National Highway System bridge projects
Statewide bridge needs
How the projects scored in 2019
The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed. View more detailed scores (Excel).
Last updated December 2019
Score | District | Bridge number | Route | Key intersection or closest landmark | Work type | Year planned (FY) | High level construction cost estimate for planning purposes | Comments |
---|---|---|---|---|---|---|---|---|
100 | Metro | 9600N | MN77 Northbound | Minnesota River/Blackdog Road | Reoverlay deck surface | 2025 | $3,800,000 | |
97 | Metro | 27855 | I-94 | Highway 55 | Overlay deck surface | 2025 | $4,500,000 | |
90 | 6 | 9009 | MN 30 | North Bridge Root River | Replace | 2021 | $1,900,000 | Coordinated with bridge 9008 |
90 | Metro | 9700 | US 10 | Rum River | Replace | 2022 | $61,000,000 | |
90 | Metro | 9217E | I-494 Eastbound | Minnesota River | Reoverlay deck surface | 2023 | $7,300,000 | |
90 | Metro | 9217W | I-494 Westbound | Minnesota River | Reoverlay deck surface | 2023 | $6,800,000 | |
90 | Metro | 9600S | MN 77 Southbound | Minnesota River/Blackdog Road | Reoverlay deck surface | 2025 | $3,800,000 | |
88 | 1 | 69816 | Lake Ave | Over I-35 | Overlay deck surface | 2020 | $2,000,000 | Coordinated with a city of Duluth project on Superior Street. |
87 | 3 | 71012 | MN 25 | Mississippi River | Overlay deck surface | 2024 | $2,500,000 | |
85 | 1 | 69808 | I-535 | Over Garfield Ave and railroad | Redeck | 2028 | $3,700,000 | |
81 | 6 | 9040 | US 63 | Mississippi River and Canadian Pacific Rail | Replace | Not Selected | $39,000,000 | Complex project that requires coordination with railroad |
80 | 1 | 69834 | 27th Ave W | Over I-35 | Redeck | 2020 | $200,000 | Part of Twin Ports Interchange, now being replaced with Bridge 69909 |
80 | 2 | 04021 | Irvine Ave | Over Highway 71 | Redeck | 2020 | $900,000 | |
80 | 3 | 6852 | US 71 | Long Prairie River | Replace | 2020 | $1,500,000 | |
80 | Metro | 19823 | I-494 Eastbound | I-35E | Reoverlay deck surface | 2020 | $1,000,000 | |
80 | Metro | 19824 | I-494 Eastbound | I-35E | Reoverlay deck surface | 2020 | $900,000 | |
80 | Metro | 19878 | Eastbound I-494 to Northbound I-35E | I-494/I-35E south ramp | Reoverlay deck surface | 2020 | $700,000 | |
80 | Metro | 19899 | Westbound 494 to Southbound I-35E | I-494/I-35E north ramp | Reoverlay deck surface | 2020 | $500,000 | |
80 | Metro | 27763 | MN 5 Eastbound on ramp | I-494 Westbound off ramp | Reoverlay deck surface | 2020 | $1,100,000 | Coordinated with 10 other bridges |
80 | Metro | 27962 | MN 100 Southbound | I-94/694 off ramp | Reoverlay deck surface | 2020 | $2,300,000 | |
80 | Metro | 27984 | Eastbound over I-494 | I-494 Westbound off ramp | Reoverlay deck surface | 2020 | $1,200,000 | Coordinated with 10 other bridges |
80 | Metro | 9153 | MN 5 Westbound | Inbound/Outbound Airport road | Reoverlay deck surface | 2020 | $300,000 | Coordinated with 10 other bridges |
80 | 7 | 53802 | MN 91 | I-90 | Replace | 2021 | $2,100,000 | |
80 | 8 | 6782 | MN 30 | Des Moines River | Overlay deck surface | 2021 | $100,000 | |
80 | Metro | 9805 | I-94 Westbound on ramp | 12th St East | Reoverlay deck surface | 2021 | $400,000 | |
80 | Metro | 9805A | Ramp to I-35E Southbound | I-94 Westbound | Reoverlay deck surface | 2021 | $200,000 | |
80 | 3 | 6778 | MN 65 | Snake River | Replace | 2022 | $2,100,000 | |
80 | 7 | 52001 | US 169 Southbound | Roberts Creek | Replace | 2022 | $1,400,000 | |
80 | Metro | 27177 | MN 55 Eastbound | Franklin Ave | Redeck | 2022 | $500,000 | |
80 | 1 | 09823 | I-35 Southbound | Over Carlton County Road 61 | Redeck | 2023 | $2,200,000 | |
80 | Metro | 27586 | US 169 | Excelsior/3rd St /Railroad | Reoverlay deck surface | 2023 | $400,000 | |
80 | Metro | 9263 | Anoka County Road 10 Eastbound | Highway 65 | Reoverlay deck surface | 2023 | $400,000 | |
80 | 1 | 69870 | I-35 | 5th Avenue | Overlay deck surface | 2024 | $1,300,000 | |
80 | 6 | 9201 | US 218 | I-90 | Replace | 2024 | $2,100,000 | Being delivered with pavement project |
80 | 6 | 9506 | Mower County Road 20 | I-90 | Redeck | 2024 | $800,000 | Project includes bridges 9505, 9506, 9507, 9705, 9706, 9856, 9859 |
80 | 6 | 9859 | Olmsted County Road 35 | I-90 | Redeck | 2024 | $800,000 | Project includes bridges 9505, 9506, 9507, 9705, 9706, 9856, 9859 |
80 | 3 | 5060 | MN 210 | Mississippi River | Reoverlay deck surface | 2025 | $1,100,000 | |
80 | 7 | 53824 | Nobles County Road 60 | I-90 | Overlay deck surface | 2025 | $200,000 | |
80 | 1 | 69879E | I-35 Northbound Off Ramp | Over 57th Ave W | Replace or repair | 2027 | $900,000 | Project includes bridges 69879, 69879A, 69879B, 69879C, 69879D, and 69879E |
80 | 6 | 85006 | MN 74 | Midfork Whitewater River | Replace | 2027 | $1,800,000 | |
80 | 1 | 36013 | US 71 | Over Little Fork River | Overlay deck surface | Not Selected | $500,000 | |
80 | 4 | 9697 | MN 210 Eastbound | I-94 | Replace | Not Selected | $2,500,000 | Considering bundling with bridge 56001 westbound |
80 | 6 | 55017 | Olmstead County Road 36 | Highway 52 | Overlay deck surface | Not Selected | $600,000 | Not a district priority. Will continue to monitor bridge performance. |
80 | Metro | 02024 | MN 610 Eastbound | East River Road | Reoverlay deck surface | Not Selected | $300,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
80 | Metro | 02815 | I-694 | Highway 65 | Reoverlay deck surface | Not Selected | $1,000,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
80 | Metro | 19816 | Cliff Rd | I-35E | Reoverlay deck surface | Not Selected | $2,200,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
80 | Metro | 19855 | US 52 Southbound | I-494 | Reoverlay deck surface | Not Selected | $1,700,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
80 | Metro | 19856 | US 52 Northbound | I-494 | Reoverlay deck surface | Not Selected | $1,700,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
80 | Metro | 27052A | MN 77 Northbound, Westbound 494 | 79th St /Highway 77 on ramp | Reoverlay deck surface | Not Selected | $1,300,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
80 | Metro | 27726 | I-94 Eastbound off Ramp | Glenwood Ave | Reoverlay deck surface | Not Selected | $1,400,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
80 | Metro | 27726B | I-94 Southbound off Ramp | Lyndale Ave/UP railroad | Reoverlay deck surface | Not Selected | $2,500,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
80 | Metro | 27727A | I-94 Northbound off Ramp | Glenwood Ave/UP railroad | Reoverlay deck surface | Not Selected | $1,100,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
