I-94 Albertville to Monticello work zone. Select image to enlarge
Interstate travelers are now using the newly constructed, permanent six-lane segment—three lanes in each direction
Only remaining two lane areas are at the east and west ends of the work zone used to temporarily shift traffic in the median
The temporary crossovers will be removed and the final third lane built in each direction, closing the gap
Expect periodic single-lane closures in both directions as crews finish the project
Emergency closures: Use nearest exit and follow I-94 alternate route signs
Use 511mn.org for current conditions, including snow and ice weather
About this project
Improve and expand I-94 to six lanes, three in each direction, to close the gap between Albertville and Monticello, Wright County. All six lanes to open late fall 2026.
Summary of work
Reconstruct the road surface
Add a third westbound lane from Co. Rd. 37 in Albertville to west of Hwy 25 in Monticello - COMPLETE
Add a third eastbound lane from west of Hwy 25 in Monticello to Co. Rd. 19 in Albertville - COMPLETE
Replace the westbound bridge over Wright Co. Rd. 19 in Albertville - COMPLETE
Widen the westbound bridge over Co. Rd. 75 in Monticello - COMPLETE
Watch a quick clip to learn about this future I-94 project between Albertville and Monticello.
Source: MnDOT Vimeo Channel
MnDOT Materials and Road Research facility (MnROAD)
When complete in 2026, the westbound lanes in the MnROAD area from Albertville to Monticello will be as they are today—except three lanes. The future test section along westbound I-94, will be for truck traffic only. Drivers will use a entrance ramp from westbound I-94, drive on the test section and use a exit ramp back onto westbound. Signs will signify truckers a road test is in operation and they need to exit ahead. More details to become available when known.