I-35W

Bloomington

Traffic impacts

I-35W between 82nd Street and 106th Street in Bloomington project location map

I-35W in Bloomington project location map.

View full-size map

All traffic impacts are tentative and weather dependent.

Current

Lane closures

Sun, May 21 through Mon, June 5
Mon, May 1 through mid-June

Ramp closures

Sun, May 21 through Mon, June 5
Mon, May 1 through mid-June

Upcoming

Information about upcoming traffic impacts will be posted as details become available. Motorists can expect lane, ramp and weekend directional closures.

Road closures

10 p.m. Fri, June 2 through 5 a.m. Mon, June 5
10 p.m. Fri, June 9 through 5 a.m. Mon, June 12

Lane closures

10 p.m. Fri, June 2 through 5 a.m. Mon, June 5
  • The SB I-35W E-ZPass lane is closed between 82th St. and 106th St.
10 p.m. Fri, June 9 through 5 a.m. Mon, June 12
  • The SB I-35W E-ZPass lane is closed between 82th St. and 106th St.

About this project

I-35W will be resurfaced in 2023 with additional lanes added between 98th St. and 106th St. Four intersections will receive improved ramps, sidewalks and signals.

Summary of work

  • Resurface freeway
  • Improve drainage
  • Add lanes in both directions between 98th St. and 106th St.
  • Improve ramps, sidewalks and signals at the 90th St., 94th St., 98th St. and 106th St. intersections.