Find out about studies and plans for potential projects below. Some projects on this list are already scheduled and work will begin in the near future. Learn about the planning process before a highway is built.

Find a project by highway number

Hwys 1 – 13

Hwy 7

Hwy 7 — Minnetonka

Description: Add a second left turn from Hwy 7 to Hopkins Crossroad and replace traffic signal.

Construction: May through September 2021

More information: mndot.gov/metro/projects/hwy7hopkinscrd

Hwy 8

Hwy 8 — Chisago County

Description: Safety and Mobility Improvement study to identified potential needs on Hwy 8 between I-35 and Co. Rd. 80 in Chisago County.

Status: Currently studying preliminary design

More information: chisagocounty.us/1115/Trunk-Highway-8

Hwy 8 — Wyoming and Chisago City

Description: Study identified possible future improvements to the Hwy 8 Corridor between Greenway Ave. North and Karmel Ave.

Status: Study completed. No projects have been funded or are currently planned.

More information: mndot.gov/metro/projects/hwy8study

Hwy 9

Hwy 9 - New London

Description: Addition of safety improvements for people who walk and bike

Status: Work begins in 2022
More information: mndot.gov/d8/projects/hwy23newlondon

Hwy 10

Hwy 10 Rum River Bridge replacement — Anoka

Description: Replace Hwy 10 bridge over the Rum River; Additional funding being sought to reconstruct Ferry St. (Hwy 47/Hwy 169) interchange and build auxiliary lanes from Ferry St. to 7th Ave.

Status: Currently in design, construction begins 2022

More information: mndot.gov/metro/projects/hwy10-anoka

Hwy 10 — Anoka

Description: Construct new interchange at Thurston Ave., build underpass at Fairoak Ave. and extend West Main St.; Remove all Hwy 10 access in project area.

Status: Spring 2021 through fall 2022

More information: clients.bolton-menk.com/hwy10

Hwy 10/Round Lake Blvd. interchange — Coon Rapids

Description: Replace signal system, realign NB Round Lake Blvd. to EB Hwy 10 ramp, repair bridges and resurface approach roads.

Status: Currently in design. Construction begins April 2021.

More information: mndot.gov/metro/projects/hwy10coonrapids

Hwy 10 project study — Elk River

Description: Upgrade to a freeway system
Status: Study completed 2012. No projects have been funded or planned.
More information: mndot.gov/d3/hwy10er

Hwy 10 — Elk River

Description: Reconstruct and improve Highway 10 from Xenia Avenue to 4th Street NW in Elk River, includes pedestrian sidewalks/trails and signal system upgrades.
Status: Construct 2021
More information: mndot.gov/d3/projects/h10elkriver

Hwy 10 in the cities of Anoka and Ramsey

Description: Corridor study identified needs

Status: Study complete. No projects have been funded or planned.

More information: mndot.gov/metro/projects/hwy10study

Hwy 10/75 Moorhead 11th St. Underpass

Description: Two grade separations of Highway 10/75 under the BNSF rail lines, paving, pedestrian accessibility improvements, utility replacements and signals.

Status: Planning

More information: mndot.gov/d4/projects/moorhead11thstunderpass

Hwy 12

Hwy 12 — Ortonville to Hwy 59

Description: Reclamation, shoulder widening, snow trap improvements, and box culvert replacements.

Status: Work begins 2021

More information: mndot.gov/d4/projects/hwy12

Hwy 12 — Orono to Independence

Description: Improve safety and reduce crashes along Hwy 12, install a center concrete barrier, and construct a roundabout

Status: Construction scheduled for spring through late fall 2021

More information: mndot.gov/metro/projects/hwy12-orono-independence

Hwy 13

Hwy 13 between Savage and Burnsville

Description: Study of Hwy 13 between Hwy 169 in Savage and Nicollet Ave. in Burnsville.

Status: Study in progress. Construction begins 2022.

More information: mndot.gov/metro/projects/hwy13savageburnsville

Hwy 13 Spring Lake & Cedar Lake Townships

Description: Resurface and reconstruct road between Hwy 19 in Cedar Lake Township to Hwy 282 in Spring Lake Township and add left turn lanes.

Status: 2022 construction.

