Minnesota Department of Transportation

511 Travel Info

Project selection

Increasing the transparency of how we select highway construction projects

National Highway System pavement projects

MnDOT District 1

How the projects scored in 2019

The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed. View more detailed scores (Excel).

Last updated December 2019

Score Route Description  High level construction cost estimate for planning purposes  Year Planned (FY) Comments
98 I-35 Mill and overlay from bridge over DM&IR Railroad to south end of bridge over Highway 23 $16,000,000 2022
95 I-35 Medium mill and overlay from Highway 23 to 50th Ave W Bridge $300,000 2027 Part of 2027 bridge project
92 US169 Medium mill and overlay from Pokegama Lake bridge to Elizabeth Ave $17,000,000 2028  
91 US2 Medium mill and overlay from Itasca County Highway 62 to Highway 169 $15,000,000 2027 Also listed as Urban Pavement project
91 I-35 Unbonded overlay from south of Pine-Carlton County line to 2.6 miles south of County Road 4 $23,000,000 Not Selected Project is being developed to be ready if additional funding becomes available
89 MN61 Medium mill and overlay from 28th Ave E to 40th Ave E $5,400,000 2026 Also listed as an Urban Pavement project 
88 I-35 Major concrete pavement rehabilitation/diamond grinding from under Lake Ave to Highway 61 $6,900,000 2024  
87 US2 Major concrete pavement rehabilitation/diamond grinding from Reference point 260 to I35 $800,000 Not Selected Waiting to avoid multiple detours in same area. 
86 I-35 Medium mill and overlay from under 5th Ave bridge to under Lake Ave bridge $900,000 2027  
84 MN194 Medium mill and overlay from Highway 53 to Mesaba Ave $19,000,000 2027 Also listed as Urban Pavement project
83 US53 Medium mill and overlay from Highway 37 to Bourgin Dr $3,200,000 2029  
82 MN61 Medium mill and overlay from Knife River to Duluth Missabe Illinois Railroad Bridge $7,600,000 2022  
82 MN61 Medium mill and overlay from McQuade Road to Knife River $5,900,000 2024 Northbound and southbound limits differ
82 US169 Meduim mill and overlay from St. Louis County Road 67 to St Louis County Road 109 $16,000,000 2024  
82 I-35 Full mill and replace from Bridge number 9790 over BNSF railroad to one mile north of bridge number 9790 $900,000 Not Selected Waiting to coordinate with another project
81 MN73 Medium mill and overlay from Moose Horn River to Highway 27 $300,000 Not Selected District anticipates the pavement condition will not deteriorate as fast as the model is projecting
81 US2 Medium mill and overlay from 0.4 miles east of bridge over Prairie River to Highway 200 $22,000,000 2021  
81 MN61 Medium mill and overlay from 40th Ave E to 60th Ave E $6,700,000 2027 Also listed as Urban Pavement project
81 US53 Medium mill and overlay from wayside rest to Rice River bridge $13,000,000 Not Selected Schedule preventive maintenance 
81 US53 Medium mill and overlay from Little Fork River Bridge to St. Louis County Road 901 $9,400,000 Not Selected Not a district priority, continue to monitor pavement performance
81 I-35 Medium mill and overlay from south of Carlton County Highway 4 to Bridge over Highway 210 $11,000,000 2028  
80 MN61 Medium mill and overlay from 2.6 miles north of Cook County Highway 6 to 0.9 miles south of Onion River $10,000,000 2023  
80 US53 Medium mill and overlay from St. Louis County Highway 52 to Paleface River $2,900,000 2028  
80 US169 Medium mill and overlay from Highway 65 to old Highway 169 $6,800,000 Not Selected Schedule preventive maintenance 
79 MN194 Reconstruction from Anderson Rd to Arlington Ave $9,500,000 2027 Also listed as Urban Pavement project
78 MN210 Medium mill and overlay from west of Highway 65 to Highway 73 $17,000,000 2029  
78 US53 Medium mill and overlay from Paleface River to St. Louis County Highway 16 $6,700,000 Not Selected Project is being developed to be ready if additional funding becomes available
77 MN61 Reclaim and overlay from Cook County Highway 14 to Reservation River Road $16,000,000 2024  
77 US53 Resurface on Highway 53 in multiple locations $12,000,000 2020  
76 US53 Medium mill and overlay from Piedmont Ave to Highway 194 $2,600,000 2027  
