Route (Hwy or Interstate) |
Description |
Begin Date |
End Date |
2022 Construction Cost |
Total Construction Cost |
MnDOT District |
Hwy 1 |
Reclaim and resurface Hwy 1 east of Effie from Deer Lake to east junction of Hwy 65 |
July 2022 |
November 2022 |
$6,300,000 |
$6,300,000 |
1 |
Hwy 1 |
Replace culvert and construct turn lanes on Hwy 1 between Red Lake and Reservation Hwy 18 (excludes town of Redby) |
June 2022 |
July 2022 |
$2,200,000 |
$2,200,000 |
2 |
Hwy 1, Hwy 53, Hwy 73 |
Culvert work on Hwys 1 and 73 in Itasca and St. Louis Counties |
June 2020 |
June 2022 |
$50,000 |
$8,000,000 |
1 |
Hwy 2 |
Resurface Hwy 2 westbound lanes between Crookston and Fisher, with additional turn lane improvements on eastbound and westbound lanes between Crookston and 4 miles west of Fisher |
July 2022 |
August 2022 |
$2,800,000 |
$2,800,000 |
2 |
Hwy 2 |
Replace concrete pavement with bituminous on Hwy 2 EB lanes between Fosston and Erskine; and WB lanes in McIntosh. Resurface and restripe Hwy 2 in Fosston. |
May 2022 |
October 2022 |
$17,000,000 |
$17,000,000 |
2 |
Hwy 2, Hwy 71, Hwy 197 |
Sealcoat on Hwy 2 east of Bemidji, Hwy 71 south of Bemidji, and Hwy 197/Washington Ave S |
May 2022 |
August 2022 |
$1,400,000 |
$1,400,000 |
2 |
Hwy 3 |
Construct trail on Hwy 3 from Willow St to 205th St in Farmington |
July 2022 |
November 2022 |
$280,000 |
$280,000 |
Metro |
Hwy 3 |
Resurface the road; construct roundabout at CR 66; update drainage, on Hwy 3 in Farmington and Empire Twp |
July 2022 |
November 2022 |
$2,600,000 |
$2,600,000 |
Metro |
Hwy 3 |
Repair bridges on Hwy 3 at George St and Union Pacific Railroad Bridge in St Paul |
May 2022 |
August 2022 |
$1,900,000 |
$1,900,000 |
Metro |
Hwy 4 |
Resurface 9 miles of Hwy 4 from the north side of Cosmos to CR 23 |
June 2022 |
August 2022 |
$4,800,000 |
$4,800,000 |
8 |
Hwy 4 |
Construct trail along Hwy 4 from 2nd Ave SW to Birch St in Trimont |
May 2022 |
November 2022 |
$109,000 |
$109,000 |
7 |
Hwy 6 |
Resurface Hwy 6 from Cass CR 4 to Hwy 200 in Remer |
June 2022 |
September 2022 |
$2,278,000 |
$2,278,000 |
3 |
Hwy 9 |
Replace Hwy 9 bridge over the Mustinka River near Norcross, grade and resurface |
June 2022 |
August 2022 |
$1,000,000 |
$1,000,000 |
4 |
Hwy 9 |
Install bump-outs and a mid-block pedestrian crossing along Hwy 9 in New London; add dedicated turn lanes at the Country Stop; replace portions of the retaining wall along the Mill Pond bridge |
July 2022 |
October 2022 |
$750,000 |
$750,000 |
8 |
Hwy 10 |
Repair frontage road along Hwy 10 in Detroit Lakes |
June 2022 |
June 2022 |
$700,000 |
$700,000 |
4 |
Hwy 10 |
Repair or replace bridges on Hwy 10 from east of Ferry St to just west of 7th Ave in Anoka |
March 2022 |
November 2023 |
$25,000,000 |
$48,000,000 |
Metro |
Hwy 10 |
Install cable median barrier on Hwy 10 from Benton CR 40 north of Rice to 66th St north of Sauk Rapids |
May 2022 |
June 2022 |
$1,300,000 |
$1,300,000 |
3 |
Hwy 10 |
Replace bridge (box culvert) under Hwy 10 west of Benton CR 33 near Sauk Rapids |
June 2022 |
September 2022 |
$1,500,000 |
$1,500,000 |
3 |
Hwy 11 |
Replace box culvert on Hwy 11 located 3 miles east of Roseau |
September 2022 |
October 2022 |
$520,000 |
$520,000 |
2 |
Hwy 12 |
Resurface Hwy 12 from 6th Ave in Howard Lake to east of Wright CR 110 in Montrose |
August 2022 |
October 2022 |
$3,100,000 |
$3,100,000 |
3 |
Hwy 12, Hwy 40 |
Multiyear project: realign Hwy 12 and reconstruct Hwy 40 to facilitate a new railroad line on the west side of Willmar |
July 2019 |
July 2022 |
$65,000 |
$35,300,000 |
8 |
Hwy 12, Hwy 68, Hwy 23, Hwy 22, Hwy 14 |
Update sidewalks, ramps and driveways in Canby, Clara City, Litchfield, Tyler, and Willmar, to meet ADA standards |
May 2021 |
August 2022 |
$1,000 |
$1,500,000 |
8 |
Hwy 13 |
Construct a roundabout at CR13/CR 8 in Cedar Lake Twp to coincide with the Hwy 13 paving project |
May 2022 |
November 2022 |
$1,600,000 |
$1,600,000 |
Metro |
Hwy 13 |
Construct interchange and frontage roads; construct, modify or remove bridges on Hwy 13 between 901B and Quentin Ave in Savage |
May 2022 |
November 2023 |
$18,000,000 |
$32,200,000 |
Metro |
Hwy 13 |
Resurface the road; construct left-turn lanes and pave shoulders on Hwy 13 between Hwy 19 in Cedar Lake Twp and Hwy 282 in Spring Lake Twp |