More information: mndot.gov/metro/projects/hwy13-spring-lake-cedar

Hwys 14 – 30

Hwy 14

Hwy 14 New Ulm to Nicollet four-lane expansion

Description: Construct a four-lane divided highway from New Ulm to Nicollet (12.5-mile segment) and bypass the city of Courtland
Construction dates: 2022-2023
More information: mndot.gov/d7/projects/14newulmtonmankato/

Hwy 14 slope repair

Description: slope repair and stabilization of the roadway embankment
Construction dates: Begins 2020
More information: mndot.gov/d8/projects/hwy59hwy14slopes

Hwy 14 Drainage Repair near Chester

Description: Replace two drainage pipes and a box culvert
Construction dates: Letting begins early spring 2020, construction begins summer 2020
More information: mndot.gov/d6/projects/hwy14-drainage

Hwy 15

Hwy 15 Main Street – Downtown Hutchinson Reconstruction Project

Description: Reconstruction of Hwy 15/ Main Street from 2nd Ave. NW to 5th Ave. SW

Status: Construction begins 2020

More information: mndot.gov/d8/projects/hwy15downtownhutch

Hwy 19

Hwys 19 and 93 near Henderson

Description: Flood feasibility study to evaluate the bridges and approach roadways over the Minnesota River for Hwy 19, Hwy 93 and Sibley County Road 6.

Status: Study in progress. No projects have been funded or planned.

More information: mndot.gov/d7/projects/hwy19study

Hwys 19 Repaving in Cannon Falls

Description: Repaving, possible replacement of the traffic signal at the intersection of Hwy 19 and Hwy 20 along with ADA sidewalk improvements.

Construction dates: Begins in summer 2022

More information: mndot.gov/d6/projects/hwy19-repaving

Hwy 19/College Drive — Marshall

Description: Reconstruction of Hwy 19/College Drive from 4th Street to Bruce Street
Construction dates: Begins in 2025
More information: mndot.gov/d8/projects/hwy19marshall

Hwy 21

Hwy 21 - Shieldsville

Description: Hwy 21 resurfacing

Construction dates: 2021

More information: mndot.gov/d6/projects/hwy21-resurfacing-shieldsville

Hwy 22

Hwy 22 – Mapleton to Wells

Description: Resurface Hwy 22 from approximately a quarter of a mile south of Mapleton to the north city limits of Wells, including the Hwy 22/Hwy 109/Faribault County Road 29 intersection

Construction dates: 2023

More information: mndot.gov/d7/projects/hwy22mapleton-wells/

Hwy 23

Hwy 23 — Cottonwood to Granite Falls

Description: Resurfacing of Hwy 23, realignment of Lyon CR 9 in Cottonwood and construction of turn lanes
Construction dates:  Begins 2020
More information: mndot.gov/d8/projects/hwy23cottonwoodtogranite

Hwy 23 road safety audit — Foley to Milaca

Description: Hwy 23 Road Safety Audit report and findings between Foley and Milaca, includes the communities of Ronneby, Oak Park and Foreston.

Status: Published 2017

More information: mndot.gov/d3/projects/h23foleytomilaca

Hwy 23 — Gaps

Description: Expansion of Hwy 23 from two-lanes to four-lanes from New London to Paynesville and Paynesville to Richmond

Status: Work begins in 2021
More information: mndot.gov/d8/projects/hwy23gaps

Hwy 10, Hwy 23 — St. Cloud interchange

Description: Reconstruct and improve the Hwy 10 and Hwy 23 interchange area in east St. Cloud, Benton County. The project will reconstruct the road surfaces, reconstruct the Hwy 23 bridges over Hwy 10, replace drainage structures, and improve overall motorist and pedestrian safety and access.

Status: Plans, study in progress. Reconstruct 2023.
More information: mndot.gov/d3/stc

Hwy 23 Realignment and Mission Creek Bridge replacement

Description: Replace old bridge and realign highway.

Status: Work begins in 2023
More information: mndot.gov/d1/projects/mission-creek-bridge

Hwy 23 — New London

Description: Construct J-turn

Status: Work begins in 2022
More information: mndot.gov/d8/projects/hwy23newlondon

Hwy 25

Hwy 25—Buffalo

Description: Reconstruct Hwy 25 from south of 1st St. S to north of Settlers Pkwy. in Buffalo, Wright County, includes city utilities and pedestrian sidewalks and approaches.

Construction dates: Construct 2023

More information: mndot.gov/d3/buffalo

Hwy 27

Hwy 27 — Osakis area

Description: Reconstruct and improve Hwy 27 between I-94 in Douglas County and Hwy 71 in Todd County. The project will replace four bridges, reconstruct and widen the road and improve access.

