Community engagement
Winter through spring 2026
During the second phase of engagement, the project team shared the options for each segment with the community and invited residents, business owners, employees and travelers to provide feedback.
Engagement activities included:
- Three public meetings held in Eagan, Inver Grove Heights, and Rosemount.
- Over 400 community members attended and voted for their preferred changes to the Hwy 3 study area.
- A two-week long online survey was conducted where nearly 500 people gave feedback on the proposed changes to the Hwy 3 study area and voted on which options they preferred.
- The project team promoted the in-person meetings and online survey through social media posts and postcards mailed to area residents. The cities of Eagan, Inver Grove Heights and Rosemount also helped share information about these opportunities.
Feedback results:
- The community indicated bicycle and pedestrian safety were a major concern along the corridor, however, there was division on how to address it. Some felt connectivity, separation, and intersection improvements were warranted; others felt existing nearby trails were adequate.
- Segment 1 (Co. Rd. 46 to Co. Rd. 42): Feedback supported expanding this area to either a 3-lane road with a shared center turn lane or a 4-lane divided highway. Feedback also favored a roundabout at Co. Rd. 46/160th St., and a quadrant interchange at Co. Rd. 42/150th St.). There was also a high demand for a bridge or underpass at the Co. Rd. 42/150th St. railroad crossing.
- Segment 2 (Co. Rd. 42 to Connemara Trail): The community generally prefers to retain the existing conditions along Hwy 3 within downtown Rosemount.
- Segment 3 (Connemara Trail to Hwy 149): Participants preferred converting the existing highway configuration to a 2-lane road with a center turn lane and trail. The community broadly opposed realignment alternatives for Hwy 149, with respondents requesting treatments that avoid disturbing the existing natural environment.
- Segment 4 (Hwy 149 to Hwy 55): In this area the community would like Hwy 3 to remain largely as it is to keep its rural feel and scenic views.
- Segment 5 (Hwy 55 to Hwy 62): Community feedback showed support for expanding Hwy 3 to two lanes with a center turn lane and trail. However, residents and property owners also expressed concerns about how the expansion could affect the environment and surrounding properties.
Summer through fall 2025
To reach as many residents, businesses, and road users as possible, both online and in-person engagement tools were used for this study. This included:
- Developing and launching a study website.
- Collaborating with city partner communication professionals to promote events and engagement opportunities. This also included the Independent School District 199 serving the Inver Grove Heights community.
- Multiple social media posts, emails and printed newsletters distributed by the City of Inver Grove Heights, the City of Eagan, the City of Rosemount, Dakota County and ISD 199
- Planning in-person engagement events in each partner city, Inver Grove Heights, Eagan and Rosemount, and Dakota County.
- Five community pop-ups in each partner city and Dakota County
- Dakota County Regional Chamber Board of Directors presentation, American Legion Post 65 Riders discussion and Rosemount business district canvassing.
- Creating online engagement tools for people to use at their convenience including a comment map and survey.
Key themes and insights:
- Safety: Safety was a major concern in all engagement activities. People were especially worried about speeding and poor visibility at certain intersections, such as 65th St., Ann Marie Trail, Bonaire Path and Biscayne Ave. Many also said the curvy section of the road between Jefferson Trail (Hwy 149) and Hwy 55 is very dangerous, especially for motorcyclists and bicyclists.
- Congestion and traffic flow: With new homes and businesses being built along the road, people reported more traffic delays, backups and how difficult it is to access Hwy 3 from side streets. The area between Diffley Rd. and Jefferson Trail was a particular area of concern due to traffic coming from both directions, and a narrow spot near the railroad bridge before the Jefferson Trail intersection. People said it is also hard to reach businesses in downtown Rosemount because of heavy traffic throughout the day.
- Bicycle and pedestrian infrastructure: Many people said there are not enough sidewalks, bike paths, or safe crossings especially near McAndrews Rd. Business owners in downtown Rosemount were also concerned about safety. However, some people were against adding pedestrian and bicycle trails, saying noting that Hwy 3 should be kept as a vehicle only road.
- Environmental impacts: Some people were concerned that widening Hwy 3 or adding bicycle trails would harm the natural beauty of the area as well as decrease the wildlife habitat. Others were concerned about loosing trees and the impact on wetlands.
- Community or land impacts: Residents asked how much private land would be needed, to potentially widen the road or add a trail system, and what detour routes may look like.
- Next steps: The project team is reviewing all public feedback to help shape design options. Representatives from Dakota County, along with the cities of Inver Grove Heights, Eagan and Rosemount will be involved in the development of these design options. The team will share design options with the community and business in early 2026 and ask for more feedback.