Minnesota Department of Transportation

511 Travel Info

Hwy 169 Hibbing corridor study 

St. Louis County

About this project

A rendering of the Hwy 169 corridor study through Hibbing.

Click image for full-size image

Summary of work

MnDOT is studying the Hwy 169 corridor through Hibbing from Hwy 37 to 13th Street East. In this stretch, there are 4 signalized intersections, 6 partial controlled intersections and more access points.

There will also be an Intersection Control Evaluation conducted at the Hwy 169 and 37th Street intersection. The traffic signal at this location needs to be replaced.

Alternative concepts

Intersection alternatives have been developed at 13th Street, 15th Street, Howard Street, 23rd Street, 25th Street, Gray Street, 31st Street, 37th Street, 39th Street and two business intersections along Hwy 169 in Hibbing. Look through the alternatives and consider safety improvements, traffic flow, pedestrian and bicycle facilities and other relevant information.

Thank you for taking the time to send your feedback on the alternatives. We are gathering and analyzing your comments, and a summary will be posted online soon.