80 | Metro | 27767 | I-494 | MN 5 | Reoverlay deck surface | Not Selected | $1,600,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
80 | Metro | 27769 | I-494 Westbound off Ramp | to 34th Avenue | Reoverlay deck surface | Not Selected | $400,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
80 | Metro | 82849 | I-94 Westbound | MN 95 | Reoverlay deck surface | Not Selected | $1,000,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
80 | Metro | 82850 | I-94 Eastbound | Highway 95 | Reoverlay deck surface | Not Selected | $1,100,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
79 | Metro | 27239 | MN 610 Westbound | Mississippi River | Reoverlay deck surface | Not Selected | $2,600,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
75 | 6 | 6483 | US 61 | Hay Creek/Withers Dr | Replace | 2023 | $10,000,000 | Being delivered with pavement project |
73 | 7 | 07042 | Belgrade Ave/Mulberry St | Minnesota River | Redeck | Not Selected | $8,800,000 | Coordination with City of Mankato required |
72 | 1 | 69802 | US 53 | Over W 1st to N 21st Ave W | Replace | 2021 | $17,000,000 | Included in Phase 3 of Twin Ports Interchange project |
70 | Metro | 19897 | I-494 Westbound | Westbound off ramp to I-35E | Reoverlay deck surface | 2020 | $200,000 | |
70 | Metro | 19898 | I-494 Eastbound | Off ramp to I-35E southbound | Reoverlay deck surface | 2020 | $300,000 | |
70 | Metro | 19900 | I-494 Eastbound off ramp | Off ramp to I-35E southbound | Reoverlay deck surface | 2020 | $200,000 | |
70 | Metro | 27971 | MN 5 | I-494 | Reoverlay deck surface | 2020 | $1,100,000 | |
70 | Metro | 27983 | MN 5 Westbound | I-494 westbound off ramp | Reoverlay deck surface | 2020 | $500,000 | |
70 | 2 | 68004 | MN 32 | Over farm ditch south of 180th St | Overlay deck surface | 2021 | $300,000 | |
70 | 8 | 5133 | MN 19 | Redwood River | Reoverlay deck surface | 2021 | $400,000 | |
70 | 6 | 9179 | I-90 Eastbound | 6th St NE | Reoverlay deck surface | 2023 | $900,000 | Coordinated with bridge 9178, being delivered with pavement project |
70 | 7 | 83022 | MN 15 | Union Pacific railroad | Overlay deck surface | 2023 | $500,000 | |
70 | Metro | 27765 | I-494 | 34th Ave S | Reoverlay deck surface | 2023 | $800,000 | |
70 | 3 | 71007 | US 169 Southbound | Mille Lacs County Highway 29 | Reoverlay deck surface | 2024 | $300,000 | |
70 | 3 | 49009 | US 10 | BNSF railroad & Morrison County Highway 76 | Overlay deck surface | 2024 | $900,000 | |
70 | 3 | 48016 | US 169 Northbound | Mille Lacs County Highway 29 | Reoverlay deck surface | 2024 | $300,000 | |
70 | 1 | 9787 | I-35 Southbound | Over Grindstone River | Replace | 2025 | $2,000,000 | Coordinated with bridge 9788 |
70 | 3 | 48011 | US 169 Southbound | West Rum River Bridge | Overlay deck surface | 2025 | $300,000 | |
70 | 3 | 48010 | US 169 Northbound | Mille Lacs County Highway 31 | Reoverlay deck surface | 2025 | $300,000 | |
70 | 7 | 53811 | Nobles County Road 61 | I-90 | Overlay deck surface | 2025 | $200,000 | |
70 | 7 | 53822 | MN 264 | I-90 | Overlay deck surface | 2025 | $500,000 | |
70 | Metro | 6583 | I-35W | UP Railroad, Cliff Rd (Dakota County Road 32) | Replace | 2025 | $7,900,000 | Replace with bridges 9780 and 9779 |
70 | 3 | 71008 | US 169 Northbound | Mille Lacs County Highway 29 | Reoverlay deck surface | 2026 | $300,000 | |
70 | 7 | 9098 | US 169 | Minnesota River | Reoverlay deck surface | 2026 | $4,500,000 | |
70 | 7 | 07029 | US 169 | South Riverfront Drive | Reoverlay deck surface | 2026 | $700,000 | Coordinated with a pavement project |
70 | Metro | 27033 | MN 7 | US 169 | Reoverlay deck surface | 2026 | $1,800,000 | |
70 | Metro | 27046 | Killebrew Drive | MN 77 | Reoverlay deck surface | 2026 | $1,800,000 | |
70 | 7 | 83037 | MN 60 | Union Pacific railroad | Overlay deck surface | 2028 | $300,000 | Coordinating with another MnDOT project in the corridor |
70 | 7 | 07030 | US 169 | Sibley St | Reoverlay deck surface | 2029 | $500,000 | Coordinated with a pavement project |
70 | 7 | 07040 | US 169 Northbound | Blue Earth River | Reoverlay deck surface | 2029 | $500,000 | Coordinated with a pavement project |
70 | 7 | 07039 | US 169 Southbound | Blue Earth River | Reoverlay deck surface | 2029 | $600,000 | Coordinated with a pavement project |
70 | 7 | 07041 | US 169 Northbound | Highway 169 Off Ramp | Reoverlay deck surface | 2029 | $400,000 | Coordinated with a pavement project |
70 | 1 | 69817 | I-35 Northbound On Ramp | Near East Superior St | Overlay deck surface | Not Selected | $400,000 | Will be evaluated as part of I-35 corridor plan |
70 | 1 | 69852 | I-35 | Over Superior Hiking Trail | Reoverlay deck surface | Not Selected | $1,000,000 | Will be evaluated as part of I-35 corridor plan |
70 | 3 | 73855 | I-94 Westbound | Highway 15 | Reoverlay deck surface | Not Selected | $800,000 | Received new deck surface in 2016, bridge office anticipates surface will last through the end of the CHIP |
70 | 3 | 73856 | I-94 Eastbound | Highway 15 | Reoverlay deck surface | Not Selected | $600,000 | Received new deck surface in 2016, bridge office anticipates surface will last through the end of the CHIP |
70 | 3 | 73019 | Stearns County Highway 137 | Highway 15 | Reoverlay deck surface | Not Selected | $400,000 | Not a district priority. Will continue to monitor bridge performance. |
70 | 6 | 24836 | Freeborn County Road 25 | I-35 | Overlay deck surface | Not Selected | $300,000 | Needs further review of rails, joints etc. |
70 | 6 | 25014 | US 61 Northbound | Spring Creek | Reoverlay deck surface | Not Selected | $300,000 | Not a district priority. Will continue to monitor bridge performance. |
70 | 6 | 55035 | Olmstead County Highway 126 | Highway 52 | Reoverlay deck surface | Not Selected | $400,000 | Not a district priority. Will continue to monitor bridge performance. |
70 | 6 | 55053 | Mayowood Dr | Highway 52 | Reoverlay deck surface | Not Selected | $300,000 | Not a district priority. Will continue to monitor bridge performance. |
70 | 6 | 9104 | MN 76 | Money Creek | Overlay deck surface | Not Selected | $300,000 | Historic bridge and needs additional review |
70 | 7 | 67809 | Rock County Road 55 | I-90 | Overlay deck surface | Not Selected | $600,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | 7 | 07015 | US 14 Westbound | Union Pacific railroad | Reoverlay deck surface | Not Selected | $400,000 | Waiting to coordinate with a pavement project in the corridor |