76 US53 Reclaim and overlay from Saint Louis County Rd 109 to Kinmount Creek bridge $25,000,000 Not Selected Project is being developed to be ready if additional funding becomes available
75 MN61 Medium mill and overlay from Superior St to McQuade Rd $5,600,000 2023  
74 MN11 Reconstruction from Highway 332 to 6th Ave W $8,600,000 2027 Also listed as Urbam Pavement project
74 US2 Medium mill and overlay from US169 to 0.4 miles East of Railroad bridge $2,500,000 2024 Also listed as Urban Pavement project
74 MN33 Medium mill and overlay from I-35 to Doddridge Ave $2,200,000 Not Selected Not a district priority, continue to monitor pavement performance
74 US53 Major concrete pavement rehabilitation/Edge Drain from 2nd Ave NW to Wayside Rest $11,000,000 2027  
73 US2 Reclaim and overlay from Highway 194 to E Boundary Ave $13,000,000 2025 Selected prior to policy (in 2019-2028 CHIP), Also listed as an Urban Pavement project
73 MN23 Medium mill and overlay from Highway 107 (district boundary) to I-35 $6,700,000 2028 Selected prior to policy (in 2019-2028 CHIP)
73 MN23 Medium mill and overlay from Hulett Ave to I-35 $3,000,000 Not Selected
73 MN210 Unbonded overlay from Aitkin County Road 81 to Highway 169 $12,000,000 Not Selected
73 US169 Medium mill and overlay from Pokegama Lake Bridge to 0.2 miles south of the bridge $400,000 Not Selected
71 US2 Thick overlay from 1st St to Deer River $500,000 Not Selected
71 MN61 Medium mill and overlay from Railroad bridge to 5th Street crossings $8,700,000 2025 Selected prior to policy (in 2019-2028 CHIP), Also listed as an Urban Pavement project
71 MN61 Medium mill and overlay from 60th Ave to North Superior St $910,000 2028 Selected prior to policy (in 2019-2028 CHIP)
71 MN33 Medium mill and overlay from Highway 2 to north end of the railroad bridge $4,800,000 2027 Selected prior to policy (in 2019-2028 CHIP)
71 MN210 Major concrete pavement repair from Crow Wing/Aitkin County line to Highway 169 $2,200,000 2022 Selected prior to policy (in 2019-2022 STIP)
71 US53 Medium mill and overlay from Highway 33 to bridge 69031 $3,800,000 2027 Selected prior to policy (in 2019-2028 CHIP)
71 US169 Medium mill and overlay from Highway 200 in Hill City $12,000,000 Not selected
70 MN61 Medium mill and overlay from Lake County Highway 22 to Mary St $1,800,000 2028 Selected prior to policy (in 2019-2028 CHIP)
70 MN61 Reconstruction from Reference point 30 to Silver Creek Tunnel $3,700,000 2021 Selected prior to policy (in 2019-2022 STIP)
70 MN210 Medium mill and overlay from east of Highway 73 to 0.4 miles east of I-35 $15,000,000 2029 Selected prior to policy (in 2019-2028 CHIP)
69 MN210 Medium mill and overlay from Highway 169 to Ripple River Bridge $1,400,000 2028 Selected prior to policy (in 2019-2028 CHIP), also listed as an Urban Pavement project
69 US169 Unbonded overlay from Highway 210 to Mississippi River Bridge $5,200,000 Not selected
68 US169 Medium mill and overlay from Aitkin County line to Aitkin County Road 76 $7,500,000 Not selected
67 US71 Thick mill and overlay from the junction of Highways 11 and 71 to Highway 53 $100,000 Not selected
67 MN210 Unbonded overlay from Ripple River to Aitkin County Road $1,400,000 Not selected
67 US169 Medium mill and overlay from Aitkin County Road 76 to Highway 210 $2,200,000 2027 Selected prior to policy (in 2019-2028 CHIP)
66 MN61 Medium mill and overlay from Cook County Highway 7 to Cutface Creek $1,000,000 Not selected
66 US169 Major Concrete pavement repair from County Road 5 to County Road 75 $1,100,000 Not selected
65 MN61 Major concrete pavement rehabilitation/diamond grinding from Lake County Highway 1 to Gooseberry River $500,000 2024 Selected prior to policy (in 2019-2028 CHIP)
65 MN61 Medium mill and overlay from Mary St to Beaver Bay $400,000 Not selected
65 MN210 Medium mill and overlay from East of Carlton County Road 53 to the end of Railroad bridge $600,000 Not selected
65 US169 Reclaim and overlay from Itasca County Highway 67 to County Road 437 $4,400,000 2026 Selected prior to policy (in 2019-2028 CHIP)
65 US169 Reclaim and overlay from Aitkin/Itasca County line to Aitkin County Highway 67 $4,200,000 Not selected
