2026 prep work
MnDOT crews will prepare the Hwy 10 corridor for this future 2027-2028 roadwork project.
Morrison and Benton counties
MnDOT crews will prepare the Hwy 10 corridor for this future 2027-2028 roadwork project.
Resurface and improve both directions of Hwy 10 (nine miles each way) from west of Royalton to Iris Rd. near Little Falls; and east of Royalton to the Halfway Crossing, includes a J-turn at the Halfway Crossing (Benton Co. Rd. 40) in 2027-2028.
Note: Scope of work through Royalton is yet to be determined and will not be apart of this 2027 project.