Minnesota Department of Transportation

511 Travel Info

Hwy 200—Remer

Southeast of Hwy 6, Cass County

Truck haulers plan ahead: Detour mid-August to mid-October

2025 bridge work

MnDOT will replace the Hwy 200 bridge over the Willow River, just southeast of Hwy 6 in Remer, Cass County. A truck and through traffic detour is necessary to complete work.

Hwy 200 Remer project location map: replace bridge over Willow River.

Select project location map to enlarge (PNG)

Summary of work

      • Replace Hwy 200 bridge with a double-box structure
      • Resurface road approaches
      • Update shoulder barriers/railing and ditch slope
      • Install fresh road marks

Upcoming impacts

Prep-work

Aug. 4 to mid-August
    • The current Hwy 200 bridge will remain open to all travelers the first two weeks
    • Motorists to encounter flaggers, slower speeds or sudden stops at the bridge as crews:
      • Install the Hwy 200 truck detour
      • Install a temporary one-lane bypass bridge for local traffic east of Hwy 200, includes temporary portable signals

Hwy 200 truck and through traffic detour

Mid-August to late October

Local traffic

Mid-August - mid-October

Hwy 200 southeast of Hwy 6 in Remer to 74th Ave.

  • A temporary narrow bypass bridge will allow local smaller average size cars/pick-up trucks and emergency responders to cross during construction. Expect:
    • Bridge restrictions: trucks over 40 feet long and/or a 9-ton axle weight
    • Temporary signals at each end
    • Alternate one-way traffic
    • Speed limit 30 mph
    • Drivers should prepare to stop and wait
Hwy 200 work zone
Hwy 200 work zone. Select map to enlarge (PNG)