May 2022 |
October 2022 |
$10,000,000 |
$10,000,000 |
Metro |
Hwy 13 |
Repair/replace drainage; install new signals to meet modern ADA standards |
July 2022 |
September 2022 |
$800,000 |
$800,000 |
Metro |
Hwy 14 |
Expand 12.5 miles of Hwy 14 from two lanes to four lanes between Dodge Center and Owatonna |
April 2022 |
July 2022 |
$7,000,000 |
$108,000,000 |
6 |
Hwy 14 |
Construct Hwy 14 intersection safety improvements at Olmsted CR 3, CR 44 and 7th St NW, and install high-tension cable barrier from Byron to Rochester |
August 2022 |
October 2022 |
$2,560,000 |
$2,560,000 |
6 |
Hwy 14 |
Resurface 5 miles of Hwy 14 from Olmsted CR 36/Marion Rd to Olmsted CR 19 at Chester |
September 2022 |
October 2022 |
$4,300,000 |
$4,300,000 |
6 |
Hwy 14 |
Reconstruct Hwy 14 from a 2-lane to a 4-lane from CR 37 at New Ulm to Nicollet; bypass the City of Courtland; construct 3 new interchange bridges, replace 5 bridges; lighting, install camera and vehicle counting equipment, improve pedestrian crossings, install snow fence |
March 2022 |
November 2023 |
$30,000,000 |
$86,900,000 |
7 |
Hwy 14 |
Construct a reduced conflict intersection and lighting to improve safety at the Hwy 14/CR 56 intersection in Eagle Lake |
May 2022 |
June 2022 |
$1,100,000 |
$1,100,000 |
7 |
Hwy 14 |
Resurface Hwy 14 from Hwy 71 near Sanborn to Springfield; improve pedestrian crossings, lighting and signal improvements |
May 2022 |
August 2022 |
$5,000,000 |
$5,000,000 |
7 |
Hwy 14 |
Rehabilitate the New Ulm Spring roadside parking area on Hwy 14 near New Ulm |
April 2022 |
September 2022 |
$940,000 |
$940,000 |
7 |
Hwy 14, Hwy 22, Hwy 169 |
Add cameras and vehicle counting equipment for incident management and future automotive technology on Hwy 22 Hwy 14 and Hwy 169 |
April 2022 |
October 2022 |
$2,330,000 |
$2,330,000 |
7 |
Hwy 14, Hwy 68, Hwy 23, Hwy 22, Hwy 12 |
Update sidewalks, ramps and driveways in Canby, Clara City, Litchfield, Tyler, and Willmar, to meet ADA standards |
May 2021 |
August 2022 |
$1,000 |
$1,500,000 |
8 |
Hwy 15 |
Reconstruct road and upgrade sidewalks on Hwy 15 from south of railroad crossing to Hwy 55 in Kimball |
April 2022 |
July 2022 |
$2,300,000 |
$2,300,000 |
3 |
Hwy 15 |
Resurface Hwy 15 from Madelia to Watonwan/Brown County line; repair 2 bridges; improve lighting; install snow fence |
July 2022 |
November 2022 |
$3,900,000 |
$3,900,000 |
7 |
Hwy 15, Hwy 60 |
Resurface Hwy 15 EB and WB lanes from the Hwy 15/60 interchange south of Madelia to the Hwy 15/60 interchange north of Madelia; lighting, improve drainage, update guardrail, repair 5 bridges |
April 2022 |
October 2023 |
$14,000,000 |
$26,600,000 |
7 |
Hwy 19 |
Repave 1 mile of Hwy 19 from Hwy 20 to Almond St in Cannon Falls, and update signals, lighting and accessibility |
April 2022 |
July 2022 |
$2,200,000 |
$2,200,000 |
6 |
Hwy 19 |
Replace box culvert under Hwy 19, just east of Winthrop; reconstruct short section of pavement |
August 2022 |
October 2022 |
$1,084,000 |
$1,084,000 |
7 & 8 |
Hwy 19 |
Adjust roadway profile on Hwy 19 between the Minnesota River bridge and the rail bridge near Henderson by extending the lowest point of Hwy 19 to offset impacts when Hwy 93 is raised; tree clearing |
July 2022 |
October 2022 |
$2,700,000 |
$2,700,000 |
7 |
Hwy 19 |
Repair and resurface bridge on Hwy 19 over the Redwood River in Redwood Falls |
May 2022 |
September 2022 |
$2,000,000 |
$2,000,000 |
8 |
Hwy 19 |
Remove bridge 4 miles southwest of Morton on Old Hwy 19 |
October 2021 |
June 2022 |
$160,000 |
$790,000 |
8 |
Hwy 21 |
Resurface Hwy 21 from Hwy 99 to Hwy 13; replace culverts, add centerline and shoulder rumble strips |
August 2022 |
October 2022 |
$3,500,000 |
$3,500,000 |
7 |
Hwy 22 |
Resurface Hwy 22 in Glencoe from Hwy 212 to Cedar Ave |
July 2022 |
October 2022 |
$3,000,000 |
$3,000,000 |
8 |
Hwy 22, Hwy 14, Hwy 169 |
Add cameras and vehicle counting equipment for incident management and future automotive technology on Hwy 22 Hwy 14 and Hwy 169 |
April 2022 |
October 2022 |
$2,330,000 |
$2,330,000 |
7 |
Hwy 22, Hwy 23, Hwy 68, Hwy 14, Hwy 12 |
Update sidewalks, ramps and driveways in Canby, Clara City, Litchfield, Tyler, and Willmar, to meet ADA standards |
May 2021 |
August 2022 |
$1,000 |
