Road closures
5 a.m. Thu, June 23 through mid-August
- EB Hwy 55 is closed between Hwy 5 and Hwy 13
Through 6 p.m. Thu, June 30
- EB Hwy 55 is closed between Hwy 13 and Mendota Heights Rd.
6 a.m. Sat, May 28 through mid-August
- Hwy 55 is closed in both directions between Blue Gentian Rd./Lexington Ave. and Mendota Heights Rd.
Lane closures
9 p.m. Thu, June 23 through 5 a.m. Fri, June 24
- WB I-494 is reduced to one lane between I-35E and Pilot Knob Rd.
Fri, June 24 through Fri, July 1; 8 p.m. to 5 a.m. nightly
- EB I-494 is reduced to one lane in both directions between Pilot Knob Rd. and I-35E
Ramp closures
5 a.m. Thu, June 23 through mid-August
- The following ramps are closed:
- SB Hwy 5 to EB Hwy 55
- EB Hwy 62 to NB Hwy 5
Upcoming
Information about upcoming traffic impacts will be posted as details become available. Motorists can expect full and directional closures with detours.
Ramp closures
7 p.m. Thu, June 30 through 6 a.m. Fri, July 1
- The ramp from EB I-494 to SB I-35E is closed
8 p.m. Mon, June 27 through 5 a.m. Tue, June 28
- The ramp from NB I-35E to I-494 is closed