Ten miles of northbound Highway 169 between St. Peter and Le Sueur will be resurfaced and drainage will be improved to reduce erosion.

Traffic impacts

Summary of work

  • Resurfacing Hwy 169 northbound lanes for a smoother road surface
  • Replacing Hwy 169 northbound bridge over Robart’s Creek, just north of St. Peter
  • Culvert sediment clean out and replacement or repair
  • Sedimentation basin construction to capture sediment before it enters culverts
  • Upgrading guardrails
  • Adding high tension cable median barrier in locations to protect against median crossover head-to-head accidents
  • Grading to improve drainage patterns and roadway side slopes
  • Installing interchange lighting at the Hwy 169/Hwy 93 interchange in Le Sueur
  • Adding Dynamic Message Signs (DMS) to provide traveler information

Cost

  • $22.1 million