$1,500,000 |
8 |
Hwy 23 |
Construct new road connection from Hwy 23 to 4th St in Duluth and cemetery restoration |
May 2021 |
November 2022 |
$1,800,000 |
$1,800,000 |
1 |
Hwy 23 |
Resurface and replace/repair pipes on Hwy 23 from Foley to Milaca; reconstruct and add roundabout on Hwy 23 in Foley |
May 2022 |
November 2022 |
$16,700,000 |
$16,700,000 |
3 |
Hwy 23 |
Expand Hwy 23 to four lanes from Stearns CR 33 in Paynesville to Hwy 22/Grant Ave SW in Richmond |
April 2022 |
November 2023 |
$20,000,000 |
$41,800,000 |
3 |
Hwy 23, Hwy 68, Hwy 22, Hwy 14, Hwy 12 |
Update sidewalks, ramps and driveways in Canby, Clara City, Litchfield, Tyler, and Willmar, to meet ADA standards |
May 2021 |
August 2022 |
$1,000 |
$1,500,000 |
8 |
Hwy 25 |
Improve the Hwy 25/CR 20 intersection in Watertown |
June 2022 |
September 2022 |
$630,000 |
$630,000 |
Metro |
Hwy 27 |
Reconstruct and improve Hwy 27 between I-94 in Douglas County and Hwy 71 in Todd County; replace four bridges, reconstruct and widen road and improve access |
May 2022 |
November 2022 |
$19,500,000 |
$19,500,000 |
3 |
Hwy 29, Hwy 55 |
Construct Hwy 29 overpass spanning Hwy 55 in Glenwood, includes new bridge, resurfacing and roundabouts |
July 2021 |
October 2022 |
$11,500,000 |
$13,800,000 |
4 |
Hwy 30 |
Reconstruct Hwy 30 in Rushford from west city limits to Hwy 43 |
April 2022 |
September 2022 |
$481,000 |
$481,000 |
6 |
Hwy 33 |
Construct reduced conflict intersection at Hwy 33/Gillette Rd in Cloquet |
August 2022 |
October 2022 |
$1,000,000 |
$1,000,000 |
1 |
Hwy 33, Hwy 45, Hwy 210 |
Chip seal repair on Hwys 45, 33, and 210 |
May 2022 |
July 2022 |
$2,000,000 |
$2,000,000 |
1 |
I-35 |
Install tire anomaly detection system on northbound I-35 at Clarks Grove Weigh Station |
TBD |
TBD |
$250,000 |
$250,000 |
6 |
I-35 |
Resurface I-35 concrete pavement near Barnum |
June 2022 |
October 2022 |
$9,500,000 |
$9,500,000 |
1 |
I-35, I-35W, Hwy 61 |
Districtwide concrete pavement repair |
June 2022 |
TBD |
$5,500,000 |
$5,500,000 |
Metro |
I-35, I-535, Hwy 53 |
Construct Twin Ports Interchange, bridge replacement at I-35, I-535 and Hwy 53 in Duluth |
October 2020 |
November 2023 |
$101,000,000 |
$343,000,000 |
1 |
I-35E, I-94 |
Repair and resurface concrete pavement; Resurface ramps and frontage roads, repair bridges; fix drainage; repair various sidewalks and make ADA improvements |
July 2021 |
October 2022 |
$13,000,000 |
$27,000,000 |
Metro |
I-35W |
Install stormwater holding cavern system on I-35W in Minneapolis |
August 2019 |
June 2023 |
$15,000,000 |
$54,400,000 |
Metro |
I-35W |
Landscaping along I-35W |
March 2022 |
July 2022 |
$1,000,000 |
$1,000,000 |
Metro |
I-35W, I-35, Hwy 61 |
Districtwide concrete pavement repair |
June 2022 |
TBD |
$5,500,000 |
$5,500,000 |
Metro |
Hwy 36 |
Construct an interchange at Hwy 36/Manning Ave (Washington County-led project) |
May 2021 |
November 2022 |
$11,000,000 |
$22,000,000 |
Metro |
Hwy 36 |
Realign south frontage road west of Osgood Ave (Washington County-led project) |
May 2022 |
November 2022 |
$510,000 |
$510,000 |
Metro |
Hwy 36 |
Improve trail and accessibility on the frontage road on Hwy 35 along 60th St/Neal Ave in Oak Park Heights |
May 2022 |
July 2022 |
$300,000 |
$300,000 |
Metro |
Hwy 36 |
Relocate the south frontage road on Norell Ave from Hwy 36 to 58th St N (City Oak Park Heights-led project) |
May 2022 |
October 2022 |
$1,300,000 |
$1,300,000 |
Metro |
Hwy 36 |
Landscape interchange at Manning Ave/CR 15 in Lake Elmo/Oak Park Heights (Washington County-led project) |
August 2022 |
September 2022 |
$150,000 |
$150,000 |
Metro |
Hwy 36 |
Replace signals on Hwy 36 at Hamline Ave |
September 2022 |
November 2022 |
$672,000 |
$672,000 |
Metro |
Hwy 36 |
Resurface the road; update drainage and improve intersection to meet ADA standards, on Hwy 36 between east of Edgerton St in Maplewood and just west of Greeley Ave in Stillwater |
May 2022 |
September 2022 |
$17,400,000 |
$17,400,000 |
Metro |
Hwy 37 |
Construct roundabout at Hwy 37/CR 7 intersection in St. Louis County |
June 2022 |
October 2022 |
$3,100,000 |
$3,100,000 |
1 |
Hwy 40, Hwy 12 |
Multiyear project: realign Hwy 12 and reconstruct Hwy 40 to facilitate a new railroad line on the west side of Willmar |
July 2019 |
