Chart (*.pdf)
- JMF Moving Average Summary
Low Slump Concrete Forms
Pre-bag 3U18
Submit copies of the following forms to the Concrete Engineering Unit:
- Weekly Concrete Reports (Form 2448)
- Weekly Certified Ready-Mix Plant Reports (Form 24143)
- All change orders and supplemental agreements regarding concrete issues.
- All Aggregate Test Reports
- Other reports that indicate failing concrete related materials.

