About this project

Summary of MnDOT work
- Resurface Hwy 22 from Hwy 212 to Cedar Ave.
- Update sidewalks, driveways and pedestrian crossings along project area to meet Americans with Disabilities (ADA) standards.
Additional construction projects in Glencoe area
- 2020: McLeod County and City of Glencoe are expanding Morningside Dr. Grading will occur in 2020 and road will be paved in 2021.
- 2021: City of Glencoe will resurface 10th St. from Hennepin Ave. to Morningside Dr.
- 2022: MnDOT will construct a J-turn at the intersection of Hwy 212 & McLeod CR 1 and a partial J-turn at the intersection of Hwy 212 & Hwy 22/Chandler Ave. McLeod County will pave five miles of CR 1, from CR 3 south to the county line.
- 2023: MnDOT will resurface Hwy 22 from the intersection of Hwy 212 to Cedar Ave. Upgrading of sidewalks, pedestrian crossings and some driveways are part of the project.