70 | 7 | 07016 | US 14 Eastbound | Union Pacific railroad | Reoverlay deck surface | Not Selected | $400,000 | Waiting to coordinate with a pavement project in the corridor |
70 | 7 | 17007 | MN 60 Westbound | Union Pacific railroad | Reoverlay deck surface | Not Selected | $400,000 | Waiting to coordinate with another project. |
70 | 7 | 46812 | I-90 Eastbound | Highway 263 | Overlay deck surface | Not Selected | $400,000 | Maintenance performed in 2017 |
70 | 7 | 32802 | Jackson County Road 9 | I-90 | Overlay deck surface | Not Selected | $500,000 | Waiting to coordinate with another project. |
70 | Metro | 02025 | MN 610 Westbound | BNSF Railroad | Reoverlay deck surface | Not Selected | $300,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 02027 | MN 610 Westbound | Coon Rapids Blvd | Reoverlay deck surface | Not Selected | $600,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 02028 | MN 610 Eastbound | Coon Rapids Blvd | Reoverlay deck surface | Not Selected | $400,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 19023 | MN 55 Westbound | US 52 Southbound | Reoverlay deck surface | Not Selected | $1,300,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 19812 | I-35E Northbound | Dakota County Road 42 | Reoverlay deck surface | Not Selected | $800,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 19827 | MN 55 | I-494 | Redeck | Not Selected | $10,000,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 19891 | I-35W Southbound | Southcross Drive | Reoverlay deck surface | Not Selected | $800,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 19892 | I-35W Northbound | Southcross Drive | Reoverlay deck surface | Not Selected | $1,300,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 19893 | I-35E Southbound | Southcross Drive | Reoverlay deck surface | Not Selected | $900,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 19896 | I-494 | UP Railroad Hardman Ave | Reoverlay deck surface | Not Selected | $1,600,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 27051 | MN 77 | American Blvd | Overlay deck surface | Not Selected | $300,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 27052C | MN 77 Northbound | American Blvd | Reoverlay deck surface | Not Selected | $1,800,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 27053A | MN 77 Southbound on Ramp | Highway 77 northbound off ramp to I-494 westbound | Reoverlay deck surface | Not Selected | $300,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 27070 | MN 77 Northbound | Highway 77 northbound off ramp | Reoverlay deck surface | Not Selected | $300,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 27237 | MN 55 | BNSF/CP railroad | Reoverlay deck surface | Not Selected | $800,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 27726A | I-94 Southbound off Ramp | BNSF railroad/ UP railroad | Reoverlay deck surface | Not Selected | $1,700,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 27734 | I-694 Eastbound | I-94 westbound | Reoverlay deck surface | Not Selected | $1,500,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 27742 | US 169 | I-394 | Reoverlay deck surface | Not Selected | $2,100,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 27817 | I-94 Southbound on Ramp | Southbound off ramp | Reoverlay deck surface | Not Selected | $800,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 27914 | MN 100 Northbound off Ramp | I-94/694 eastbound | Reoverlay deck surface | Not Selected | $1,800,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 27960 | I-694 Eastbound on Ramp | I-94 eastbound | Reoverlay deck surface | Not Selected | $700,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 27982 | MN 100 Northbound | I-94 eastbound on ramp | Reoverlay deck surface | Not Selected | $1,100,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 82800 | I-94 Eastbound | St. Croix River | Reoverlay deck surface | Not Selected | $13,000,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
65 | 1 | 6592 | MN 1 | Over Stony River | Replace | 2020 | $2,200,000 | Selected prior to policy (in 2019-2022 STIP) |
65 | 1 | 69801N | I-535 Northbound | Over Duluth Cross City Trail | Replace | 2020 | $1,800,000 | Part of Twin Ports Interchange |
65 | 2 | 9059 | MN 11 | Over Warroad River | Replace | 2020 | $500,000 | Selected prior to policy (in 2019-2022 STIP) |
65 | 8 | 9287 | MN 29 | Forest Ave | Replace | 2020 | $2,600,000 | Selected prior to policy (in 2019-2022 STIP) |
65 | Metro | 27161 | MN 55 eastbound off ramp | Highway 5 westbound on ramp | Redeck | 2020 | $300,000 | Redeck with 10 other bridges |
65 | 1 | 69802D | US 53 Northbound On Ramp | At 20th Ave NW | Replace | 2021 | $4,500,000 | Included in Phase 3 of Twin Ports Interchange project. (https://www.dot.state.mn.us/d1/projects/twin-ports-interchange/) |
65 | 3 | 86817 | I-94 Westbound | Wright County Highway 19 | Replace | 2021 | $2,100,000 | Selected prior to policy (in 2019-2022 STIP) |
65 | 3 | 86818 | I-94 Eastbound | Wright County Highway 19 | Replace | 2021 | $2,100,000 | Selected prior to policy (in 2019-2022 STIP) |
65 | 6 | 9504 | Mower County Road 46 | I-90 | Replace | 2021 | $2,100,000 | Selected prior to policy (in 2019-2022 STIP) |
65 | 6 | 9008 | MN 30 | Mill Creek | Replace | 2021 | $1,200,000 | Coordinated with bridge 9009 |
65 | 6 | 5932 | MN 74 | South Fork Whitewater River | Replace | 2021 | $1,100,000 | Selected prior to policy (in 2019-2022 STIP) |
65 | 8 | 6754 | MN 91 | Judicial Ditch #14 | Replace | 2021 | $500,000 | Coordinated with a pavement project |
65 | 8 | 6753 | MN 91 | Chanarambie Creek | Replace | 2021 | $500,000 | Coordinated with a pavement project |
65 | 1 | 69802C | US 53 | 19th St | Replace | 2022 | $13,000,000 | Part of Twin Ports Interchange project |
65 | 2 | 15001 | US 2 Westbound | Over Clearwater River | Superstructure repairs | 2022 | $500,000 | Selected prior to policy (in 2019-2022 STIP) |
65 | 3 | 73876 | I-94 Eastbound | Burlington Northern Santa Fe Railroad | Replace | 2022 | $1,600,000 | Coordinated with bridge 73875 |
65 | 6 | 9728 | I-90 Eastbound | Freeborn County Road 46 | Replace | 2022 | $2,800,000 | Replace due to width |
65 | Metro | 27785 | MN 5 | I-94 | Redeck | 2022 | $900,000 | Selected prior to policy (in 2019-2022 STIP) |
65 | Metro | 27849 | MN 55 Eastbound | I-35W | Redeck | 2022 | $500,000 | Selected as part of the Rethinking I-94 project |
65 | Metro | 27875 | MN 55 Westbound | I-35W | Redeck | 2022 | $700,000 | Selected as part of the Rethinking I-94 project |
65 | Metro | 9713 | US 169 | Highway 10 | Replace | 2022 | $3,700,000 | Selected prior to policy (in 2019-2022 STIP) |
