Minnesota Department of Transportation

511 Travel Info

Highway 5

Green isle

About this project

Hwy 5 from north of 5th Street in Green Isle to Hwy 212 will be resurfaced in late summer 2020 to provide a smoother road surface, improved drainage and safer rural intersections. Traffic will be detoured during construction.

Summary of work

  • Repave road
  • Repair multiple culverts throughout the project
  • Add centerline and shoulder rumble strips
  • Extend turn lanes at various locations