Status: Construct 2022

More information: mndot.gov/d3/projects/h27osakis

Hwy 28/29

Hwys 28, 29, 114 – Starbuck

Description: Downtown Complete Streets reconstruction. Resurfacing of Hwys 28, 29 and 114 throughout Starbuck. Utility replacement, sidewalk improvements and ADA accessibility upgrades. Multi-use trails.

Construction Dates: 2020

More information: mndot.gov/d4/projects/starbuck

Hwy 29

Hwy 29 – Glenwood overpass

Description: Construct bridge over the railroad tracks just north of Glenwood, realign the intersection of Hwy 29 and 55

Status: Scheduled for 2021 construction

More information: mndot.gov/d4/projects/glenwoodoverpass

Hwy 29 corridor - Alexandria

Description: Planning study to identify future highway improvements that will enhance traffic performance, mobility and driver satisfaction.

Status: Study

More information: mndot.gov/d4/projects/hwy29alex

Hwy 29 – Montevideo

Description: Bridge replacement

Construction dates: Begins 2020

More information: mndot.gov/d8/projects/hwy29montevideobridge

Hwys 32 – 52

Hwy 34

Hwy 34 — East of CR 29 to west of Osage

Description:Selective tree logging in right of way, resurface (reclaim), culvert replacements, and bridge replacement at Shell River
Status: Work begins Fall/Winter 2020-2021
More information: mndot.gov/d4/projects/hwy34/

I-35

I-35 – Heath Creek Rest Area

Description: Rest Area Reconstruction
Construction Dates: Spring 2020 – October 2020
Traffic impacts: Rest area will be closed during construction
More information: mndot.gov/d6/projects/i35-heath-creek-nb

I-35 – Straight River Southbound Rest Area

Description: Rest area reconstruction
Construction Dates: Spring 2020 – October 2020
Traffic impacts: Rest area will be closed during construction
More information: mndot.gov/d6/projects/i35-straight-river-sb

I-35E from Little Canada to White Bear Lake

Description: Study to develop and evaluate conceptual alternatives for extending MnPASS from Little Canada Road to County Rd. 96

Status: Study in progress. The environmental phase for a MnPASS extension project has begun.

More information: mndot.gov/metro/projects/i35emnpassextension

I-35E/I-94 Concrete rehabilitation project

Description: Concrete pavement repair/resurfacing between Western Ave. and Mounds Blvd.; and on I-35E between I-94 and University Ave. in St. Paul. Resurface ramps and frontage roads, bridge repair, fix drainage and repair various sidewalks and ADA improvements

Status: Spring 2022 through Fall 2023 (preliminary work begins fall 2021)

Traffic impacts: Multiple weekend closures, lane and ramp closures

More information: mndot.gov/metro/projects/i94-i35e-stpaul

I-35W/I-494 Study

Description: Interchange Improvements

Status: Study complete.

More information: mndot.gov/metro/projects/i494and35winterchange

I-35W North Gateway Study

Description: Study the freeway between Park Ave. in Minneapolis and Co. Rd. C in Roseville to identify needs for future construction projects.

Status: Study in progress.

More information: mndot.gov/metro/projects/i35w-north-gateway

Hwy 36

Hwy 36 Study from North St. Paul to Oakdale

Description: Develop preliminary concept designs for intersection improvements at Century Avenue and Hadley Avenue

Status: Hwy 36/Hadley Ave. interchange funded for construction in 2019.

More information: mndot.gov/metro/projects/hwy36study

Hwy 36 and County Hwy 15 (Manning Avenue Interchange)

Description: Locally led project to construct interchange at Manning Ave. (Washington County Hwy 15) and Hwy 36.

Status: Transitioning from preliminary to final design. Funding partially secured with construction anticipated for 2021.

More information: co.washington.mn.us/Manning36Interchange

Hwy 41

Hwy 41 River Crossing Project

Description: Connect Hwy 169 and new Hwy 212 near Hwy 41

Status: Study complete. No projects have been funded or planned.

More information: mndot.gov/metro/projects/hwy41bridge

Hwy 42

Hwy 42 Resurfacing Project

Description: Resurfacing Hwy 42 from Plainview to the west side of the newly replaced bridge west of Hwy 61

Construction Dates: Summer 2020

More information: mndot.gov/d6/projects/hwy42-resurfacing-plainview

Hwy 47

Hwy 47 — Hwy 65 (Central Avenue) to 27th Avenue

Description: Resurface Hwy 47 from Hwy 65 to 27th Ave. NE in Minneapolis, ADA improvements, sidewalk improvements, replace guardrail and repair drainage

Construction dates: 2024

Traffic impacts: Lane closures, sidewalk closures with detours for pedestrians

More information: mndot.gov/metro/projects/hwy47-hwy65-27ave

Hwy 47/Ferry Street and BNSF Railroad Crossing, Anoka

Description: Construct a new crossing of the BNSF Railroad north of Highway 10

Status: Study complete. Preliminary design underway. No projects have been funded or planned.