July 2022 |
$65,000 |
$35,300,000 |
8 |
Hwy 41, Hwy 169 |
Landscape interchange at Hwy 169/Hwy 41/CR 78 in Jackson Twp |
May 2022 |
June 2025 |
$131,000 |
$131,000 |
Metro |
Hwy 43 |
Reconstruct 1 mile of Hwy 43 from Hwy 61 to Sarnia in Winona, includes 4 roundabouts |
April 2022 |
November 2022 |
$17,300,000 |
$17,300,000 |
6 |
Hwy 43 |
Reconstruct 22 miles of Hwy 43 from Rushford to Mabel and replace culverts |
April 2022 |
October 2022 |
$13,000,000 |
$13,000,000 |
6 |
Hwy 45, Hwy 33, Hwy 210 |
Chip seal repair on Hwys 45, 33, and 210 |
May 2022 |
July 2022 |
$2,000,000 |
$2,000,000 |
1 |
Hwy 51 |
Install cable median barrier on Hwy 51 between County Road C in Roseville and I-694 in Shoreview; lengthen turn lanes at CR C, C2 and Lydia Ave and repair pipe |
May 2022 |
June 2022 |
$984,000 |
$984,000 |
Metro |
Hwy 52 |
Reconstruct southbound Hwy 52 south of Cannon Falls to north of Zumbrota, includes 2 bridge replacements and safety improvements |
May 2022 |
November 2023 |
$24,000,000 |
$69,700,000 |
6 |
Hwy 52 |
Construct crossovers; temporarily widen shoulders on Hwy 52 between north of CR 86 in Hampton Twp and north of CR 42 in Rosemount for upcoming 2023 concrete pavement project
|
May 2022 |
November 2022 |
$4,000,000 |
$4,000,000 |
Metro |
Hwy 53 |
Repair manhole covers, install turf, and install final striping on Hwy 53 in International Falls |
July 2020 |
June 2022 |
$50,000 |
$17,380,000 |
1 |
Hwy 53 |
Landscape along Hwy 53 in International Falls |
May 2022 |
July 2022 |
$280,000 |
$280,000 |
1 |
Hwy 53 |
Reconfigure intersection of Hwy 53 and P&H Rd at Komatsu in Virginia |
June 2022 |
October 2022 |
$460,000 |
$460,000 |
1 |
Hwy 53 |
Replace signs along Hwy 53 from Duluth to International Falls |
September 2022 |
August 2023 |
$2,600,000 |
$3,600,000 |
1 |
Hwy 53, Hwy 1, Hwy 73 |
Culvert work on Hwys 1 and 73 in Itasca and St. Louis Counties |
June 2020 |
June 2022 |
$50,000 |
$8,000,000 |
1 |
Hwy 53, Hwy 194 |
Construct reduced conflict intersection at Hwy 194 and Hwy 53 in Hermantown |
May 2022 |
September 2022 |
$2,500,000 |
$2,500,000 |
1 |
Hwy 53, I-35, I-535 |
Construct Twin Ports Interchange, bridge replacement at I-35, I-535 and Hwy 53 in Duluth |
October 2020 |
November 2023 |
$101,000,000 |
$343,000,000 |
1 |
Hwy 55 |
Resurface and widen shoulders on Hwy 55 from Elbow Lake to Barrett |
July 2022 |
October 2022 |
$9,000,000 |
$9,000,000 |
4 |
Hwy 55 |
Resurface Hwy 55 from MN/ND border to southern jct of CR 11 in Wendell; replace four box culverts |
May 2022 |
July 2022 |
$10,300,000 |
$10,300,000 |
4 |
Hwy 55 |
Repair concrete pavement; redeck bridges; replace signs; update drainage and ADA to meet current standards on Hwy 55 between east of 13th Ave and north of 32nd St in Minneapolis |
April 2022 |
November 2022 |
$15,900,000 |
$15,900,000 |
Metro |
Hwy 55 |
Repair concrete and bridges; resurface road; update drainage and lighting; add new trail between Mendota Heights Rd and Blue Gentian Rd; on Hwy 55 between the north end of Mendota Bridge over Bloomington Rd in Minneapolis and Hwy 52 in Inver Grove Heights |
April 2022 |
October 2022 |
$28,900,000 |
$28,900,000 |
Metro |
Hwy 55 |
Install eastbound left-turn lane and westbound right turn lane; add acceleration lane and update drainage on Hwy 55 at Doyle Path in Rosemount |
July 2022 |
October 2022 |
$1,700,000 |
$1,700,000 |
Metro |
Hwy 55 |
Repave road; install guardrail; update drainage, signals and ADA to meet current standards on Hwy 55 between north of 32nd St and Hwy 62 in Minneapolis |
June 2022 |
November 2022 |
$11,300,000 |
$11,300,000 |
Metro |
Hwy 55 |
Resurface Hwy 55 from Meeker/Stearns county line, between Watkins and Kimball, to Brown Ave in Annandale, includes sidewalks in New Haven and Kimball |
August 2022 |
October 2022 |
$5,100,000 |
$5,100,000 |
3 |
Hwy 55 |
Remove remainder of bridge tunnel; resurface road and update drainage and utilities (new bridge is already in place) |
September 2022 |
October 2022 |
$2,100,000 |
$2,100,000 |
Metro |
Hwy 55, Hwy 29 |
Construct Hwy 29 overpass spanning Hwy 55 in Glenwood, includes new bridge, resurfacing and roundabouts |
July 2021 |
October 2022 |
$11,500,000 |
$13,800,000 |
4 |
Hwy 56 |
Relocate intersection and reconstruct CR 88 in Randolph Twp (Dakota County-led project) |