65 | 1 | 6602 | US 53 Northbound | Over St. Louis River | Replace | 2023 | $350,000 | Selected prior to policy (in 2019-2022 STIP) |
65 | 1 | 9469 | I-35 | Carlton County Road 26 | Redeck | 2023 | $600,000 | Selected prior to policy (in 2019-2028 CHIP) |
65 | 6 | 6868 | I-90 Westbound | Cedar River | Replace | 2023 | $3,200,000 | Coordinated with bridge 6869, being delivered with a pavement project |
65 | 6 | 6869 | I-90 Eastbound | Cedar River | Replace | 2023 | $3,200,000 | Coordinated with bridge 6869, being delivered with a pavement project |
65 | 6 | 9180 | Mower County Road 45 | I-90 | Replace | 2023 | $3,700,000 | Being delivered with a pavement project |
65 | 1 | 9789 | I-35 | Near Highway 48 | Replace | 2024 | $4,000,000 | Being replaced with bridge 9790 |
65 | 1 | 9790 | I-35 | Near Highway 48 | Replace | 2024 | $5,000,000 | Being replaced with bridge 9789 |
65 | 4 | 5854 | US 10 Westbound | South Bridge Buffalo River | Replace | 2024 | $2,500,000 | Selected prior to policy (in 2019-2028 CHIP) |
65 | 6 | 6776 | US 61 | Canadian Pacific Rail Line | Replace | 2024 | $4,600,000 | Selected prior to policy (in 2019-2028 CHIP) |
65 | 6 | 9063 | US 61 Southbound | Cedar Creek | Replace | 2024 | $1,900,000 | Selected prior to policy (in 2019-2028 CHIP) |
65 | 6 | 9706 | Mower County Road 15 | I-90 | Redeck | 2024 | $800,000 | Considering overlaying the deck in 2020 with bridges 9505, 9506, 9507, 9705, 9706, 9856, 9859. Needs more investigation. |
65 | Metro | 9417 | MN 65 Northbound | Coon Creek | Replace | 2024 | $1,400,000 | Selected prior to policy (in 2019-2028 CHIP) |
65 | 7 | 17001 | MN 60 | Des Moines River | Replace | 2025 | $5,100,000 | Selected prior to policy (in 2019-2028 CHIP) |
65 | 3 | 73805 | I-94 Westbound | Sauk River | Replace | 2026 | $1,800,000 | Selected prior to policy (in 2019-2028 CHIP) |
65 | 4 | 21815 | I-94 Westbound | Canadian Pacific Rail Line | Redeck | 2026 | $600,000 | Selected prior to policy (in 2019-2028 CHIP) |
65 | 4 | 21816 | I-94 Eastbound | Canadian Pacific Rail Line | Redeck | 2026 | $600,000 | Selected prior to policy (in 2019-2028 CHIP) |
65 | 4 | 4199 | US 59 | Pelican River | Replace | 2026 | $1,100,000 | Selected prior to policy (in 2019-2028 CHIP) |
65 | Metro | 27068 | MN 7 | Cedar Lake Trail | Redeck | 2026 | $2,300,000 | Selected prior to policy (in 2019-2028 CHIP) |
65 | Metro | 27572 | MN 62 Eastbound | Nine Mile Creek | Redeck | 2026 | $1,100,000 | Selected prior to policy (in 2019-2028 CHIP) |
65 | Metro | 27573 | MN 62 Westbound | Nine Mile Creek | Redeck | 2026 | $1,100,000 | Selected prior to policy (in 2019-2028 CHIP) |
65 | 1 | 69846 | South Boundary Ave | Over I-35 | Redeck | 2027 | $2,200,000 | Selected prior to policy (in 2019-2028 CHIP) |
65 | 1 | 38007 | MN 61 | Over Baptism River and Tettegouche State Park Road | Redeck | 2027 | $2,800,000 | Selected prior to policy (in 2019-2028 CHIP) |
65 | 2 | 60001 | US 2 | Over 4th St NW | Replace | 2027 | $4,700,000 | Selected prior to policy (in 2019-2028 CHIP) |
65 | 1 | 9030 | I-535 | Over St. Louis River (Blatnik Bridge) | Replace | 2028 | Estimate Under Development | Selected prior to policy (in 2019-2028 CHIP) |
65 | 1 | 69827 | S 37th 1/2 St | Over I-35 southbound off ramp | Replace | Not Selected | $2,200,000 | |
65 | 1 | 31022S | US 169 Southbound | Near Nashwauk High School | Redeck | Not Selected | $3,800,000 | |
65 | 3 | 9021 | MN 23 Southbound | Highway 10 | Replace | Not Selected | $1,600,000 | |
65 | 3 | 9022 | MN 23 Northbound | Highway 10 | Replace | Not Selected | $1,600,000 | |
65 | 4 | 9876 | Ottertail County Road 15 | I-94 | Replace | Not Selected | $2,200,000 | Recent maintenance work performed to extend remaining service life. |
65 | 6 | 24808 | I-90 Eastbound | I-35 | Replace | Not Selected | $2,900,000 | |
65 | 6 | 74801 | MN 30 | I-35 | Replace | Not Selected | $2,100,000 | |
65 | 6 | 9093 | US 61 Southbound | Pleasant Valley Creek | Replace | Not Selected | $2,100,000 | Considering for possible rehabilitation with bridge 9092 |
65 | 6 | 55026 | US 52 Southbound | Over 36th Ave | Redeck | Not Selected | $700,000 | |
65 | 6 | 9730 | Freeborn County Road 34 | I-90 | Replace | Not Selected | $1,900,000 | |
65 | 7 | 24810 | MN 109 | I-90 | Replace | Not Selected | $3,100,000 | |
65 | 7 | 07018 | US 14 Eastbound | North Riverfront Dr | Replace | Not Selected | $2,800,000 | Waiting to coordinate with another project on the corridor. |
65 | 7 | 9309 | MN 93 | Highway 169 | Replace | Not Selected | $2,300,000 | |
65 | 7 | 07017 | US 14 Westbound | North Riverfront Dr | Replace | Not Selected | $2,800,000 | |
65 | Metro | 19843 | I-35 Southbound | Dakota County Road 64 (205th St) | Replace | Not Selected | $3,200,000 | |
65 | Metro | 27022 | MN 62 Eastbound | Highway 77 | Replace | Not Selected | $3,700,000 | |
65 | Metro | 27201 | MN 55 | Lake St | Reoverlay deck surface | Not Selected | $2,300,000 | |
65 | Metro | 27540 | US 169 | 13th Ave N | Replace | Not Selected | $3,300,000 | |
65 | Metro | 27799R | I-94 Eastbound on Ramp | Lyndale Ave southbound | Replace | Not Selected | $9,100,000 | |
65 | Metro | 27831C | I-394 Westbound on Ramp | I-94 | Replace | Not Selected | $7,000,000 | |
65 | Metro | 27879 | I-35W | 3rd St | Redeck | Not Selected | $3,900,000 | |
65 | Metro | 27879A | I-35W Southbound | 3rd St | Redeck | Not Selected | $1,300,000 | |
65 | Metro | 27899 | I-35W | MC Railyard | Replace | Not Selected | $11,000,000 | |
65 | Metro | 62029 | MN 36 Westbound | Fairview Ave | Replace | Not Selected | $3,400,000 | |
65 | Metro | 62070 | MN 36 | Highway 61 | Replace | Not Selected | $6,200,000 | |
65 | Metro | 62808 | I-94 Westbound | Highway 280 ramps | Replace | Not Selected | $5,200,000 | |
65 | Metro | 62812 | I-94 Westbound | Highway 280 southbound | Replace | Not Selected | $3,600,000 | |
65 | Metro | 82859 | I-494 Eastbound | CP/BNSF railroad and Highway 61 | Reoverlay deck surface | Not Selected | $1,400,000 | |
65 | Metro | 9276 | MN 36 Westbound | Cleveland Avenue | Replace | Not Selected | $3,000,000 | |
65 | Metro | 9277 | MN 36 Eastbound | Cleveland Avenue | Replace | Not Selected | $3,700,000 | |
65 | Metro | 9534 | I-35E | Shepard Road | Replace | Not Selected | $3,200,000 | |
60 | Metro | 9154 | Inbound Airport Road | Outbound Airport Road | Reoverlay deck surface | 2020 | $200,000 | Reoverlay deck surface with 10 other bridges |
60 | Metro | 02046 | US 10 EB | Highway 65 | Reoverlay deck surface | 2021 | $600,000 | Selected prior to policy (in 2019-2022 STIP) |