More information: mndot.gov/metro/projects/hwy47rr-anoka

Hwy 47 — St. Francis

Description: MnDOT is beginning a planning study of the Hwy 47 St. Francis corridor to examine a range of alternatives to address pedestrian, bicycle and motorist safety, as well as road capacity, and access and mobility issues.

Construction dates: On hold

More information: mndot.gov/metro/projects/hwy47stfrancis

Hwy 47/169 — Anoka

Description: Repair and resurface approximately 2.5 miles of Hwy 169 between the north end of the Mississippi River bridge to Clay St. in Anoka. Hwy 47 will be resurfaced from Pleasant St. to Bunker Lake Rd. in Anoka.

Construction dates: Spring through summer 2021

Traffic impacts: Shoulder closures, lane closures and ramp closures

More information: mndot.gov/metro/projects/hwy47-169-anoka

Hwy 51

Hwy 51 (Snelling Avenue) - Hewitt Avenue to Midway Parkway

Description: Safety and mobility needs study

Status: Developing a preliminary design. Study completed in 2013.

Hwy 52

Hwy 52 – Cannon Falls to Hader Access Study

Description: Study to identify a recommended alternative
Status: Study completed 2012. Several projects completed or planned.
More information: mndot.gov/d6/projects/hwy52accessstudy

Hwy 52 – Hader Southbound Improvements

Description: The project follows along Highway 52, from roughly 2 miles south of Cannon Falls and ends at Zumbrota.
Status:Construction begins 2021
More information: mndot.gov/d6/projects/hwy52-hader-southbound-improvements

Hwy 52 — St. Paul, West St. Paul, Inver Grove Heights

Description: Resurface Hwy 52 between I-494 in Inver Grove Heights and Hwy 156/Concord St. in West St. Paul and repair concrete on Hwy 52 between Concord St. in West St. Paul and Plato Blvd. in St. Paul.

Construction: April through November 2021

More information: mndot.gov/metro/projects/hwy52-stpaul-invergrovehts

Hwys 53 – 77

Hwy 55

Hwy 55 — Golden Valley

Description: Resurface Hwy 55 between General Mills Blvd. and Hwy 100 in Golden Valley; improve safety and accessibility; potentially construct beginning of trail between Winnetka Ave. and Glenwood Ave.

Construction: May through October 2021

Traffic Impacts: Weekend and overnight lane closures of Hwy 55

More information: mndot.gov/metro/projects/hwy55goldenvalley

Hwy 55 – Plymouth to Rockford

Description: Lane expansion

Status: Study in progress. No projects have been funded or planned.

More information: mndot.gov/metro/projects/hwy55plymouthtorockford

Hwy 55 / Hwy 59 – Elbow Lake to Barrett

Description: Resurfacing (reclaim), shoulder-widening, with 8 additional feet (4-foot paved, 4-foot gravel) on each side of the highway, culvert replacements, turn lanes at County Road 8 and County Road 21, potential installation of snow fence, access improvements, and pedestrian ramp installation in the city of Barrett.

Status: Scheduled for 2023 construction
More information: mndot.gov/d4/projects/elbowlake-barrett

Hwy 56

Hwy 56 – Taopi to LeRoy

Description: Repaving

Status: Construction in 2020

More information: mndot.gov/d6/projects/hwy56-repaving-taopi-leroy

Hwy 57

Hwy 57 and Hwy 60 – Wanamingo

Description: Intersection roundabout

Status: Construction in 2020

More information: mndot.gov/d6/projects/hwy57-hwy60-roundabout

Hwy 59

Hwy 59 slope repair

Description: Slope repair and stabilization of the roadway embankment
Construction dates: Begins 2020
More information: mndot.gov/d8/projects/hwy59hwy14slopes

Hwy 59 and Hwy 108 – Pelican Rapids

Description: Utility preplacement, sidewalk improvements, bicycle & ADA accessibility upgrades.