May 2022 |
November 2023 |
$734,000 |
$734,000 |
Metro |
Hwy 57 |
Reconstruct Hwy 57 pavement, add two roundabouts in Kasson from Dodge CR 34 to 11th St NE |
May 2022 |
November 2022 |
$7,200,000 |
$7,200,000 |
6 |
Hwy 59 |
Resurface Hwy 59 between Brooks and 4 miles north of Plummer |
September 2022 |
October 2022 |
$3,600,000 |
$3,600,000 |
2 |
Hwy 60 |
Resurface Hwy 60 from Hwy 52 to Hwy 63 in Zumbro Falls, includes 1 bridge and 7 culvert replacements and reconstruction in Zumbro Falls |
May 2022 |
November 2022 |
$10,400,000 |
$10,400,000 |
6 |
Hwy 60 |
Construct a right-in/right-out raised median on Hwy 60 at 1st St S in Windom; striping |
April 2022 |
June 2022 |
$80,000 |
$80,000 |
7 |
Hwy 60 |
Construct WB Hwy 60 right-turn lane in Windom near 24th St |
June 2022 |
August 2022 |
$250,000 |
$250,000 |
7 |
Hwy 60, Hwy 15 |
Resurface Hwy 15 EB and WB lanes from the Hwy 15/60 interchange south of Madelia to the Hwy 15/60 interchange north of Madelia; lighting, improve drainage, update guardrail, repair 5 bridges |
April 2022 |
October 2023 |
$14,000,000 |
$26,600,000 |
7 |
Hwy 61 |
Replace Silver Creek Bridge, construct a new bridge and rehabilitate current bridge at Stewart River on Hwy 61 near Two Harbors in Lake County |
September 2021 |
October 2023 |
$7,000,000 |
$12,677,000 |
1 |
Hwy 61 |
Construct Hwy 61 roundabout at Hwy 316 near Welch in Goodhue County, and construct reduced conflict intersection at Hwy 61 and Goodhue CR 18 |
July 2022 |
November 2022 |
$4,900,000 |
$4,900,000 |
6 |
Hwy 61 |
Resurface 26.7 miles of Hwy 61 southbound from Wabasha to Minnesota City, construct a reduced conflict intersection at Hwy 42, replace 6 bridge approach panels |
April 2022 |
October 2022 |
$19,100,000 |
$19,100,000 |
6 |
Hwy 61 |
Resurface the bridge deck on Hwy 61 over the Mississippi River in Hastings |
August 2022 |
September 2022 |
$4,000,000 |
$4,000,000 |
Metro |
Hwy 61 |
Improve Hwy 61 signals in Goodview |
September 2022 |
October 2022 |
$460,000 |
$460,000 |
6 |
Hwy 61, I-35, I-35W |
Districtwide concrete pavement repair |
June 2022 |
TBD |
$5,500,000 |
$5,500,000 |
Metro |
Hwy 62 |
Replace signs and sign panels on Hwy 62 between I-494 in Eden Prairie and Penn Ave in Richfield/Minneapolis |
May 2022 |
August 2022 |
$650,000 |
$650,000 |
Metro |
Hwy 65 |
Resurface 42.5 miles of pavement, repair culverts, and install guardrail on Hwy 65 from east junction Hwy 1 to .5 miles south of CR 8 in Itasca and Koochiching Counties |
June 2022 |
December 2022 |
$11,100,000 |
$11,100,000 |
1 |
Hwy 65 |
Reconstruct Hwy 65 from Newton Ave to the Shell Rock River Bridge in Albert Lea |
April 2022 |
October 2022 |
$13,400,000 |
$13,400,000 |
6 |
Hwy 65 |
Repair Hwy 65/3rd Ave bridge over the Mississippi River in Minneapolis |
May 2020 |
August 2023 |
$50,000,000 |
$125,000,000 |
Metro |
Hwy 65 |
Landscaping along Hwy 65 |
March 2022 |
July 2022 |
$137,000 |
$137,000 |
Metro |
Hwy 65 |
Install cable median barrier on Hwy 65 between Cambridge and East Bethel |
July 2022 |
September 2022 |
$1,500,000 |
$1,500,000 |
3 |
Hwy 65, Hwy 23 |
Replace Hwy 65 bridge over the Snake River south of Division St in Mora, includes multi-use trail |
May 2022 |
November 2022 |
$5,100,000 |
$5,100,000 |
3 |
Hwy 68 |
Widen shoulders on 11 miles of Hwy 68 from N Grant St in Minneota to the Redwood River in Marshall; replace two culverts along route and three culverts near Porter |
May 2022 |
September 2022 |
$9,200,000 |
$9,200,000 |
8 |
Hwy 68, Hwy 23, Hwy 22, Hwy 14, Hwy 12 |
Update sidewalks, ramps and driveways in Canby, Clara City, Litchfield, Tyler, and Willmar, to meet ADA standards |
May 2021 |
August 2022 |
$1,000 |
$1,500,000 |
8 |
Hwy 71 |
Resurface and intersection revisions that include a roundabout and 7 reduced conflict intersections (J turns) on Hwy 71 north of Bemidji between Hwy 197 and East Movil Lake Rd |
May 2022 |
October 2022 |
$14,300,000 |
$14,300,000 |
2 |
Hwy 71 |
Replace Hwy 71 bridges over Drayer Creek and Harris Creek in Browerville |
June 2022 |
August 2022 |
$1,400,000 |
$1,400,000 |
3 |
Hwy 71 |
Resurface Hwy 71 in Olivia from Viking Dr to jct of Hwy 212 and Hwy 71; upgrade pedestrian crossings; install bypass lane at Viking Dr; repair drainage |
