Increasing the transparency of how we select highway construction projects

Non-National Highway System pavement projects

MnDOT District 2

Scoring criteria for non-national highway system pavement projects. Out of 100 possible points, 60 points are based on the timing of the improvement, 10 points are based on traffic volume, 10 points are based on truck volume, 10 points are based on other infrastructure needs, 5 points are based on the potential to transfer jurisdiction of the road to a city or county, and 5 points are based on the miles covered by the project.

Learn more about how MnDOT evaluates and selects pavement projects

MnDOT scores stretches of highway based on a pavement need when selecting projects to include in the 10-year Capital Highway Investment Plan. Pavement needs on the National Highway System (NHS) are scored and selected separately from pavement needs off the system. MnDOT’s approach to managing pavements follows the guidance and targets in the Transportation Asset Management Plan and the planned outcomes in MnSHIP.

Pavement projects are scored and selected within each district. Potential pavement projects are identified by the Highway Pavement Management Application (HPMA) and by MnDOT District staff.

Once selected, MnDOT then identifies and evaluates alternatives and other needs, legal requirements, issues and opportunities in coordination with local partners, and considers public input. In the process, non-pavement work may be added to a pavement project or a pavement project may be combined with a nearby bridge project. The department follows a context-sensitive complete streets approach, which considers the needs of all users. The final project may address a substantial number of needs beyond the pavement need that precipitated the project. Projects may move years based on local coordination, project delivery, timing of other nearby construction projects, and funding shifts.

What's been selected

Related links

How the projects scored

The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed. View more detailed scores (Excel).