Status: Planning

More information: mndot.gov/d4/projects/pelicanrapids

Hwy 60

Hwy 60 Lake Connection — Madison Lake, Elysian, Waterville

Description: Resurface approximately 16 miles of Hwy 60, including a reconstruction through Madison Lake

Construction Dates: 2021

Traffic Impacts: Traffic will be detoured in phases

More information: mndot.gov/d7/projects/hwy60madisonlake/

Hwy 60 — Lake Crystal

Description: MnDOT is conducting a transportation study that reflects the current and future transportation needs on Highway 60 through Lake Crystal. With input from the city of Lake Crystal, local residents and businesses, and other project stakeholders, MnDOT will evaluate the corridor, develop design alternatives, and arrive at a preliminary layout for a future Highway 60 roadway project.

Construction Dates: 2024

More information: mndot.gov/d7/projects/hwy60lakecrystal/

Hwy 60 — Zumbro Falls

Description: Hwy 60 improvements

Construction Dates: 2022

More information: mndot.gov/d6/projects/hwy60-improvements

Hwy 61

Hwy 61 — Lake City

Description: Hwy 61 reconstruct.

Status: Construction summer 2020

More Information: mndot.gov/d6/projects/hwy61-lakecity-reconstruct

Hwy 61 — Lake County

Description: Install new efficient tunnel lighting systems

Status: Fall 2021 to late 2021

More Information: mndot.gov/d1/projects/hwy61-tunnels

Hwy 61 — Two Harbors

Description: Resurface almost seven miles of pavement south of Two Harbors, new intersection

Status: 2021

ore Information: mndot.gov/d1/projects/hwy61-twoharbors

Hwy 61 — Winona

Description: Hwy 61 intersection safety improvements
Construction Dates: 2020
More information: mndot.gov/d6/projects/hwy61-safety-improvements-winona

Hwy 61 — Silver Creek and Stewart River bridges

Description: Replace Silver Creek Bridge, rehabilitate existing Stewart River Bridge and add new bridge inland.

Construction Dates: 2021-2022

More Information: mndot.gov/d1/projects/hwy61-bridges/

Hwy 61 — Wyoming, Forest Lake

Description: Resurface Hwy 61 between I-35 in Wyoming and Hwy 8 in Forest Lake. The work will include pavement work, drainage, right turn lanes, safety and pedestrian improvements.
Construction: 2021
More Information: mndot.gov/metro/projects/hwy61resurfacing

Hwy 63

Hwy 63 and I-90 – Stewartville

Description: Interchange improvements including replacement of the Hwy 63 bridges, and safety and vehicle traffic capacity improvements to the ramp geometrics and traffic operations within the corridor.
Status: Work scheduled for summer 2020 - summer 2021
More information: mndot.gov/d6/projects/hwy63-i90-interchange

Stone Arch Bridge

Stone Arch Bridge — Minneapolis

Description: Preservation of the historic bridge including repointing mortar and repairing/replacing some of the stone

Construction: Fall 2022 through spring 2024

More information: mndot.gov/metro/projects/stonearchbridge

Hwy 65

Hwy 65 in Ham Lake, Blaine and Spring Lake Park

Description: Corridor access planning study between Bunker Lake Blvd. and Co. Rd. 10

Status: Study August 2018 through summer 2020

More information: mndot.gov/metro/projects/hwy65hamlake-slp

Hwy 65, 2 — Swan River roundabout project

Description: Construct roundabout
Status: 2023
Traffic impacts: None currently

More information: mndot.gov/d1/projects/swanriverroundabout

Hwy 65 and Klondike Dr. N.E. — Cedar and East Bethel

Description: Build a non-signalized Reduced Conflict Intersection (RCI).

Status: Currently in design. Construction begins spring 2021.

More information: mndot.gov/metro/projects/hwy65-klondike

Hwy 67

Hwy 67 – Clarkfield

Description: Reconstruction of Hwy 67 from Hwy 59 to Sixth Street
Construction dates: Begins 2023
Traffic impacts: Detour
More information: mndot.gov/d8/projects/hwy67clarkfield

Hwy 68

Hwy 68 – Minneota to Marshall

Description: Shoulder widening and culvert replacement

Status: Work begins in 2021

More information: mndot.gov/d8/projects/hwy68minneotatomarshall

Hwy 71

Hwy 71 – Bemidji

Description: Corridor safety evaluation
Status: Community Review Panel study
More information: mndot.gov/d2/projects/hwy71-bemidji

Hwy 71 – County Road 90 J-turn

Description: Construction of J-turn

Status: Preliminary design & environmental work

More information: mndot.gov/d8/projects/us71cr90

Hwy 71 – Windom to Hwy 30

Description: Resurfacing

Status: Work begins 2020

Traffic impacts: Traffic managed with lane restrictions and delays.