July 2022 |
October 2022 |
$1,500,000 |
$1,500,000 |
8 |
Hwy 73 |
Replace culvert 0.5 miles south of Beauty Mountain Rd and replace Hwy 73 bridge at CR 16 in St. Louis County |
August 2022 |
October 2023 |
$1,000,000 |
$2,300,000 |
1 |
Hwy 73, Hwy 1, Hwy 53 |
Culvert work on Hwys 1 and 73 in Itasca and St. Louis Counties |
June 2020 |
June 2022 |
$50,000 |
$8,000,000 |
1 |
Hwy 73, Hwy 210 |
Reconstruct Hwy 210 and Hwy 73 in Cromwell |
May 2022 |
October 2022 |
$3,700,000 |
$3,700,000 |
1 |
Hwy 75 |
Resurface Hwy 75 between Crookston and Euclid |
May 2022 |
May 2022 |
$960,000 |
$960,000 |
2 |
Hwy 75 |
Resurface Hwy 75 from just north of Hwy 28 near Graceville to CR 11 in Dumont |
September 2022 |
October 2022 |
$2,200,000 |
$2,200,000 |
4 |
Hwy 75, Hwy 175 |
Resurface and pedestrian improvements on Hwy 75 and Hwy 175 in Hallock |
July 2022 |
October 2022 |
$3,200,000 |
$3,200,000 |
2 |
Hwy 77 |
Repave road; replace bridge joints; extend right turn lane from northbound Hwy 77 ramp to Old Shakopee Rd; update drainage and trail to meet current ADA standards on Hwy 77 between the north end of the Minnesota River Bridge in Bloomington and Lake Nokomis Pkwy in Minneapolis |
June 2022 |
November 2022 |
$14,400,000 |
$14,400,000 |
Metro |
Hwy 77 |
Replace signs on Hwy 77 between 138th St in Apple Valley and CR 1/Old Shakopee Rd in Bloomington |
May 2022 |
September 2022 |
$570,000 |
$570,000 |
Metro |
Hwy 77 |
Replace lighting on Hwy 77 at McAndrews Rd/127th St in Apple Valley |
July 2022 |
September 2022 |
$380,000 |
$380,000 |
Metro |
Hwy 86 |
Reconstruct Hwy 86 in Lakefield from 9th Ave S to Funk Ave; improve sidewalks; add lighting |
April 2022 |
November 2022 |
$7,300,000 |
$7,300,000 |
7 |
Hwy 87 |
Reconstruct Hwy 87 with "complete streets" design in Frazee, from Hwy 10 to Otter Tail River bridge |
May 2022 |
October 2022 |
$4,500,000 |
$4,500,000 |
4 |
I-35 |
Install fiber optic cable along I-35 from Cloquet to Duluth |
May 2022 |
September 2022 |
$780,000 |
$780,000 |
1 |
I-90 |
Resurface 8.6 miles of I-90 eastbound from 2.5 miles east of Mower CR 1 to 0.9 miles east of Hwy 63 in Olmsted County, repair four bridges, resurface High Forest Rest Area parking lot |
April 2022 |
August 2022 |
$7,000,000 |
$7,000,000 |
6 |
I-90 |
Resurface EB I-90 lanes from South Dakota state line to Beaver Creek and WB lanes from South Dakota State line to CR 11; install guardrail and lighting |
April 2022 |
November 2022 |
$18,300,000 |
$18,300,000 |
7 |
I-90 |
Resurface EB I-90 from Sherburn to Fairmont; update guardrail, improve drainage, update lighting at Hwy 4 and Hwy 15 interchanges |
May 2022 |
August 2022 |
$6,200,000 |
$6,200,000 |
7 |
I-90 |
Pave parking area at I-90 westbound Des Moines rest area; improve pedestrian crossings and lighting |
April 2022 |
August 2022 |
$2,600,000 |
$5,100,000 |
7 |
I-90 |
Install structural snow fence on westbound I-90 from 1.9 miles east of Hwy 42 to 0.1 miles west of Olmsted CR 10 |
TBD |
TBD |
$408,000 |
$408,000 |
6 |
Hwy 92 |
Resurface and widen shoulders on Hwy 92 between Clearwater CR 35 and Hwy 200 in Zerkel |
May 2022 |
September 2022 |
$7,300,000 |
$7,300,000 |
2 |
I-94 |
Install snow fence at various locations on I-94 from Downer to Fergus Falls |
September 2022 |
October 2022 |
$1,500,000 |
$1,500,000 |
4 |
I-94 |
Reconstruct and add lanes on I-94 between Clearwater and Monticello |
August 2019 |
June 2022 |
$21,000,000 |
$104,000,000 |
3 |
I-94 |
Construct noise wall along north side of WB I-94 in St Michael |
April 2022 |
June 2022 |
$250,000 |
$250,000 |
3 |
I-94 |
Reconstruct and add lanes on I-94 from St Michael to Albertville; reconstruct Hwy 241 bridge and EB Wright CR 19 bridge |
June 2022 |
August 2022 |
$6,000,000 |
$71,000,000 |
3 |
I-94 |
Pave I-94 shoulders; construct crossovers; update transportation management system and drainage to prepare for larger project in 2023-2024 |
July 2022 |
November 2022 |
$9,200,000 |
$9,200,000 |
Metro |
I-94 |
Repave frontage roads and ramps, repair bridges and modify signals to meet current ADA standards on I-94 from Western Ave to Hwy 52 and on I-35E from Kellogg Blvd to University Ave in St Paul |
April 2022 |
July 2022 |
$3,800,000 |
$3,800,000 |
Metro |
I-94 |
