Minnesota Department of Transportation

511 Travel Info

Design-Build

Bridge deck placement

Hwy 2 in Beltrami County

SP 0406-53, Letting 06/19/09

Project purpose, benefits

Replacement of two bridges with a box culvert 0.4 miles west of TH 89. The project includes bridge demolition, box culvert construction, grading, paving. Estimated Cost: $2.5 to $3.5 million.