More information: mndot.gov/d7/projects/hwy71jackson

Hwy 75

Hwy 75 – Madison to Bellingham

Description: Resurfacing of Hwy 75 from south of Madison to the jct. of Hwy 7, culvert lining, guardrail replacement and ADA upgrades in Bellingham
Construction dates: Begins 2020
Traffic impacts: Detour
More information: mndot.gov/d8/projects/hwy75madisontobellingham

Hwy 75 – Pipestone bridge

Description: Bridge replacement on Hwy 75 over Pipestone Creek.

Construction dates: 2020

Traffic impacts: Detour

More information: mndot.gov/d8/projects/hwy75pipestonebridge

Hwy 77

Hwy 77 — Richfield

Description: Build underpass beneath Hwy 77 connecting 77th St. in Richfield to 66th St.; build ramps, build trail, sidewalk.

Construction dates: 2021 through 2022

Traffic impacts: Lane shifts, ramp closure from SB 77 to WB I-494

More information: richfieldsweetstreets.org/projects/77th-street-underpass

Hwys 78 – 156

Hwy 84

Hwy 84 – Pine River

Description: Replace the Hwy 84 bridge over the Norway Brook in Pine River, Cass County. The new structure will have pedestrian sidewalks on both sides and shoulders for bicyclists.
Status: Construct 2021
More information: mndot.gov/d3/projects/pineriver

Hwy 87

Hwy 87 – Frazee

Description: MnDOT will complete two related projects on Hwy 87 in the Frazee area in 2021 and 2022.
Status: 2021 (rural segment) and 2022 (urban segment) construction
More information: mndot.gov/d4/projects/frazee

I-90

I-90 – Austin bridge replacements

Description: Replacing two bridges over Interstate 90
Status: Construction 2021
More information: mndot.gov/d6/projects/i90-austin-bridge-replacements

I-90 – Austin repaving

Description: I-90 repaving
Construction Dates: 2020
More information: mndot.gov/d6/projects/i90-repaving-austin

I-90 – Nodine bridge replacement

Description: Bridge replacement
Construction Dates: 2020
More information: mndot.gov/d6/projects/i90-nodine-bridge

I-90 and Hwy 63 – Stewartville

Description: Interchange improvements including replacement of the Hwy 63 bridges, and safety and vehicle traffic capacity improvements to the ramp geometrics and traffic operations within the corridor.
Status: Work scheduled for summer 2020 - summer 2021
More information: mndot.gov/d6/projects/hwy63-i90-interchange

Hwy 93

Hwys 93 and 19 near Henderson

Description: Flood feasibility study to evaluate the bridges and approach roadways over the Minnesota River for Hwy 19, Hwy 93 and Sibley County Road 6.

Status: Study in progress. No projects have been funded or planned.

More information: mndot.gov/d7/projects/hwy19study

I-94

I-94 — Central Minnesota

Description: Future road construction plans for I-94 in Wright and Stearns counties, in central Minnesota. Includes the communities of St. Michael, Albertville, Monticello, Clearwater, St. Cloud, Collegeville and Sauk Centre.

Status: Current, future plans and studies

More information: mndot.gov/d3/i94

Highway 27/Interstate 94 eastbound ramps

Description: MnDOT will design intersection improvements for the Highway 27/Interstate 94 eastbound ramps to improve safety and efficiency along the I-94/Highway 27/County Road 46 corridors.

Status: Work begins 2023

More information: mndot.gov/d4/projects/i94interchange

Hwy 10 to I-94 project study — new freeway connection

Description: Proposed freeway connection and river crossing between Hwy 10 and I-94 using Hwy 24 in Wright and Sherburne counties

Status: Study completed 2007; project is unprogrammed; no funds are available.

More information: mndot.gov/d3/projects/interregionalconnection

I-94 – Minneapolis to St. Paul

Description: Study to gather public input about this corridor

Status: Study in progress. Some project funding is identified for 2021 and 2022.

More Information: mndot.gov/I-94minneapolis-stpaul

I-94/I-35E – St. Paul

Description: Concrete pavement repair/resurfacing between Western Ave. and Mounds Blvd.; and on I-35E between I-94 and University Ave. in St. Paul. Resurface ramps and frontage roads, bridge repair, fix drainage and repair various sidewalks and ADA improvements

Status: Spring 2022 through Fall 2023 (preliminary work begins fall 2021)

Traffic impacts: Multiple weekend closures, lane and ramp closures

More information: mndot.gov/metro/projects/i94-i35e-stpaul

I-94/I-694 – Brooklyn Center

Description: Resurface, concrete pavement repairs, drainage and ADA improvements on I-94/I-694 between Brooklyn Blvd. and just east of Dupont Ave. in Brooklyn Center.