Improve trail and accessibility on I-94 at English St and Arcade St in St Paul |
May 2022 |
July 2022 |
$150,000 |
$150,000 |
Metro |
I-94 |
Improve sidewalk and accessibility on I-94, at the St Anthony and Rovoux St intersection from 94 to Kellogg Blvd |
May 2022 |
July 2022 |
$700,000 |
$700,000 |
Metro |
I-94 |
Replace pedestrian bridge on I-94 parallel to Maple St in St Paul |
May 2022 |
September 2022 |
$530,000 |
$530,000 |
Metro |
I-94 |
Construct new inspection building at I-94 Red River Weigh Station |
May 2022 |
August 2022 |
$600,000 |
$600,000 |
4 |
I-94 |
Districtwide guardrail replacements |
July 2022 |
August 2022 |
$500,000 |
$500,000 |
4 |
I-94 |
Resurface bridges on I-94 over retired rail line, west of the Hwy 23 interchange in St Cloud |
August 2022 |
October 2022 |
$2,200,000 |
$2,200,000 |
3 |
I-94 |
Update MnROAD facility along I-94 |
May 2022 |
June 2022 |
$4,200,000 |
$4,200,000 |
3 |
I-94, I-35E |
Repair and resurface concrete pavement; Resurface ramps and frontage roads, repair bridges; fix drainage; repair various sidewalks and make ADA improvements |
July 2021 |
October 2022 |
$13,000,000 |
$27,000,000 |
Metro |
Hwy 95 |
Repair drainage on Hwy 95 just south of Hwy 8 in Franconia |
October 2021 |
May 2022 |
$90,000 |
$497,000 |
Metro |
Hwy 95 |
Improve pedestrian and bicycle facilities on Chestnut St between Hwy 95 and Stillwater lift bridge in Stillwater (city of Stillwater-led pedestrian plaza) |
May 2022 |
October 2022 |
$2,200,000 |
$2,200,000 |
Metro |
Hwy 105 |
Resurface 11.5 miles of Hwy 105 from Iowa state line to south of Turtle Creek in Austin |
July 2022 |
November 2022 |
$2,500,000 |
$2,500,000 |
6 |
Hwy 108 |
Resurface Hwy 108 from I-94 to 9th Street in Pelican Rapids |
July 2022 |
September 2022 |
$2,200,000 |
$2,200,000 |
4 |
Hwy 123 |
Resurface pavement and install pedestrian improvements on Hwy 123 in Sandstone |
August 2021 |
July 2022 |
$1,700,000 |
$3,400,000 |
1 |
Hwy 135 |
Landscape along Hwy 135 in Biwabik |
September 2022 |
October 2022 |
$480,000 |
$480,000 |
1 |
Hwy 156 |
Repair retaining wall on Hwy 156 near Page St in St Paul |
June 2022 |
November 2022 |
$630,000 |
$630,000 |
Metro |
Hwy 169 |
Convert Hwy 169 to a freeway system between Hwy 10/101 and 197th Ave in Elk River, includes four interchanges |
April 2022 |
November 2024 |
$40,000,000 |
$130,000,000 |
3 |
Hwy 169 |
Resurface Hwy 169 from Elmore to Blue Earth; improve drainage and lighting |
April 2022 |
June 2022 |
$2,500,000 |
$2,500,000 |
7 |
Hwy 169 |
Install traffic management system, lighting and noise wall on Hwy 169 between Valley View Rd and Bren Rd in Edina |
May 2022 |
July 2022 |
$3,600,000 |
$3,600,000 |
Metro |
Hwy 169 |
Repair Hwy 169 bridge located near Center St in Mankato |
May 2022 |
June 2022 |
$400,000 |
$400,000 |
7 |
Hwy 169 |
Extend frontage road from Berkshire Ln to Bluff Dr and construct acceleration lane, on Hwy 169 to Bluff Dr in Sand Creek Twp |
June 2022 |
October 2022 |
$1,000,000 |
$1,000,000 |
Metro |
Hwy 169 |
Replace 2 bridges and 1 culvert on SB lanes of Hwy 169 between Hwy 22 and CR 76 north of St Peter |
July 2022 |
September 2022 |
$4,300,000 |
$4,300,000 |
7 |
Hwy 169 |
Install cable median barrier on Hwy 169 between 85th St in Brooklyn Park and West River Rd in Champlin |
September 2022 |
October 2022 |
$970,000 |
$970,000 |
Metro |
Hwy 169, Hwy 22, Hwy 14 |
Add cameras and vehicle counting equipment for incident management and future automotive technology on Hwy 22 Hwy 14 and Hwy 169 |
April 2022 |
October 2022 |
$2,330,000 |
$2,330,000 |
7 |
Hwy 169, Hwy 41 |
Landscape interchange at Hwy 169/Hwy 41/CR 78 in Jackson Twp |
May 2022 |
June 2025 |
$131,000 |
$131,000 |
Metro |
Hwy 194 |
Construct roundabout at Hwy 194 and Midway Rd in Hermantown and resurface 7 miles of Hwy 194 |
June 2022 |
August 2022 |
$4,000,000 |
$4,000,000 |
1 |
Hwy 194, Hwy 53 |
Construct reduced conflict intersection at Hwy 194 and Hwy 53 in Hermantown |
May 2022 |
September 2022 |
$2,500,000 |
$2,500,000 |
1 |
Hwy 200 |
Repair pavement and sidewalk, widen shoulders and construct turn lanes on Hwy 200 from Hwy 59 to east of Roy Lake |
May 2022 |
October 2022 |
$13,700,000 |
$13,700,000 |
4 |
Hwy 200 |
Chip seal repair on Hwy 200 in Itasca County |
July 2021 |
June 2022 |
$200,000 |
$3,122,000 |
