About this project
MnDOT will upgrade seven miles of Hwy 10 from east of Lake Shore Dr. in Big Lake to east of Joplin St. NW in Elk River. The project includes access updates to improve safety and mobility. Roadwork begins in 2029.
Join us!
Public invited to an open house at Big Lake City Hall on Thu, Nov. 19 from 4-6 p.m.
Highlights of work
- Rebuild the road through Big Lake from east of Lake Shore Dr. to Co. Rd. 43
- Replace underground pipes and storm sewer
- Restore and strengthen both directions of road surface (unbonded concrete overlay) between Co. Rd. 43 in Big Lake and west of Joplin St. in Elk River.
- Update access along the corridor with J-turns and updated modern signal systems in Big Lake
- Replace lighting
- Upgrade cable median barrier or guardrail
- Install new pavement markings and shoulder rumble strips
- Add or update pedestrian sidewalks, crossings and multi-use facilities