Status: Currently in design. Construction begins 2021.

Hwys 169 – 694

Hwy 169

Hwy 169/47 — Anoka and Ramsey

Description: Repair and resurface approximately 2.5 miles of Hwy 169 between the south end of the Mississippi River bridge to Clay St. in Anoka and Hwy 47 from Pleasant St. to Bunker Lake Rd. in Ramsey

Construction dates: Spring 2021

Hwy 169/210 — Aitkin to north of Hassman

Description: Reconstruct 11 miles of road surface, widen shoulders and upgrade drainage infrastructure.
Status: Plans in progress; Construct 2022
More information: mndot.gov/d3/projects/aitkin-hassman

Hwy 169 — Belle Plaine

Description: Belle Plaine Area Plan

Status: Study completed 2003. No projects have been funded or planned.

Hwy 169 – Blue Earth to Iowa

Description: Resurface nine miles of Hwy 169 from Faribault County Road 52 (southern limits of Blue Earth) to the Minnesota-Iowa border

Status: Preliminary design in progress. Construct 2022

More information: mndot.gov/d7/projects/hwy169blueearth-iowa/

Hwy 169 — Broadway to Union in St. Peter

Description: The pavement on Hwy 169 from Broadway Ave. to Union St. (approximately half of a mile) is deteriorating more quickly than the subsequent sections of Hwy 169. MnDOT completed a maintenance project in 2019 that extended the life of the pavement in this segment, gaining about 5-7 years before a future project will address a more significant pavement fix and other accommodations

More information: mndot.gov/d7/projects/hwy169stpeterbroadway-union/

Hwy 169 — Elk River freeway

Description: Convert three miles of Hwy 169 to a new freeway system through Elk River from Hwy 101/Hwy 10 to 197th Ave, Sherburne County. Corridors of Commerce project.

Status: Preliminary design in progress. Construct 2022-2024

More information: mndot.gov/d3/elkriverfreeway

Hwy 169 and Hwy 41 — River Crossing

Description: Connect Hwy 169 and new Hwy 212 near Hwy 41

Status: Study completed in 2015. No projects have been funded or planned.

More information: mndot.gov/metro/projects/hwy41bridge

Hwy 169 — Shakopee to Blakely Township

Description: Identify options for access changes, improvements to safety and mobility

Status: Study underway

Hwy 169, Hwy 22, Hwy 99 intersections — St. Peter

Description: A project is planned in 2023 to improve the pavement condition, intersection safety, and mobility along the Hwy 169 corridor on the south side of St. Peter, including the intersections with Hwy 22 and Hwy 99

Construction: 2023

More information: mndot.gov/d7/projects/hwy169-22-99/

Hwy 169 project study — Elk River to Zimmerman

Description: Assessed range of reasonable alternatives to corridor improvements.

Status: Study completed 2013. No projects have been funded or planned.

More information: mndot.gov/d3/projects/169elkriver

Hwy 169 mobility study

Description: Hwy 169 mobility and transit improvements between Hwy 55 in Golden Valley and Hwy 41 in Shakopee, and between Mankato and the Twin Cities Metro area.

Status: Complete
More information: mndot.gov/metro/projects/hwy169study

Hwy 169 from Marble to Pengilly

Description: Safety improvements.

Status: 2021

More information: mndot.gov/d1/projects/marble-pengilly

Hwy 197

Hwy 197 — Bemidji

Description: Corridor safety and access management
Status: Community Review Panel study (looking for preferred alternative in spring 2021)
More information:  mndot.gov/d2/projects/2019/hwy197-bemidji-study

Hwy 200

Hwy 200 — Mahnomen to Roy Lake

Description: Shoulder widening, pedestrian accessibility improvements, and drainage repairs.

Status: Planning

More information: mndot.gov/d4/projects/hwy200

Hwy 210

Hwy 210 – Brainerd project study

Description: Study of the Hwy 210/Washington St. corridor between Baxter Dr. and Pine Shores Rd in Brainerd, Crow Wing County. Results of the study will  inform plans for the future reconstruction project.

