Minnesota Department of Transportation

511 Travel Info

Project selection

Increasing the transparency of how we select highway construction projects

Urban non-freeway/non-expressway pavement projects

MnDOT District 4

How the projects scored in 2019

The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed. View more detailed scores (Excel).

Last updated December 2019

Score Community Route Description  High level construction cost estimate for planning purposes  Year Planned (FY) Comments
82 Henning MN108 Reconstruction in Henning $4,600,000 2024  
79 Moorhead US10/US75 Reconstruction in Moorhead $25,000,000 2025  
78 Alexandria MN29 Reconstruction in Alexandria $34,000,000 2029  
76 Osage MN34 Reclaim and overlay in Osage $400,000 2024  
76 Fergus Falls MN210 Reconstruction in Fergus falls  $5,700,000 2029  
75 Frazee MN87 Reconstruction in Frazee $8,500,000 2022  
75 Appleton MN7/MN119 Reconstruction in Appleton $18,000,000 Not selected District anticipates the pavement condition will not deteriorate as fast as the model is projecting
73 Breckenridge US75 Reconstruction in Breckenridge $14,000,000 Not selected District anticipates the pavement condition will not deteriorate as fast as the model is projecting
73 Alexandria MN29 Medium mill and overlay in Alexandria $1,500,000 Not selected District anticipates the pavement condition will not deteriorate as fast as the model is projecting
72 Dilworth US10 Reconstruction in Dilworth $30,000,000 2027
72 Fergus Falls MN210 Reconstruction in Fergus Falls $14,000,000 2029
71 Ottertail MN78 Reclaim and overlay in Ottertail $300,000 Not selected District anticipates the pavement condition will not deteriorate as fast as the model is projecting
69 Pelican Rapids US59/MN108 Reconstruction in Pelican Rapids $10,000,000 2024 Selected prior to policy (in 2020-2028 CHIP)
68 Detroit Lakes MN34 Reconstruction in Detroit Lakes $10,500,000 Not selected
66 Browns Valley MN28 Thin mill and overlay in Browns Valley $400,000 2027 Selected prior to policy (in 2020-2028 CHIP)
66 Benson US12/MN9/MN29 Overlay in Benson $31,000,000 Not selected
64 Wadena MN29 Medium mill and overlay in Wadena $300,000 2026 Selected prior to policy (in 2020-2028 CHIP)
63 Wendell MN55 Reclaim and overlay in Wendell $700,000 Not selected
61 Cyrus MN28 Reconstruction in Cyrus $2,700,000 2024 Selected prior to policy (in 2020-2028 CHIP)
59 Alexandria MN29 Major concrete repair in Alexandria $1,800,000 2029 Selected prior to policy (in 2020-2028 CHIP)
58 Ottertail MN108 Medium mill and overlay in Ottertail $200,000 2024 Selected prior to policy (in 2020-2028 CHIP)
58 Beardsley MN28 Thin mill and overlay in Beardsley $300,000 2027 Selected prior to policy (in 2020-2028 CHIP)
58 Battle Lake MN78 Reclaim and overlay in Battle lake $500,000 Not selected
55 Alexandria MN29 Reconstruction in Alexandria $9,100,000 2028 Selected prior to policy (in 2020-2028 CHIP)
55 Glyndon US10 Reconstruction in Glyndon $11,000,000 Not selected
49 Elizabeth US59 Thick mill and overlay in Elizabeth $700,000 2026 Coordinated with an adjacent NHS pavement project
46 Barrett MN55 Reconstruction in Barrett $3,000,000 Not selected  
45 Erhard US59 Thick mill and overlay in Erhard $1,000,000 2026 Coordinated with an adjacent NHS pavement project
44 Starbuck MN28/MN29/MN114 Reconstruction in multiple locations in Starbuck $7,000,000 2020 Selected prior to policy (in 2019-2022 STIP)
42 Hoffman MN27 Thin mill and overlay in Hoffman $300,000 Not selected  
41 Ortonville US12/MN7 Thin mill and overlay in Ortonville $1,300,000 Not selected  
41 Correll MN7 Thin mill and overlay in Correll $300,000 Not selected  
38 Detroit Lakes US10 Reconstruction in Detroit Lakes $33,000,000 Not selected