60 | Metro | 62882 | I-94 Eastbound off ramp | I-94 westbound | Replace | 2021 | $2,900,000 | Selected as part of the Rethinking I-94 project |
60 | 1 | 31012 | US 169 Northbound | Over BNSF Railroad and Depot St | Overlay deck surface | 2023 | $1,200,000 | Project includes bridges 31012, 31010 and 69064 |
60 | 6 | 9178 | I-90 Westbound | 6th St NE | Reoverlay deck surface | 2023 | $700,000 | Coordinated with bridge 9179, being delivered with a pavement project |
60 | Metro | 10022 | US 212 Eastbound | Carver County Road 36 | Overlay deck surface | 2023 | $700,000 | Selected as part of an adjacent pavement project |
60 | 1 | 9493 | US 53 Southbound | Over Highway 37 (Fayal Rd) | Replace | 2024 | $1,900,000 | Selected prior to policy (in 2019-2028 CHIP) |
60 | 2 | 4700 | Demers Ave | Red River | Overlay deck surface | 2024 | $500,000 | Selected prior to policy (in 2019-2028 CHIP) |
60 | 1 | 69082 | US 169 Northbound | Over Abandoned Road | remove | 2025 | $200,000 | Included as part of a pavement project |
60 | 1 | 9494 | US 53 Northbound | Over Highway 37 (Fayal Rd) | Replace | 2025 | $1,900,000 | Selected prior to policy (in 2019-2028 CHIP) |
60 | 1 | 69081 | US169 | Over Abandoned Road | Remove | 2025 | $200,000 | Included as part of a pavement project |
60 | 1 | 69879A | I-35 Southbound | Over Grand Ave | Replace or rehab | 2027 | $11,000,000 | Project includes bridges 69879, 69879A, 69879B, 69879C, 69879D, and 69879E ($44.1 million) |
60 | 1 | 69818N | I-35 Northbound | Over Highway 194 Northbound | Reoverlay deck surface | Not Selected | $3,100,000 | |
60 | 1 | 69818S | I-35 Southbound | Over Highway 194 Northbound | Reoverlay deck surface | Not Selected | $3,100,000 | |
60 | 1 | 69841A | 21st Ave E | Over I-35 | Reoverlay deck surface | Not Selected | $400,000 | |
60 | 6 | 28017 | US 61 Westbound | Mississippi River | Overlay deck surface | Not Selected | $300,000 | |
60 | 7 | 52009 | Belgrade Ave/Mulberry St | Highway 169 | Reoverlay deck surface | Not Selected | $500,000 | Coordination with the City of Mankato required |
60 | 7 | 07019 | US 14 Westbound | Blue Earth County Road 3 | Overlay deck surface | Not Selected | $300,000 | Waiting to coordinate with another project on the corridor. |
60 | Metro | 02041 | MN 610 Westbound | Highway 47 | Reoverlay deck surface | Not Selected | $500,000 | |
60 | Metro | 27072 | MN 47 | BNSF Railroad | Reoverlay deck surface | Not Selected | $1,900,000 | |
60 | Metro | 27234 | MN 610 Eastbound | Highway 169 | Reoverlay deck surface | Not Selected | $400,000 | |
60 | Metro | 27256 | MN 55 Eastbound | UP Railroad | Reoverlay Deck surface | Not Selected | $400,000 | |
60 | Metro | 27798 | I-394 Westbound on ramps | I-94 | Reoverlay deck surface | Not Selected | $300,000 | |
60 | Metro | 27890 | I-694 Westbound off ramp | Highway 252 southbound | Reoverlay deck surface | Not Selected | $300,000 | |
60 | Metro | 27891 | I-694 | Highway 252 southbound | Reoverlay deck surface | Not Selected | $1,600,000 | |
60 | Metro | 27909 | I-94 Eastbound | Shingle Creek | Replace | Not Selected | $2,300,000 | |
60 | Metro | 27926 | I-694 Eastbound | Shingle Creek | Replace | Not Selected | $1,400,000 | |
60 | Metro | 6804 | US 169 | Highway 21 | Replace | Not Selected | $4,600,000 | |
60 | Metro | 70006 | MN 901B Eastbound | UP Railroad | Reoverlay deck surface | Not Selected | $400,000 | |
60 | Metro | 82034A | I-494 Westbound on Ramp | BNSF Railroad/ CP Railroad | Reoverlay deck surface | Not Selected | $1,700,000 | |
60 | Metro | 82037 | Ramp I-494 Eastbound tO US 61 southbound | BNSF Railroad/ CP Railroad | Reoverlay deck surface | Not Selected | $1,000,000 | |
60 | Metro | 82860 | I-494 Westbound | US 61, CP/BNSF Railroad | Reoverlay deck surface | Not Selected | $1,100,000 | |
60 | Metro | 9431 | MN 100 | W 70th St | Reoverlay deck surface | Not Selected | $1,100,000 | |
55 | 1 | 09006 | MN 210 | Over BNSF Railroad | Redeck | 2021 | $1,300,000 | Selected prior to policy (in 2019-2022 STIP) |
55 | 1 | 5923 | MN 61 | Over Pigeon River | Redeck | 2023 | $2,200,000 | Selected prior to policy (in 2019-2028 CHIP) |
55 | 1 | 9788 | I-35 | St. Louis River | Replace | 2025 | $2,000,000 | Being replaced with bridge 9787 |
55 | 7 | 53809 | Nobles County Road 15 | I-90 | Replace | 2025 | $1,900,000 | Coordinating with another MnDOT project. |
55 | Metro | 27831 | I-394 | Dunwoody Blvd | Redeck | 2026 | $42,000,000 | Early project development work indicates work type may be overlay of deck surface and not deck replacement. If so, score increases to 90 and cost decreases. |
55 | Metro | 6805 | MN 280 | Robbins St / U of M Transitway | Replace | 2026 | $32,000,000 | Coordinated with pavement project |
55 | Metro | 7264 | MN 62 Westbound | Valley View Road | Replace | 2026 | $2,100,000 | Coordinated with pavement project |
55 | 8 | 42006 | MN 23 | Redwood River | Replace | 2027 | $2,000,000 | Selected prior to policy (in 2019-2028 CHIP) |
55 | 1 | 69018 | US 53 Northbound | Over Whiteface River | Replace | 2029 | $2,000,000 | Selected prior to policy (in 2019-2028 CHIP) |
55 | 3 | 5907 | MN 27 | Mississippi River | Replace | Not Selected | $12,000,000 | |
55 | 6 | 66807 | Rice County Road 3 | I-35 | Replace | Not Selected | $2,400,000 | |
55 | Metro | 9893 | I-94 | Franklin Terrace | Replace | Not Selected | $6,600,000 | |
53 | Metro | 27792 | I-394 | I-94 | Replace | 2026 | $22,000,000 | Minor repairs performed in 2017 to get to replacement in 2026 |
50 | Metro | 9306 | MN 5 Westbound on Ramp | Bloomington Rd | Reoverlay deck surface | 2020 | $300,000 | Reoverlay deck surface with 10 other bridges |
50 | Metro | 4190 | MN 55 | Minnesota River | Reoverlay deck surface | 2022 | $7,100,000 | Selected prior to policy (in 2019-2022 STIP) |
50 | Metro | 19033 | US 52 Southbound | Vermillion River | Reoverlay deck surface | 2023 | $300,000 | Selected prior to policy (in 2019-2028 CHIP) |
50 | Metro | 27193 | MN 7 | Minnehaha Creek | Reoverlay deck surface | 2026 | $400,000 | Minor repairs |
50 | 1 | 69879D | I-35 Southbound On Ramp | Over 57th Ave W | Replace or rehab | 2027 | $800,000 | Project includes bridges 69879, 69879A, 69879B, 69879C, 69879D, and 69879E |
50 | 1 | 58808 | I-35 Northbound | Over Kettle River | Overlay deck surface | Not Selected | $600,000 | |
50 | 1 | 58807 | I-35 Southbound | Over Kettle River | Overlay deck surface | Not Selected | $600,000 | |
50 | 1 | 69019 | US 53 Northbound | Over Paleface River | Replace | Not Selected | $1,200,000 | |