Last updated October 2021

Score Route  Description  High-Level Cost Estimate for Planning Purposes  Year Planned (FY) Comments
88 MN200 Resurface Hwy 200 and replace 2 bridges between Hwy 371 and Hwy 84  $5,600,000 2022 SP 1106-15. Selected prior to the adoption of the scoring policy.
82 MN220 Resurface Hwy 220 between Polk County Road 22 and Alvarado  $4,400,000 2029 6017-1089345
79 MN102 Resurface Hwy 102  $9,900,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
79 MN222 Turnback of Hwy 222 between Hwy 92 and Red Lake County Road 53 in Oklee  $600,000 2022 SP 6306-05. Turnback agreement being processed.
78 MN32 Resurface Hwy 32 between Red Lake Falls and St. Hilaire  $4,700,000 2030 6301-1055080. Scored in 2019
78 MN46 Recondition Hwy 46 between Itasca County Road 39 and Itasca County Road 4  $11,700,000 Not Selected Coordinating funding with another district
78 MN9 Resurface Hwy 9 between the north Norman County line and Crookston  $6,200,000 Not Selected District does not expect pavement segments to deteriorate as fast as model predicts
78 MN172 Resurface Hwy 172  $6,000,000 Not Selected Not a district priority, will continue to monitor pavement performance 
77 MN46 Recondition Hwy 46 between Itasca County Road 4 and Alvwood  $8,200,000 Not Selected Coordinating funding with another district
76 MN46 Recondition Hwy 46 between Alvwood and Northome  $6,700,000 2028 3109-1038979 Scored in 2019
76 US59 Resurface Hwy 59 between Thief River Falls and Newfolden  $8,800,000 Not Selected Distict does not expect pavement segments to deteriorate as fast as model predicts 
76 MN89 Resurface Hwy 89 between Beltrami County Road 705 and 6 miles west of Hwy 1  $6,200,000 2024 SP 0415-17
75 MN72 Resurface Hwy 72 between Hwy 1 and Tamarac River  $10,900,000 2031 0413-1055100. Scored in 2019
75 MN1 Resurface Hwy 1 between Northome and Hwy 6  $11,900,000 Not Selected Coordinating funding with another district
75 MN6 Resurface Hwy 6 between 11th Ave in Deer River and 1.6 miles north of Itasca County Road 136  $6,400,000 Not Selected Coordinating funding with another district
75 US75 Resurface Hwy 75 between Climax and Crookston   $10,400,000 Not Selected Not a district priority, will continue to monitor pavement performance 
75 US75 Resurface Hwy 75 between Norman County Road 25 and Shelly  $8,100,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
74 MN72 Resurface Hwy 72 between Blackduck and Hwy 1  $4,400,000 2030 0142-1038880 Scored in 2019
74 MN87 Reconstruct Hwy 87 between Hubbard County Road 6 and County Road 13 in Hubbard  $3,700,000 2024 SP 2909-17 Scored in 2020
74 MN1 Resurface Hwy 1 between Red Lake Indian Reservation boundary and Hwy 89  $3,400,000 2023 SP 0404-37 Selected prior to the adoption of the selection policy
74 MN11 Resurface Hwy 11 between Loman and Hwy 71  $5,900,000 Not Selected Coordinating funding with another district
74 MN87 Reconstruct Hwy 87 between Hwy 71 and Hubbard County Road 6/Lake St in Hubbard  $2,700,000 2025 SP 2909-20 Scored in 2019
72 MN200 Resurface Hwy 200 between Hwy 92 and Long Lake Park  $2,600,000 Not Selected Not a district priority, will continue to monitor pavement performance 
74 US59 Resurface Hwy 59 between Newfolden and Karlstad  $8,900,000 2031 4506-1073463 Scored in 2020
73 US75 Resurface Hwy 75 between Shelly and Climax  $6,600,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
72 MN6 Resurface Hwy 6 between Hwy 286 and Hwy 1  $4,900,000 2031 3107-1038870. Scored in 2020
57 MN200 Resurface Hwy 200 between ND/MN border and Halstad  $200,000 Not Selected Waiting to coordinate with another project
72 MN220 Resurface Hwy 220 between Climax and Hwy 2  $12,100,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
70 MN1 Resurface Hwy1/Hwy 89 between the north junction of Hwy 89 and eastern Clearwater County line  $9,500,000 2028 0402-1038399. Scored in 2019
70 MN89 Resurface Hwy 89 between Hwy 11 and USA/Canada border  $6,500,000 Not Selected Not a district priority, will continue to monitor pavement performance 
70 MN220 Resurface Hwy 220 between Hwy 1 and Hwy 11  $13,400,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
69 MN11 Resurface Hwy 11 between Clementson and Frontier  $7,900,000 2030 3604-1038038
69 MN11 Resurface Hwy 11 between Frontier and Koochiching County Road 83  $9,500,000 Not Selected Coordinating funding with another district
69 MN87 Resurface Hwy 87 between County Rd 13 and Hwy 64  $3,200,000 2025 SP 2909-18 Scored in 2019
69 MN1 Resurface Hwy 1 between Clearwater County line and Hwy 89  $5,200,000 2031 0403-1038986. Scored in 2019
68 MN72 Resurface 1-mile of Hwy 72 in Blackduck  $500,000 2026 SP 0412-28. Scored in 2019. Tied to a rural pavement project.
68 MN11 Resurface Hwy 11 between Koochiching County Road 83 and Loman  $4,500,000 Not Selected District does not expect pavement segments to deteriorate as fast as model predicts 
68 MN171 Resurface Hwy 171  $800,000 2023 Tied to SP 3509-28. Selected prior to the adoption of the selection policy.
68 US75 Resurface Hwy 75 between Hallock and the Canadian border; resurface Hwy 171 and replace 3 bridges between Hwy 75 and North Dakota border  $7,500,000 2023 SP 3509-28
68 US75 Resurface Hwy 75 and replace 3 culverts between Donaldson and Hallock  $6,300,000 2029 3509-29