64 US2 Medium mill and overlay from Pinchberry Road to Itasca County Highway 62 $4,200,000 2028 Selected prior to policy (in 2019-2028 CHIP)
64 MN61 Medium mill and overlay from Split Rock Entrance to Lake County Highway 22 $500,000 Not Selected
64 MN210 Full mill and replace from Highway 65 to 1.5 miles west of  Highway 65 $1,300,000 Not Selected
63 US71 Reconstruction from Itasca/Koochiching County line to Highway 1 $17,000,000 Not Selected
63 MN61 Major concrete pavement rehabilitation/diamond grinding within Silver Creek tunnel $1,000,000 2027 Selected prior to policy (in 2019-2028 CHIP)
62 MN61 Reclaim and overlay from Reservation Bay Road to US/Canadian Border $15,000,000 2020 Selected prior to policy (in 2019-2022 STIP)
61 US2 Thick overlay from Highway 46 to Highway 6 $900,000 Not Selected
61 MN33 Medium mill and overlay from Cloquet Ave to St. Louis Bridge $700,000 2025 Also listed as Urban Pavement project
61 MN6 Medium mill and overlay from Big Fork River Bridge to Highway 1 $4,800,000 2028 Ongoing maintenance concerns
59 MN73 Medium mill and overlay from 3rd Ave to Carlton County Road 129 $4,000,000 Not Selected
59 US2 Reclaim and overlay from Floodwood to St. Louis County Road 845 $9,100,000 Not selected
59 MN61 Medium mill and overlay from Gooseberry River to Split Rock River $1,100,000 2028 Ongoing maintenance concerns
59 MN33 Medium mill and overlay from St Louis River to Carlton County Rd 116 $1,800,000 Not selected
59 US2 Reclaim and overlay from Highway 200 to Floodwood $11,000,000 2028 District anticipates the pavement condition will  deteriorate faster than the model is projecting
58 I-535 Major Concrete rehabilitation from Blatnik Bridge to NW end of Railroad Bridge $400,000 2020 Part of Twin Ports Interchange project
57 US53 Medium mill and overlay from Cook to Little Fork River $700,000 Not Selected
56 US2 Medium mill and overlay from St. Louis County Road 874 to Highway 194 $4,000,000 2023 Selected prior to policy (in 2019-2028 CHIP)
56 MN33 Reclaim and overlay from Doddridge Ave to Cloquet Ave $1,500,000 2025 Also listed as an Urban Pavement project 
54 US2 Medium mill and overlay from Bridge 5760 to Itasca County Highway 18 $2,300,000 2022 Ongoing maintenance concerns
52 MN61 Reclaim and overlay from 1.3 miles South of Cutface Creek to 1.8 miles north of Cutface Creek $3,200,000 2028 District anticipates the pavement condition will deteriorate faster than the model is projecting
49 MN210 Urban Reconstruction from Highway 73 to Cromwell $2,000,000 2020 Selected prior to policy (in 2019-2022 STIP)
47 I-35 Reclaim and overlay from Highway 210 to St. Louis River Bridge $7,600,000 2025 Selected prior to policy (in 2019-2028 CHIP)
44 US53 Reclaim and overlay northbound lanes from 1.3 miles north of Swan Lake Road to .1 miles south of Cemetery Road and bridge repair work. $10,000,000 2023 Selected prior to policy (in 2019-2028 CHIP)
44 US53 Diamond Grinding from Highway 169 to Highway 33 $1,600,000 Not Selected
39 MN33 Medium mill and overlay from St. Louis County Rd 116 to Highway 2 $5,300,000 Not Selected
38 MN33 Medium mill and overlay from Railroad bridge to Highway 53 $11,000,000 2028 Inadequate funding for reclaim/reconstruction which scores higher
35 MN73 Medium mill and overlay from Highway 169 to 4th St $600,000 2025 Also listed as Urban Pavement project
34 US169 Diamond Grinding from St. Louis County Road 109 to Highway 53 $300,000 Not Selected
33 MN73 Medium mill and overlay from Highway 73 to 13th St $100,000 2026 Also listed as Urban Pavement project
32 US169 Full mill and replace from Highway 47 to Highway 210 $400,000 Not Selected
30 US169 Reclaim and overlay from St. Louis County Road 5 to Highway 73 $1,400,000 Not Selected
29 MN73 Major concrete pavement rehabilitation from 4th St to Highway 73 $800,000 2026 Selected prior to policy (in 2019-2028 CHIP), Also listed as an Urban Pavement project
28 MN61 Minor concrete rehabilitation from 26th Ave to 28th Ave $100,000 Not Selected
19 US53 Diamond Grinding from 4th St to Piedmont Ave $300,000 2020 Part of Twin Ports Interchange project
17 US53 Minor concrete rehabilitation from I-35 to 4th St $200,000 2020 Part of Twin Ports Interchange project