Status: Study 2019-2021; Plan 2022-2024; Construct 2025 or beyond

More information: mndot.gov/d3/projects/brainerd

Hwy 210 - Crosby to Ironton

Description: Reconstruct or resurface road and improve pedestrian accessibility on Hwy 210 from east of Third Ave East near the Cuyuna Regional Medical Center in Crosby, to west of Sixth Ave in Ironton.
Status: Construct 2021
More information: mndot.gov/d3/crosby-ironton

Hwy 210/Hwy 73 - Cromwell

Description: Drainage and safety improvements

Status: Construction begins in 2021
More information: mndot.gov/d1/projects/hwy210cromwell

Hwy 212

Hwy 212 between Carver and Norwood Young America

Description: Transportation Planning Study

Status: Study in progress.

More information: co.carver.mn.us/departments/public-works/projects-studies/us-212-project-dahlgren-township

Hwy 218

Hwy 218 – Reconstruct - Blooming Prairie

Description: The Hwy 218 corridor through Blooming Prairie (Fourth Street to Hwy 30) is due for reconstruction in 2023.
Construction: 2023
More information: mndot.gov/d6/projects/hwy218-bloomingprairie-reconstruct

Hwy 251

Hwy 251 – Hollandale

Description: Resurfacing and culvert replacement
Status: Construction planned for 2020
More information: mndot.gov/d6/projects/hwy251-resurfacing

Hwy 252

Hwy 252/I-94 MnPASS Mobility study

Description: Convert Hwy 252 into a freeway between 66th Ave. in Brooklyn Center and Hwy 610 in Brooklyn Park. Work would include removing and replacing intersections along the roadway. Add a MnPASS lane to I-94 from Brooklyn Center to downtown Minneapolis.

Status: Study in progress.

More information: mndot.gov/metro/projects/hwy252study

Hwy 263

Hwy 263 – I-90 to Ceylon

Description: Resurface Hwy 263 in preparation for a turnback of the highway to Martin County

Construction: 2022

More information: mndot.gov/d7/projects/hwy263ceylon/

Hwy 316

Hwy 316 - Hastings

Description: Repave Hwy 316 between the north and south junctions of Hwy 61 and evaluate a portion between the north junction of Hwy 61 and Tuttle Dr.

Construction: Spring 2021 through fall 2022

More information: mndot.gov/metro/projects/hwy316

Hwy 371

Business Hwy 371 — Barrows to Brainerd

Description: Reconstruct the road, upgrade the signal and improve pedestrian access  from Greenwood St. to Joseph St. in Brainerd; Resurface road from 70th Ave. in Barrows to Greenwood St. Work requires detours.
Status: Construct 2022
More information: mndot.gov/d3/brd

Hwy 371 — Brainerd Lakes area

Description: Improve access and safety at three intersections along a busy stretch of Hwy 371 with use of reduced conflict intersections between Gull Lake Dam Road (Crow Wing CR 125) and Green Gables Road (Crow Wing CR 126), includes access to Birchdale Rd (Brainerd International Raceway).

Status: Plans in progress; Construct 2022

More information: mndot.gov/d3/projects/rci/h371

Hwy 371 project study — Nisswa to Pine River

Description: Project study to expand to four lanes and improve access along the corridor. Since the study was completed, Hwy 371 has been expanded to four lanes between Nisswa and Jenkins. Pine River to Jenkins remains unprogrammed for expansion.

Status: Study complete

More information: mndot.gov/d3/projects/hwy371

Hwy 371 — Hackensack

Description: Reconstruct HWY 371 from CR 40 to CR 5 in Hackensack.

Status: Community outreach, information gathering & project development

More information: mndot.gov/d2/projects/hwy371-hackensack

I-494

I-494/I-35W Study

Description: Interchange Improvements

Status: Study in progress. No projects have been funded or planned.

More information: mndot.gov/metro/projects/i494and35winterchange

I-494/Hwy 62 Congestion Relief Study

Description: Mobility and transit improvements

Status: Study complete.

More information: mndot.gov/metro/projects/i494and62study

I-494 – Airport to Hwy 169

Description: Study to evaluate design alternatives and determine a scope of work for the future reconstruction of the I-494 corridor from the MSP Intl’ Airport to Hwy 169. The proposed project is envisioned to improve the capacity of the interstate and dramatically improve the reliability of the average rush hour trip.

Status: Study in progress. Construction begins 2022-2024.

Traffic impacts: No current traffic impacts. An extensive review of current and planned construction projects surrounding the corridor is being conducted to minimize impacts once construction begins.

More information: mndot.gov/metro/projects/i494-airport-hwy169

I-694

I-694 Non-motorized Crossing Study

Description: Determine safety and mobility needs for bicyclists and pedestrians for the area

Status: Study completed. No projects have been funded or planned.

More information: mndot.gov/metro/projects/i694crossingstudy