67 MN11 Resurface Hwy 11 between Baudette and the east Lake of the Woods County line  $3,400,000 2031 3902-1073483. Scored in 2020
66 MN32 Resurface Hwy 32 between Fertile and Hwy 2  $6,700,000 2028 6007-1038990 Scored in 2019
66 US75 Resurface Hwy 75 between Warren and Stephen  $5,500,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
66 MN87 Resurface Hwy 87 between the southern Hubbard County line and Hwy 64  $400,000 Not Selected Waiting to coordinate with another project
65 US75 Resurface Hwy 75 between Hendrum and Perley  $3,600,000 2029 5406-1038581 Scored in 2019
65 MN89 Resurface Hwy 89 between Grygla and Hwy 219  $2,700,000 2030 4508-1038403 Scored in 2019
65 MN310 Resurface Hwy 310  $3,600,000 Not Selected Waiting to coordinate with another project
64 MN72 Resurface Hwy 72 between Lake of the Woods County Road 83 and Hwy 11  $6,500,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
64 US75 Resurface Hwy 75 between Euclid and Warren  $10,800,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
64 US75 Resurface Hwy 75 between Stephan and Donaldson   $4,900,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
62 MN1 Resurface Hwy 1 between Hwy 72 and Hwy 71  $5,100,000 2031 0405-1038227. Scored in 2019
62 MN92 Resurface Hwy 92 between Trail and Gonvick  $4,300,000 Not selected Not a district priority, will continue to monitor pavement performance 
59 MN92 Resurface and widen shoulders on Hwy 92 between Clearwater County Road 35 and Hwy 200 in Zerkel  $2,700,000 2022 Selected Prior to the adoption of the scoring policy. 1506-41
59 US75 Resurface Hwy 75 between Hwy 2 and Polk County Road 19  $6,300,000 Not Selected
58 MN32 Resurface Hwy 32 between Hwy 2 and Red Lake Falls, and replace culvert on Hwy 32 south of St. Hilaire  $4,200,000 2031 5703-1038053 Scored in 2019
55 MN200 Resurface Hwy 200 between Hwy 71 and Hwy 64  $2,600,000 2031 2908-1038584. Scored in 2019
56 MN308 Resurface Hwy 308  $400,000 Not Selected Waiting to coordinate with another project
57 MN1 Resurface Hwy 1 between MN/ND border and Oslo  $500,000 Not Selected Waiting to coordinate with another project
55 MN1 Resurface Hwy 1 between Goodridge and Beltrami County line  $5,000,000 2030 5704-1038701. Scored in 2019
55 MN200 Resurface Hwy 200 between Hwy 64 and Hubbard County Road 39  $700,000 Not Selected Waiting to coordinate with another project
55 US59 Resurface Hwy 59 between Lake Bronson and Hwy 175  $2,400,000 2026 SP 3506-27 Scored in 2019
51 MN92 Resurface Hwy 92 between Hwy 32 and Brooks  $9,800,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
51 MN200 Resurface Hwy 200 between Hwy 371 and Laporte  $4,800,000 2026 SP 2908-31. Scored in 2019
48 MN32 Resurface Hwy 32 between the south Norman County line and Hwy 200  $4,100,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 
43 MN113 Resurface Hwy 113 between west Hubbard County line and Hwy 71  $4,700,000 Not Selected Waiting to coordinate with another project
40 MN92 Resurface Hwy 92 between Bagley and Gonvick  $8,100,000 2027 SP 1507-68 Scored in 2019
38 MN219 Resurface Hwy 219 between Goodridge and Hwy 89  $7,600,000 2030 4510-1038230. Scored in 2019
55 MN1 Resurface Hwy 1 from Oslo to 2.4 mi E of Oslo  $1,000,000 2025 SP 4501-53. Scored in 2019
30 US59 Resurface Hwy 59 between Karlstad and Lake Bronson  $6,100,000 Not Selected  
29 MN223 Resurface Hwy 223 between Hwy 92 and Clearwater County Road 10 in Leonard  $2,900,000 2024 SP 1508-08. Scored in 2019. RQI forecast does not reflect on the ground conditions. 
27 MN317 Resurface Hwy 317  $500,000 Not Selected
21 MN220 Recondition Hwy 220 between East Grand Forks and Polk County Road 22  $8,200,000 2027 SP 6017-45. RQI forecast does not reflect on the ground conditions
6 MN226 Resurface Hwy 226  $500,000 Not Selected
54 MN1 Resurface Hwy 1 between Marshall County Road 17 and Warren  $9,000,000 2028 4501-1054960 Scored in 2019
30 MN1 Resurface Hwy 1 between east Pennington County line and Hwy 89  $3,400,000 Not Selected
14 MN1 Resurface Hwy 1 between Thief River Falls and Hwy 219  $5,400,000 Not Selected
49 MN200 Resurface Hwy 200 between Roy Lake and Zerkel  $4,300,000 2022 SP 1504-15. Selected prior to the adoption of the scoring policy
61 MN6 Resurface Hwy 6 between 1.6 miles north of Itasca County Road 136 to Hwy 286  $5,800,000 Not Selected
59 MN6 Resurface Hwy 6 between the Bigfork River Bridge and Hwy 6  $3,300,000 Not Selected Coordinating funding with another district
60 MN64 Resurface Hwy 64 between south Hubbard County line and Hwy 87  $3,200,000 Not Selected District does not expect pavement segments to deteriorate as fast as model predicts
74 MN89 Resurface Hwy 89 between Roseau and Wannaska  $2,700,000 2029 6806-32 Scored in 2019
60 MN89 Resurface Hwy 89 between Hwy 219 and Roseau County line  $700,000 2026 4508-35 Scored in 2019
60 MN89 Resurface Hwy 89 between Wannaska and Marshall County line  $3,700,000 2027 6806-31 Scored in 2019
68 MN89 Resurface Hwy 89 between the north jct of Hwy 1 and the northern border of the Red Lake Nation  $2,300,000 2028 0415-1038232 Scored in 2019
58 MN89 Resurface Hwy 89 between Beltrami County Road 26 to Red Lake Nation boundary  $7,200,000 Not Selected District does not expect pavement segment to deteriorate as fast as model predicts 