1 |
Hwy 210, Hwy 45, Hwy 33 |
Chip seal repair on Hwys 45, 33, and 210 |
May 2022 |
July 2022 |
$2,000,000 |
$2,000,000 |
1 |
Hwy 210, Hwy 73 |
Reconstruct Hwy 210 and Hwy 73 in Cromwell |
May 2022 |
October 2022 |
$3,700,000 |
$3,700,000 |
1 |
Hwy 212 |
Construct reduced conflict intersection, upgrade pedestrian crossing, and install permanent snow fence in Glencoe at Hwy 212 and McLeod CR 1; construct reduced conflict intersection in Glencoe at Hwy 212 and Hwy 22/Chandler Ave |
May 2022 |
July 2022 |
$2,400,000 |
$2,400,000 |
8 |
Hwy 220 |
Signal Improvements on Hwy 220 in East Grand Forks at 14th St, and pedestrian improvements at 14th St, 17th St, and at Hwy 2 & 220 |
June 2022 |
July 2022 |
$698,000 |
$698,000 |
2 |
Hwy 263 |
Resurface Hwy 263 from Clark St in Ceylon to I-90, pave shoulders, lighting, update utilities, improve drainage and replace guardrail |
June 2022 |
October 2022 |
$9,600,000 |
$9,600,000 |
7 |
Hwy 301 |
Restore historic wall on Hwy 301 at Minnesota Correctional Facility in St Cloud |
August 2022 |
October 2022 |
$1,900,000 |
$1,900,000 |
3 |
Hwy 336 |
Repair concrete on both directions of Hwy 336 from Hwy 10 to I-94 |
May 2022 |
August 2022 |
$1,000,000 |
$1,000,000 |
4 |
Hwy 371 |
Install three reduced conflict intersections on Hwy 371 between Gull Lake Dam Rd and Green Gables Rd east of Gull Lake, Brainerd |
June 2022 |
September 2023 |
$6,000,000 |
$7,300,000 |
3 |
Hwy 371B |
Reconstruct road, upgrade signal and update sidewalk on Business Hwy 371 from Greenwood St to Joseph St; resurface Business Hwy 371 from 70th Ave in Barrows to Greenwood St in Brainerd |
May 2022 |
October 2022 |
$8,100,000 |
$8,100,000 |
3 |
Hwy 494 |
Replace and clean storm sewer at I-494 and Lake Rd in Woodbury |
July 2022 |
September 2022 |
$450,000 |
$450,000 |
Metro |
I-535 |
Maintain I-535 Blatnik Bridge in Duluth |
May 2022 |
September 2022 |
$6,900,000 |
$6,900,000 |
1 |
I-535, I-35, Hwy 53 |
Construct Twin Ports Interchange, bridge replacement at I-35, I-535 and Hwy 53 in Duluth |
October 2020 |
November 2023 |
$101,000,000 |
$343,000,000 |
1 |
Hwy 610 |
Install traffic management system on Hwy 610 between Hwy 169 in Brooklyn Park and East River Rd in Coon Rapids |
May 2022 |
July 2022 |
$950,000 |
$950,000 |
Metro |
I-694 |
Replace signals and remove the free right turn from Sliver Lake Rd to I-694 in New Brighton |
April 2022 |
June 2022 |
$850,000 |
$850,000 |
Metro |
Hwy 952A |
Repair multiple bridges on Hwy 952A; install clearform catchment systems on the underside of bridges |
April 2022 |
October 2022 |
$1,900,000 |
$1,900,000 |
Metro |
Multiple |
Clean and repair bridges districtwide |
June 2022 |
October 2022 |
$150,000 |
$150,000 |
8 |
Multiple |
Repair pavement cracks districtwide |
June 2022 |
October 2022 |
$500,000 |
$500,000 |
8 |
Multiple |
Replace signs districtwide |
August 2022 |
October 2022 |
$900,000 |
$900,000 |
8 |
N/A |
Repair historic Stone Arch Bridge in Minneapolis |
September 2022 |
September 2024 |
$5,000,000 |
$14,830,000 |
Metro |
Various |
Districtwide - replace loop detectors |
January 2022 |
June 2022 |
$75,000 |
$75,000 |
Metro |
Various |
Districtwide sign replacement |
April 2022 |
August 2022 |
$845,000 |
$845,000 |
7 |
Various |
Districtwide lighting - intersection and interchanges |
May 2022 |
September 2022 |
$660,000 |
$660,000 |
7 |
Various |
Districtwide sealcoating |
May 2022 |
October 2022 |
$500,000 |
$500,000 |
4 |
Various |
Crack repair at various locations districtwide |
May 2022 |
July 2022 |
$1,300,000 |
$1,300,000 |
1 |
Various |
Replace lighting at various locations districtwide |
May 2022 |
July 2022 |
$460,000 |
$460,000 |
1 |
Various |
Districtwide culvert repairs |
July 2022 |
September 2022 |
$450,000 |
$450,000 |
4 |
Various |
Install traffic cameras at various locations districtwide |
September 2022 |
November 2022 |
$405,000 |
$405,000 |
1 |
Various |
Districtwide resurfacing |
July 2022 |
September 2022 |
$7,992,000 |
$7,992,000 |
7 |
Various |
Districtwide - seal bridge deck cracks and joint repair |
TBD |
TBD |
$570,000 |
$570,000 |
6 |
Various |
Districtwide - rout and seal |
TBD |
TBD |
$790,000 |
$790,000 |
6 |
Various |
Districtwide concrete pavement repair |
TBD |
TBD |
$1,050,000 |
$1,050,000 |
6 |