50 | 6 | 24815 | I-90 Westbound | Over Ditch/Creek Near School Section Lake | Reoverlay deck surface | Not Selected | $800,000 | |
50 | 6 | 24816 | I-90 Eastbound | Over Ditch/Creek Near School Section Lake | Reoverlay deck surface | Not Selected | $800,000 | |
45 | 1 | 69801J | I-535 Northbound Seg 1 | Southbound off ramp To I-35 | Replace | 2020 | $3,300,000 | Included in phase 2 of Twin Ports Interchange project |
45 | 1 | 69801F | I-535 Southbound Seg 1 | Ramp To I-35 southbound | Replace | 2020 | $5,600,000 | Included in phase 2 of Twin Ports Interchange project |
45 | 1 | 69801C | I-535 Southbound On Ramp | Over BNSF Railyard | Replace | 2020 | $4,500,000 | Included in phase 2 of Twin Ports Interchange project |
45 | 1 | 69824 | I-535 Southbound On Ramp | I-535 /I-35 northbound | Replace | 2020 | $9,700,000 | Included in phase 1 of Twin Ports Interchange project. |
45 | 1 | 69825 | I-535 Northbound Off Ramp | BNSF railroad | Replace | 2020 | $5,900,000 | Included in Phase 1 of Twin Ports Interchange project. |
45 | 1 | 69801K | I-535 Northbound Off Ramp | I-35 southbound | Replace | 2020 | $4,000,000 | Included in Phase 2 of Twin Ports Interchange project. |
45 | Metro | 02010 | US 10 | Main St | Replace | 2021 | $4,000,000 | Selected prior to policy (in 2019-2022 STIP) |
45 | Metro | 9716 | US 10 | Anoka County Road 7/7th Ave | Replace | 2022 | $3,000,000 | Selected prior to policy (in 2019-2022 STIP) |
45 | Metro | 9675 | US 52 Northbound | Vermillion River | Replace | 2023 | $2,100,000 | Selected prior to policy (in 2019-2028 CHIP) |
45 | 7 | 07003 | MN 60 | Blue Earth County Road 6 | Replace | 2024 | $4,600,000 | Selected prior to policy (in 2019-2028 CHIP), also coordinating with another project |
45 | Metro | 9717 | US 10 | BNSF railroad | Replace | 2024 | $7,400,000 | Coordinated with Rum River project |
45 | Metro | 9779 | MN 13 Southbound | I-35W | Replace | 2025 | $3,800,000 | Selected due to low clearance and repetitive bridge hits |
45 | Metro | 9780 | MN 13 Northbound | I-35W | Replace | 2025 | $3,800,000 | Selected due to low clearance and repetitive bridge hits |
45 | Metro | 62844 | MN 280 Northbound | Highway 280 southbound | Replace | 2026 | $3,600,000 | Coordinated with pavement project |
45 | Metro | 27831D | I-394 Eastbound off Ramp | I-94 | Replace | 2026 | $7,200,000 | Substructure repair completed in 2019 to get to replacement in 2026 |
45 | 1 | 69020 | US 53 Southbound | Saint Louis River | Redeck | 2027 | $1,000,000 | |
45 | Metro | 19807 | I-35 Southbound | Dakota County Road 50 | Replace | Not Selected | $2,400,000 | |
45 | Metro | 27021 | MN 62 Westbound | Highway 77 | Replace | Not Selected | $3,700,000 | |
45 | Metro | 27793 | I-94 Northbound off Ramp | I-94 Ramp to southbound Lyndale | Replace | Not Selected | $4,200,000 | |
45 | Metro | 27848 | I-94 Westbound | I-35W southbound on ramp | Replace | Not Selected | $9,000,000 | |
45 | Metro | 27850 | I-94 Westbound on Ramp | I-35W southbound on ramp | Replace | Not Selected | $4,800,000 | |
45 | Metro | 62030 | MN 36 Eastbound | Fairview Avenue | Replace | Not Selected | $4,200,000 | |
45 | Metro | 9108 | US 52 Northbound | UP Railroad | Replace | Not Selected | $2,300,000 | |
45 | Metro | 9110 | MN 55 Eastbound | Highway 52 northbound | Replace | Not Selected | $3,700,000 | |
45 | Metro | 9538 | MN 110 Eastbound | I-35E | Replace | Not Selected | $4,000,000 | |
45 | Metro | 9569 | MN 36 Westbound | I-35W | Replace | Not Selected | $6,400,000 | |
40 | 1 | 69808A | I-535 Northbound On Ramp | Over Garfield Ave and railroad | Overlay deck surface | 2020 | $800,000 | Being replaced as part of Twin Ports Interchange |
40 | 1 | 69809 | I-535 Southbound Off Ramp | Over BNSF railroad | Overlay deck surface | 2020 | $1,700,000 | Being replaced as part of Twin Ports Interchange |
40 | 1 | 69810 | I-535 | Over BNSF railroad | Overlay deck surface | 2020 | $900,000 | Being rehabbed as part of Twin Ports Interchange |
40 | Metro | 10021 | US 212 Westbound | TCW railroad/Carver County Rd 36 | Overlay deck surface | 2020 | $700,000 | Selected prior to policy (in 2019-2022 STIP) |
40 | Metro | 27118 | MN 5 Eastbound ramp to MN 55 | Highway 5 westbound on ramp | Overlay deck surface | 2020 | $200,000 | Selected prior to policy (in 2019-2022 STIP) |
40 | Metro | 02035 | US 10 | Highway 47 northbound | Reoverlay deck surface | 2021 | $2,300,000 | Selected prior to policy (in 2019-2022 STIP) |
40 | Metro | 02045 | US 10 Westbound | Highway 65 | Reoverlay deck surface | 2021 | $500,000 | Selected prior to policy (in 2019-2022 STIP) |
40 | 1 | 69064 | US 169 Northbound | Over BNSF railroad | Reoverlay deck surface | 2023 | $800,000 | Project includes bridges 31012, 31010 and 69064 |
40 | 1 | 31010 | US 169 Northbound | Over BNSF railroad spur | Reoverlay deck surface | 2023 | $60,000 | Project includes bridges 31012, 31010 and 69064 |
40 | 6 | 9858 | I-90 Eastbound | Root River | Overlay deck surface | 2023 | $400,000 | Being delivered with I-90 NHS pavement project |
40 | 1 | 69063 | US 169 Southbound | Over BNSF railroad | Reoverlay deck surface | 2024 | $300,000 | Project includes bridges 31009, 31011, and 69063 |
40 | 1 | 31009 | US 169 Southbound | Over BNSF railroad spur | Reoverlay deck surface | 2024 | $300,000 | Project includes bridges 31009, 31011, and 69063 |
40 | 1 | 31011 | US 169 Southbound | BNSF railroad and Depot St | Reoverlay deck surface | 2024 | $400,000 | Project includes bridges 31009, 31011, and 69063 |
40 | 7 | 53817 | I-90 Westbound | Highway 59 | Overlay deck surface | 2025 | $300,000 | Selected prior to policy (in 2019-2028 CHIP) |
40 | 7 | 53818 | I-90 Eastbound | Highway 59 | Overlay deck surface | 2025 | $300,000 | Selected prior to policy (in 2019-2028 CHIP) |
40 | 7 | 53821 | Nobles County Road 3 | I-90 | Overlay deck surface | 2025 | $300,000 | Selected prior to policy (in 2019-2028 CHIP) |
40 | 1 | 69879C | I-35 Northbound On Ramp | Over 59th Ave W | Replace or rehab | 2027 | $1,300,000 | Project includes bridges 69879, 69879A, 69879B, 69879C, 69879D, and 69879E ($44.1 million) |
40 | 1 | 69887 | I-35 | Between Garfield Ave and Jeno's Walk | Replace | Not Selected | $52,000,000 | |
40 | 3 | 73864 | Stearns County Highway 138 | I-94 | Overlay deck surface | Not Selected | $500,000 | |
40 | 3 | 86810 | Wright County Road 111 | I-94 | Overlay deck surface | Not Selected | $400,000 | |
40 | 3 | 86808 | Under Grover Ave NW | I-94 | Overlay deck surface | Not Selected | $400,000 | |
40 | 3 | 73852 | Stearns Couny Highway 136 | I-94 | Overlay deck surface | Not Selected | $400,000 | |
40 | 6 | 79003 | US 61 Southbound | East Indian Creek | Overlay deck surface | Not Selected | $500,000 | |
40 | 6 | 24824 | Freeborn County Road 19 | I-35 | Overlay deck surface | Not Selected | $800,000 | |
40 | 7 | 24809 | Freeborn County Road 61 | I-90 | Overlay deck surface | Not Selected | $400,000 | |
40 | 7 | 32814 | Jackson County Road 85 | I-90 | Overlay deck surface | Not Selected | $700,000 | |
40 | 7 | 52007 | Nicollet County Highway 117 | Highway 14 | Overlay deck surface | Not Selected | $1,100,000 | |
40 | 7 | 46815 | I-90 Westbound | Lily Creek | Overlay deck surface | Not Selected | $100,000 | |
40 | 7 | 46816 | I-90 Eastbound | Lily Creek | Reoverlay deck surface | Not Selected | $100,000 | |
40 | 7 | 32816 | Jackson County Road 67 | I-90 | Overlay deck surface | Not Selected | $600,000 | |
40 | 7 | 32818 | Jackson County Road 67 | I-90 | Overlay deck surface | Not Selected | $700,000 | |
40 | 7 | 32805 | Jackson County Road 17 | I-90 | Overlay deck surface | Not Selected | $600,000 | |
40 | 7 | 46811 | I-90 Westbound | Highway 263 | Overlay deck surface | Not Selected | $400,000 | |
40 | 7 | 67811 | 200th Ave | I-90 | Overlay deck surface | Not Selected | $600,000 | |
40 | 7 | 46813 | Martin County Road 130 | I-90 | Overlay deck surface | Not Selected | $600,000 | |
40 | 7 | 07037 | US 169 | Blue Earth River | Overlay deck surface | Not Selected | $300,000 | Will consider with 2027 pavement project |
40 | 7 | 46824 | Martin County Road 59 | I-90 | Reoverlay deck surface | Not Selected | $500,000 | |
35 | Metro | 6850 | I-494 Westbound | I-35W | Replace | 2023 | $2,700,000 | Selected prior to policy (in 2019-2028 CHIP) |
35 | Metro | 27794 | I-394 Eastbound off Ramp | I-94 Ramp to southbound Lyndale | Replace | 2026 | $3,400,000 | Selected prior to policy (in 2019-2028 CHIP) |
35 | 1 | 58801 | MN 70 | Over I-35 | Replace | Not Selected | $2,000,000 | |
35 | 1 | 31022N | US 169 Northbound | Near Nashwauk Highschool | Redeck | Not Selected | $3,400,000 | |
35 | 7 | 67810 | Rock County Road 3 | I-90 | Replace | Not Selected | $1,600,000 | |
35 | 7 | 9774 | Rock County Road 6 | I-90 | Replace | Not Selected | $2,000,000 | |
30 | 6 | 9890 | US 63 Northbound | I-90 | Replace | 2020 | $3,700,000 | Selected prior to policy (in 2019-2022 STIP) |
30 | 6 | 9889 | US 63 Southbound | I-90 | Replace | 2020 | $2,700,000 | Selected prior to policy (in 2019-2022 STIP) |
30 | 6 | 85816 | I-90 Eastbound | Dakota Valley Road | Replace | 2020 | $1,800,000 | Selected prior to policy (in 2019-2022 STIP) |
30 | 6 | 9414 | US 52 Southbound | Zumbro River | Replace | 2021 | $2,300,000 | Selected prior to policy (in 2019-2022 STIP) |
30 | 3 | 73875 | I-94 Westbound | BNSF railroad | Replace | 2022 | $1,600,000 | Coordinate with bridge 73876 |
30 | 3 | 6896 | I-94 Eastbound | Sauk River | Replace | 2024 | $1,800,000 | Selected prior to policy (in 2019-2028 CHIP) |
30 | 7 | 07036 | MN 22 | Over railroad | Overlay deck surface | 2024 | $400,000 | Coordinated with pavement project |
30 | Metro | 5891 | MN 55 | CP railroad | Replace | 2024 | $7,100,000 | Coordinated with pavement project |
30 | 3 | 71002 | US 169 Northbound | Highway 10 | Replace | 2025 | $3,100,000 | Selected prior to policy (in 2019-2028 CHIP) |
30 | 3 | 73818 | I-94 Eastbound Off Ramp | I-94 | Replace | 2025 | $2,100,000 | Selected prior to policy (in 2019-2028 CHIP) |
30 | 3 | 73850 | I-94 Eastbound | Highway 238 | Replace | 2025 | $2,100,000 | Selected prior to policy (in 2019-2028 CHIP) |
30 | 3 | 6897 | I-94 Eastbound | Sauk River | Replace | 2025 | $1,800,000 | Selected prior to policy (in 2019-2028 CHIP) |
30 | 3 | 86807 | MN 24 | I-94 | Replace | 2025 | $3,200,000 | |
30 | 3 | 73811 | I-94 Westbound | Sauk River | Replace | 2026 | $1,800,000 | Selected prior to policy (in 2019-2028 CHIP) |
30 | 7 | 52008 | US 169 | Highway 169 southbound on ramp | Reoverlay deck surface | 2026 | $200,000 | Selected prior to policy (in 2019-2028 CHIP) |
30 | 7 | 52012 | US 169 | Highway 169 northbound exit ramp | Reoverlay deck surface | 2026 | $400,000 | Selected prior to policy (in 2019-2028 CHIP) |
30 | 3 | 73809 | I-94 Westbound | Sauk River | Replace | Not Selected | $1,800,000 | |
30 | 3 | 05003 | MN 15 Eastbound | Highway 10 | Replace | Not Selected | $2,800,000 | |
30 | 6 | 6640 | MN 21 | Cannon River | Replace | Not Selected | $3,600,000 | |
30 | Metro | 19819 | MN 55 | I-35E southbound on ramp | Redeck | Not Selected | $8,600,000 | |
30 | Metro | 27169 | MN 55 Westbound | Highway 5 Eastbound on Ramp | Replace | Not Selected | $2,600,000 | |
30 | Metro | 9500 | MN 100 | Highway 62 | Replace | Not Selected | $10,000,000 | |
29 | 7 | 07011 | US 14 | Minnesota River and Union Pacific railroad | Replace | Not Selected | $24,000,000 | |
20 | 6 | 9659 | US 52 Southbound | Highway 60 | Replace | 2021 | $2,200,000 | Selected prior to policy (in 2019-2022 STIP). Coordinated with bridge 9660. |
20 | 4 | 76004 | US 12 | Cottonwood Creek | Replace | 2023 | $1,200,000 | Being replaced due to channel span design and load rating |
20 | 4 | 76003 | US 12 | Chippewa River | Replace | 2023 | $1,200,000 | Being replaced due to channel span design and load rating |
20 | 1 | 38008 | MN 61 | Over Crow Creek | Redeck | 2024 | $1,700,000 | Pushed back from 2019 |
20 | 3 | 5428 | US 71 | Sauk River | Replace | 2024 | $2,600,000 | Selected prior to policy (in 2019-2028 CHIP) |
20 | 6 | 9705 | Mower County Road 1 | I-90 | Redeck | 2024 | $800,000 | Selected prior to policy (in 2019-2028 CHIP) |
20 | 6 | 55809 | I-90 Westbound | Highway 52 | Replace | 2024 | $4,500,000 | Selected prior to policy (in 2019-2022 STIP but delayed) |
20 | 6 | 55810 | I-90 Eastbound | Highway 52 | Replace | 2024 | $3,700,000 | Selected prior to policy (in 2019-2022 STIP but delayed) |
20 | Metro | 6817 | MN 65 Southbound | Coon Creek | Replace | 2024 | $700,000 | Selected prior to policy (in 2019-2028 CHIP) |
20 | Metro | 82855 | I-494 | Mississippi River | Overlay deck surface | 2024 | $3,500,000 | Resurfacing to extend remaining service life |
20 | Metro | 82856 | I-494 | Mississippi River | Overlay deck surface | 2024 | $3,500,000 | Resurfacing to extend remaining service life |
20 | 3 | 73820 | I-94 Eastbound | Stearns County Road 184 | Replace | 2025 | $2,000,000 | Selected prior to policy (in 2019-2028 CHIP) |
20 | 6 | 9106 | MN 76 | Money Creek | Replace | 2028 | $2,000,000 | Selected prior to policy (in 2019-2028 CHIP) |
20 | 6 | 5848 | MN 16 | Crystal Creek | Replace | 2028 | $1,800,000 | Selected prior to policy (in 2019-2028 CHIP) |
20 | 3 | 73849 | I-94 Westbound | Highway 238 | Replace | Not Selected | $2,100,000 | |
20 | 6 | 9092 | US 61 Northbound | Pleasant Valley Creek | Replace | Not Selected | $2,100,000 | |
20 | 6 | 9046 | US 61 Southbound | Burns Creek | Replace | Not Selected | $2,000,000 | |
20 | 6 | 9727 | I-90 Westbound | Freeborn County Road 46 | Redeck | Not Selected | $1,100,000 | |
20 | 6 | 55025 | US 52 Northbound | Over 36th Ave | Redeck | Not Selected | $700,000 | |
20 | 6 | 85815 | I-90 Westbound | Winona County Road 101 | Replace | Not Selected | $1,600,000 | |
20 | 7 | 22812 | Faribault County Road 19 | I-90 | Redeck | Not Selected | $1,000,000 | |
20 | 7 | 22819 | Faribault County Road 31 | I-90 | Redeck | Not Selected | $1,200,000 | |
20 | 8 | 43008 | US 212 Eastbound | Buffalo Creek | Replace | Not Selected | $1,800,000 | |
20 | Metro | 27171 | MN 55 Westbound | Bloomington Rd | Replace | Not Selected | $1,800,000 | |
20 | Metro | 82001 | US 8 | 2nd St NW | Replace | Not Selected | $5,400,000 | |
20 | Metro | 82002 | US 8 | Highway 61 | Replace | Not Selected | $6,400,000 | |
18 | 1 | 69882N | I-35 Northbound | South of Garfield Ave near BNSF railroad | Replace | 2020 | $18,000,000 | Included in phase 1 of Twin Ports Interchange project. |
18 | 1 | 69881N | I-35 Southbound | South of Garfield Ave near BNSF railroad | Replace | 2020 | $18,000,000 | Included in phase 1 of Twin Ports Interchange project. |
10 | 6 | 85814 | Mower County Road 12 | I-90 | Replace | 2020 | $2,500,000 | Selected prior to policy (in 2019-2022 STIP) |
10 | Metro | 27766 | MN 5 Eastbound | I-494 | Redeck | 2020 | $300,000 | Selected prior to policy (in 2019-2022 STIP) |
10 | 7 | 53815 | I-90 Westbound | Rowe Ave | Replace | 2025 | $2,700,000 | Selected prior to policy (in 2019-2028 CHIP) |
10 | 3 | 3355 | US 169 | White Fish Creek | Redeck | Not Selected | $120,000 | |
10 | 6 | 24807 | I-90 Westbound | I-35 | Replace | Not Selected | $2,900,000 | |
10 | 6 | 6765 | US 65 Northbound | Main St | Replace | Not Selected | $2,300,000 | |
10 | 7 | 07023 | US 14 | Highway 169 | Redeck | Not Selected | $3,300,000 | |
10 | 7 | 46801 | Martin County Road 7 | I-90 | Redeck | Not Selected | $900,000 | |
10 | 7 | 53813 | I-90 Westbound | Nobles County Road 25 | Replace | Not Selected | $2,500,000 | |
10 | 7 | 46832 | Martin County Road 23 | I-90 | Redeck | Not Selected | $1,000,000 | |
10 | 7 | 32801 | Jackson County Road 5 | I-90 | Redeck | Not Selected | $1,000,000 | |
10 | 7 | 22811 | MN 254 | I-90 | Redeck | Not Selected | $1,300,000 | |
10 | 7 | 53814 | I-90 Eastbound | Nobles County Road 25 | Replace | Not Selected | $2,500,000 | |
10 | Metro | 62847 | I-94 | Fairview Avenue | Replace | Not Selected | $6,600,000 | Will be evaluated as part of the Rethinking I-94 project |
10 | Metro | 7265 | MN 62 Eastbound | Valley View Road | Replace | Not Selected | $2,100,000 | |
0 | 1 | 69881 | I-35 Southbound | South of Garfield Ave Near BNSF Rail | Replace | 2020 | $7,000,000 | Included in phase 1 of Twin Ports Interchange project. |
0 | 1 | 69801I | I-535 Northbound On Ramp | Over fill near BNSF rail yard | Replace | 2020 | $1,800,000 | Included in phase 2 of Twin Ports Interchange project. |
0 | 1 | 69801M | I-535 Northbound On Ramp | Over fill near BNSF rail yard | Replace | 2020 | $2,300,000 | Included in phase 1 of Twin Ports Interchange project. |
0 | 1 | 69882A | I-35 Northbound On Ramp | Over fill near BNSF rail yard | Replace | 2020 | $1,700,000 | Included in phase 1 of Twin Ports Interchange project. |
0 | 1 | 69801A | I-535 Southbound Off Ramp | Over fill near BNSF rail yard | Replace | 2020 | $1,500,000 | Included in phase 1 of Twin Ports Interchange project. |
0 | 1 | 69801E | I-535 Southbound Off Ramp | Over fill near BNSF rail yard | Replace | 2020 | $2,700,000 | Included in phase 2 of Twin Ports Interchange project. |
0 | 1 | 69801L | I-535 Northbound Seg 2 | Over I-35 southbound | Replace | 2020 | $1,900,000 | Included in phase 2 of Twin Ports Interchange project. |
0 | 1 | 69881A | I-35 Southbound Ramp | Over fill near BNSF rail yard | Replace | 2020 | $1,800,000 | Included in phase 1 of Twin Ports Interchange project. |
0 | 1 | 69882B | I-35 Northbound On Ramp | Over fill near BNSF rail yard | Replace | 2020 | $1,400,000 | Included in phase 1 of Twin Ports Interchange project. |
0 | 1 | 69801H | I-535 Northbound On Ramp | Over I-35 southbound and northbound off ramp | Replace | 2020 | $2,300,000 | Included in phase 2 of Twin Ports Interchange project. |
0 | 1 | 69010 | US 53 Northbound | Over 6th Ave W | Redeck | 2021 | $100,000 | Selected prior to policy (in 2019-2022 STIP) |
0 | 1 | 69802B | US 53 Southbound on Ramp | 21st Ave on ramp | Replace | 2021 | $2,000,000 | Part of Twin Ports Interchange project |
0 | 1 | 6902E | US 53 Southbound off Ramp | Over fill near BNSF rail yard | Replace | 2021 | $2,000,000 | Part of Twin Ports Interchange project |
0 | 1 | 69009 | US 53 Southbound | Over 6th Ave W | Replace | 2021 | $2,000,000 | Selected prior to policy (in 2019-2022 STIP) |
0 | 6 | 9660 | US 52 Northbound | Highway 60 | Replace | 2021 | $1,600,000 | Selected prior to policy (in 2019-2022 STIP). Coordinated with bridge 9659 |
0 | 3 | 6870 | I-94 Eastbound | Sauk River | Replace | 2025 | $1,800,000 | Selected prior to policy (in 2019-2028 CHIP) |
0 | 7 | 52011 | US 169 Ramp | Highway 169 Ramp | Reoverlay deck surface | 2026 | $200,000 | Selected prior to policy (in 2019-2028 CHIP) |
0 | Metro | 6894 | MN 280 | BNSF Railroad/Energy Park Dr | Replace | 2026 | $12,000,000 | Coordinated with pavement project |
0 | 1 | 69879B | I-35 Southbound Off Ramp | Over fill south of Roosevelt St | Replace/rehab | 2027 | $1,200,000 | Project includes bridges 69879, 69879A, 69879B, 69879C, 69879D, and 69879E ($44.1 million) |
0 | 7 | 22814 | MN 22 | I-90 | Replace | 2027 | $4,000,000 | Selected prior to policy (in 2019-2028 CHIP) |
0 | 3 | 73807 | I-94 Westbound | Highway 4 | Replace | Not Selected | $1,600,000 | |
0 | 6 | 9449 | US 61 | East 5th St | Replace | Not Selected | $3,400,000 | |
0 | 6 | 55815 | I-90 Westbound | Olmsted County Road 10 | Replace | Not Selected | $2,200,000 | |
0 | 6 | 9045 | US 61 Northbound | Burns Creek | Replace | Not Selected | $2,000,000 | |
0 | Metro | 27831A | I-394 Westbound on Ramp | Dunwoody Blvd | Replace | Not Selected | $1,600,000 | |
0 | Metro | 27831B | I-394 Eastbound off Ramp | Dunwoody Blvd | Replace | Not Selected | $2,200,000 | |
0 | Metro | 9605 | US 10 | I-35W | Replace | Not Selected | $5,600,000 |